Item87
Resolved
That planning permission be GRANTED subject to the following conditions: 01 The development hereby permitted shall begin no later than three years from the date of this decision. Reason: Required to be imposed pursuant to Section 91 of the Town and Country Planning Act 1990. 02 The development hereby permitted shall be carried out in accordance with the approved plans and details; BA/P18-099-101/A, BA/P18-099-120, BA/P18-099-220, BA/P18-099-141, BA/P18-099-401, BA/P18-099-142, BA/P18-099-402, BA/P18-099-144, BA/P18-099-404, BA/P18-099-143, BA/P18-099-403, AHU Technical Data and Noise Impact Assessment and Acoustic Design Report dated 3rd April 2018, project number A3630 by Encon Associates Limited. Reason: To ensure that the development is carried out in accordance with the provisions of the Development Plan. 03 The noise rating level arising from all plant, infrastructure and other installed equipment in association with this permission shall be at least 5dB(A) below the prevailing background noise level with no tonal elements. The LA90 to be determined according to the guidance in BS :4142 at 3.5m from ground floor facades and 1m from all facades above ground floor level to residential premises. The plant, infrastructure and other installed equipment must be maintained to ensure compliance with these levels. Reason: To protect the amenity of people in neighbouring properties and general environmental quality in accordance with National Planning Policy Framework; Core Strategy (2007) policies KP2, CP4; Development Management Document (2015) Policy DM14 and the Design and Townscape Guide (2009). 04 Before the air handling units hereby approved are first used, acoustic screens designed also to visually shield the equipment from residential views shall be erected in accordance with details which shall previously have been submitted to and agreed in writing with the Local Planning Authority and the approved screens shall thereafter be permanently maintained unless and until such time as the air handling units are removed from the building Reason: To protect the amenity of people in neighbouring properties and general environmental quality in accordance with National Planning Policy Framework; Core Strategy (2007) policies KP2, CP4; Development Management Document (2015) Policy DM14 and the Design and Townscape Guide (2009). The Local Planning Authority has acted positively and proactively in determining this application by assessing the proposal against all material considerations, including planning policies and any representations that may have been received and subsequently determining to grant planning permission in accordance with the presumption in favour of sustainable development, as set out within the National Planning Policy Framework. The detailed analysis is set out in a report on the application prepared by officers. Informatives 01 You are advised that in this instance the chargeable amount has been calculated as a zero rate as applicable to an educational and/or community use, in accordance with the Community Infrastructure Levy Regulations 2010 (as amended) and as such no charge is payable. ... view the full minutes text for item 87.
Word for word from the decision Southend-on-Sea published for this meeting.
Source: democracy.southend.gov.uk