Resolved
That planning permission is GRANTED subject to the following conditions: 01 The development hereby permitted shall be begun not later than 3 years beginning with the date of this permission. Reason: Required to be imposed pursuant to Section 91 of the Town and Country Planning Act 1990. 02 The development hereby permitted shall be carried out in accordance with the approved plans 1700-03; 1700-01; 1700-04A; 1700-02A; 1700-06; 1700-07, 1700-08B; 1700-09A Reason: To ensure that the development is carried out in accordance with the policies in the Development Plan. 03 Notwithstanding the details shown on the plans submitted, 1700-08B; 1700-09A submitted otherwise hereby, approved the development hereby permitted shall not commence other than for groundworks and site preparation works unless and until details and appropriately sized samples of the materials to be used for all the external surfaces of the proposal, roller shutters and display board have been submitted to and approved in writing by the Local Planning Authority. The development hereby permitted shall be implemented in full accordance with the details and samples approved under this condition before it is occupied. Reason: To safeguard character and appearance of surrounding area in accordance with the National Planning Policy Framework, Policies KP2 and CP4 of the Core Strategy 2007 and policies DM1 and DM3 of the Development Management Document 2015 and the advice contained within the Design and Townscape Guide 2009. 04 The development hereby permitted shall be carried out in accordance with the mitigation measures set out in the Flood Risk Assessment carried out by Richard Jackson Engineering Consultants dated August 2017 reference 48330. Reason: To ensure the site is protected to the standard that the development is designed and modelled to within the submitted Flood Risk Assessment National Planning Policy Framework and policy KP2 of Core Strategy. 05 The development hereby permitted shall be carried out in accordance with the supporting information received on the 9th August 2017 detailing how the front server of the kiosk will be removed for on-going maintenance of the flood defence as set out on drawings 1700-06 and 1700-07. Notwithstanding the above: The kiosk operator shall be responsible for removing the counter, the fibreglass arch and the floor section, when the Council requires reasonable access for maintenance of the wall. Nonetheless they should have a simple and quick removal method for these structures in case the Council’s contractor requires access, in which event neither the contractor nor the Council shall be liable for storing them or for any damage to them. Reason: To ensure the site is protected to the standard that the development is designed and modelled to within the submitted Flood Risk Assessment and access to the sea wall pursuant to the National Planning Policy Framework and policy KP2 of Core Strategy. 06 ... view the full minutes text for item 346.