Resolved
That planning permission is GRANTED subject to the following conditions: 01 The development hereby permitted shall be begun not later than 3 years beginning with the date of this permission. Reason: Required to be imposed pursuant to Section 91 of the Town and Country Planning Act 1990 02 The development shall be carried out in accordance with the approved plans: 9369/LP/01; 9369/DR/01; 9369/E/01; 9369/ES/01; 9369/GA/01; 9369/LP/01; 9369/P/01 Revision F; 9369/PL02 Revision B; 9369/PL/03 Revision B; 9369/PL/04 Revision B; 9369/PL/05 Revision B; 9369/PL/06 Revision B; 9369/PL07 Revision B, 9368/SL/01 Revision A. Reason: To ensure the development is carried out in accordance with the development plan. 03 The development hereby approved shall be carried out in accordance with the Flood Risk Assessment carried out by AGB Environmental (5th June 2017 reference: P2653.2.1) and drawing 9368/SL/01 Revision A. Reason: To ensure the site is protected to the standard that the development is designed and modelled to within the submitted Flood Risk Assessment National Planning Policy Framework and policy KP2 of Core Strategy. 04 Once occupied the development hereby permitted shall operate at all time in accordance with the reference Flood Evacuation and Warning Plan carried out by Stone Frigate dated April 2017 submitted with this application. Reason: To ensure that the Flood Warning and Evacuation Plan meets with the requirements of the Environment Agency's Flood Warning Service. 05 Unless otherwise agreed in writing with the local planning authority, the development hereby permitted shall be constructed entirely of the materials details of which are shown on the plans and Developers Specification dated 14.09.2017 (reference 9369) hereby approved. Reason: To safeguard character and appearance of surrounding area in accordance with Policy DM1 of the Development Management Document and KP2 and CP4 of the Core Strategy. 06 The development shall not be occupied until garages and car parking spaces have been provided at the site in accordance with drawing 9369/P/01 Revision F, together with properly constructed vehicular accesses to the adjoining highway, all in accordance with the approved plans. The parking spaces shall be permanently retained thereafter for the parking of occupiers of and visitors to the development. Reason: To ensure that adequate car parking is provided and retained to serve the development in accordance with policy CP3 of the Core Strategy (2007) and policy DM15 of the Council’s Development Management Document (2015). 07 Prior to occupation of the proposed development the lower half of the first floor and second windows in the flank elevations of the plots 2 and 7 hereby approved shall be glazed in obscure glass (the glass to be obscure to at least Level 4 on the Pilkington Levels of Privacy, or such equivalent as may be agreed in writing with the local planning authority). In the case of multiple or double glazed units at least one layer of glass ... view the full minutes text for item 344.