to approve planning application P24/S3690/FUL subject to the following conditions: Standard conditions 1. Commencement 3 years – Full Planning Permission 2. Approved plans * Pre-commencement conditions 3. Schedule of Materials 4. Surface water drainage works (details required) 5. Foul water drainage works 6. Ecology – Bat and Bird boxes 7. Ecology Construction method statement 8. Cycle parking facilities Prior to occupation conditions 9. SUDS compliance report 10. Vision splay dimensions 11. Parking and manoeuvring areas retained 12. Energy statement verification ... view the full minutes text for item 115.
Word for word from the decision South Oxfordshire published for this meeting.Source: democratic.southoxon.gov.uk
Terms and Conditions Use figured dimensions. Do not scale unless for planning purposes. Check dimensions on site before work commences. In case of doubt or to report discrepancies contact WWA. The accuracy of this drawing may be reliant upon third party information. No liability will be accepted by
M id WWA for errors in or arising from such third-party information.
a recipient and may not be copied or reproduced without written consent c ra
d H i ll except by the Planning Authority for public inspection in relation to a Planning Application and only if those copies are marked - ‘"This copy has been made with the authority of Archadia UK Ltd pursuant to Section 47 C ou of the Copyright Designs and Patents Act 1988 for the purposes of public r t fi e ld R inspection only and must not be copied without the prior written o ad permission of the Copyright owner."
SCALE BAR
KEY / NOTES
Red Line Site Boundary (0.298ha)
Wh e atl ey Ro
The Star a
1 0 3 .0 5 dB
ad Inn Bassetts
le Ro 40
1 0 3 .3 6
House 27
Mid d 1 0 3 .5 2
B 24/07/2024 Title block update MHi SP Honeysuckle A 11/09/19 Red line boundary MHi PW Cottage amendment
The REV DATE DESCRIPTION BY CHK Talkhouse House STATUS PLANNING
wwa-studios.com Registered in England & Wales No. 09050329
Agenda Item 9 CLIENT New College, Oxford PROJECT Star Inn, Middle Road, Stanton St John TITLE Location Plan
DRAWN CHECKED REV. Page 105
MHi SP B SCALE DATE
0 25 50 75 100 125 M 1:1250 09/08/19
APPENDIX 1 DOCUMENT ID
638 - WW - B1 - GF - DR - A - L01 638_29_2024-07-10_Star Inn Stanton St John.vwx Terms and Conditions Use figured dimensions. Do not scale unless for planning purposes. Check dimensions on site before work commences. In case of doubt or
Bin Store Collection Point to report discrepancies contact WWA. The accuracy of this drawing may be reliant upon third party information. No liability will be accepted by 15m from refuse turning WWA for errors in or arising from such third-party information.
wicker privacy screen to of the Copyright Designs and Patents Act 1988 for the purposes of public inspection only and must not be copied without the prior written Unit 1 garden permission of the Copyright owner."
SCALE BAR Existing stone wall to be 0 5 10 15 20 25 M retained KEY / NOTES
Red Line Site Boundary Unit 1 Bins
(0.297ha) Rear Garden Low stone wall removed and outdoor terrace XX Unit XX Allocated New timber post and rail Unit 1 extended Parking Space fence with hedgerow Cyc les Cyc les Cyc les
Existing modern flat roof Visitor Parking planting to Unit 2 rear V side garage and rear Space garden boundary Unit 2 Cy cle Rear Garden The Star Inn kitchen stores to be Cycle Parking s CYCLES demolished and adjoining Cy cle s
Space Cy cle s
walls of Public House
C yc le s
C made good
yc Bin storage
le s
B in BINS
s Bins
Bassetts position New timber post and rail 01 01 02 House ASHP
Unit 2 fence with hedgerow 02 ASHP Air Source Heat planting to rear garden Pump position Dotted line denotes soft dig Unit 5 service zone to adoptable Wh
Rear Garden Unit 5 highway turning head e atl
Unit 4 Improved landscaping to P07 21/10/2024 BNG & red line boundary MHi SP ey
updates
HP new dwelling frontage
AS Ro
P06 10/09/2024 ASHPs added to site plan MHi SP Unit 3 frontage a
P05 07/08/2024 Cycle parking provision MHi SP dB
Unit 4 ASHP New dwelling updated
Bins Hedgerow boundary 40
Rear Garden Bins
04 C yc P04 24/07/2024 Site area updated MHi SP New timber post and rail le s
planting retained to Units 4 C yc 27
s le s Cy cle Cy cle s
Read every report as text, not just the decision
Pro opens the officer report behind each decision, searchable and quotable, across every council we cover.
Minutes of the previous meetingRESOLVED : to approve the minutes of the meeting held on 30 August 2026 as a correct record and agree that the Chair ...
Minutes of the previous meetingRESOLVED : to approve the minutes of the meeting held on 15 July 2026 as a correct record and agree that the Chair si...
We use a cookie to keep you signed in and run your free-paper allowance, and an optional one to count visits. You can accept all, or choose. Privacy & cookies
Necessary
Keeps you signed in and runs your free-paper allowance. Always on.
Always on
Analytics
Counts visits and which pages are used. First-party only, no advertising, never shared.