Resolved
RESOLVED that the Board advise the approval of the three flood schemes listed in paragraphs 2.2 to 2.4 as part of the pipeline of flood alleviation and resilience infrastructure.
MCA - Housing and Infrastructure Board approved this item on Wednesday 31 August 2022. Below is the council's own wording, with the papers it was decided on.
Resolved
RESOLVED that the Board advise the approval of the three flood schemes listed in paragraphs 2.2 to 2.4 as part of the pipeline of flood alleviation and resilience infrastructure.
Housing and Infrastructure Board
31 August 2022
Flood Infrastructure – New Pipeline Schemes
Is the paper exempt from the press No and public?
Purpose of this report: Policy Decision
Is this a Key Decision? No
Has it been included on the No Forward Plan?
Director Approving Submission of the Report: John Dowie, Executive Director of Infrastructure and Place (Interim)
Report Author(s): Ryan Shepherd [email protected]
Colin Blackburn [email protected]
Executive Summary This report sets out proposals for adding three new schemes onto the flood alleviation and resilience infrastructure pipeline.
What does this mean for businesses, people and places in South Yorkshire? Investment in these schemes will contribute towards delivering the Connected by Water Plan and reducing flood risk to homes and businesses across South Yorkshire, as well as improving the resilience of places to climate change and potential future flooding.
Recommendations The Board is asked to approve the three flood schemes listed in paragraphs 2.2 to 2.4 as part of the pipeline of flood alleviation and resilience infrastructure.
Consideration by any other Board, Committee, Assurance or Advisory Panel Management Board 16 August 2022 1. Background
1.1In March 2021 the MCA committed £5.5m of Gainshare funding for flood alleviation and resilience, £5m of which has been allocated to schemes as part of the ‘shovel ready’ programme (within the South Yorkshire Priority Programme and forming part of the Connected by Water Plan) with the remaining £0.5m committed for contingencies. Proposals for £0.2m of this contingency funding have been agreed with £0.3m remaining.
1.2Discussion with partners including the Environment Agency and local authorities has established proposals for utilising the remaining Gainshare contingency funding including consideration of the next tranche of schemes which contribute towards flood alleviation and resilience, addressing local priorities and helping deliver the Connected by Water Plan. 1.3 The result of these discussions has been the identification of three new schemes for inclusion onto the flood alleviation and resilience infrastructure pipeline, utilising the remaining £0.3m contingency capital funding. See separate agenda item 9 for the related funding decision.
2. Proposal and justification
2.1The three schemes identified for inclusion in the Project Pipeline are summarised below. Project Mandate forms have been completed for each and the Interim Director of Infrastructure and Place and the SYMCA Executive Management Board have considered these schemes and are supportive of them being added onto the infrastructure Project Pipeline.
2.2Fishlake Flood Risk Management Scheme, Doncaster This scheme is within both the South Yorkshire Priority Flood and Infrastructure Resilience Programme and the Connected by Water Plan (action 2.24). The Environment Agency are considering their options in the area and this additional funding would help the viability of a joined-up approach between organisations. The funding ask is £0.1m and is proposed to be released as development funding which will be utilised to enhance the existing feasibility study work by undertaking an asset rationalisation exercise and development of the preferred option to detailed design stage. It is envisaged that the cost of the full scheme could be in the region of £1m to be funded from existing flood capital resources such as DEFRA Grant in Aid/local authority capital funding. Delivery is anticipated to begin in April 2023.
Pro opens the officer report behind each decision, searchable and quotable, across every council we cover.
PDF |
Fishlake Doncaster PM FormAppendix A | 822 KB | Download |
PDF |
Worsbrough Reservoir PM FormAppendix B | 917 KB | Download |
PDF |
RRFAS Phase 2G Rotherham PM FormAppendix C | 873 KB | Download |
PDF |
Flood Infrastructure: New Pipeline SchemesReport | 422 KB | DownloadRead as text |
Follow MCA - Housing and Infrastructure Board at South Yorkshire Mayoral Combined Authority and we tell you when its next papers are published, before the meeting rather than after it.
| Meeting | Decision | Outcome | |
|---|---|---|---|
| 16 Mar 2023 | Minutes of Previous MeetingRESOLVED that the minutes of the previous meeting held on 8 February 2023 be approved. | Approved | Open |
| 16 Mar 2023 | Matters Arising / Action LogRESOLVED that the Action Log be noted. | Noted | Open |
| 16 Mar 2023 | Programme ApprovalsRESOLVED that the Board: Approve £3m grant award to Sheffield City Council for the “West Bar” project. Approve £1.3m ... | Approved | Open |
| 8 Feb 2023 | Minutes of Previous MeetingRESOLVED that the minutes of the meeting held on 8 December 2022 be approved. | Approved | Open |
| 8 Feb 2023 | Matters Arising / Action LogRESOLVED that the Action Log be noted. | Noted | Open |
We use a cookie to keep you signed in and run your free-paper allowance, and an optional one to count visits. You can accept all, or choose. Privacy & cookies
Keeps you signed in and runs your free-paper allowance. Always on.
Counts visits and which pages are used. First-party only, no advertising, never shared.