Resolved
That planning permission be GRANTED subject to the following conditions: 01 The development hereby permitted shall begin no later than three years from the date of this decision. Reason: Required to be imposed pursuant to Section 91 of the Town and Country Planning Act 1990. 02 The development hereby permitted shall be carried out in accordance with the following approved plan: BA/P18-099-N204/B, BA/P18-099-N200, BA/P18-099-N203/C, BA/P18-099-N205/B, BA/P18-099-N301, BA/P18-099-N350, BA/P18-099-N201/C, BA/P18-099-N141, BA/P18-099-H141, BA/P18-099-N202/C, BA/P18-099-N121, BA/P18-099-H202, BA/P18-099-H401, BA/P18-099-H103, BA/P18-099-N101. Reason: To ensure that the development is carried out in accordance with the provisions of the Development Plan. 03 Notwithstanding the details shown on the plans submitted and otherwise hereby approved, no development shall take place, other than for demolition and construction up to the ground floor slab level, until samples of the materials to be used in the construction of the external elevations of the buildings hereby permitted have been submitted to and approved in writing by the local planning authority. Development shall be carried out only in accordance with the approved details. Reason: To safeguard character and appearance of surrounding area in accordance with Policies KP2 and CP4 of the Core Strategy 2007, Policy DM1 and DM3 of the Development Management Document 2015 and the Design and Townscape Guide 2009. 04 No construction works other than demolition works and construction up to ground floor slab level shall take place until full details of both hard and soft landscape works have been submitted to and approved in writing by the local planning authority. These details shall include: proposed finished levels or contours; hard surfacing materials; Details for the soft landscape works shall include the number, size and location of any trees, shrubs and plants to be planted together with a planting specification, the management of the site (e.g. the uncompacting of the site prior to planting) and the initial tree planting and tree staking details. The approved hard landscaping works shall be carried out prior to first occupation of the development hereby approved and the soft landscaping works within the first planting season following first occupation of the development. Reason: In the interests of visual amenity and the amenities of occupiers and to ensure a satisfactory standard of landscaping pursuant to Policy CP4 of the Core Strategy DPD1 with CP4 of the Core Strategy DPD1 and policies DM1 and DM3 of the Development Management DPD 2015. 05 The photovoltaic solar roof panels shall be implemented in full prior to the first occupation of the buildings as per drawing no. P18-099-N205_B and shall provide at least 10% of the total energy needs of the new buildings. This provision shall be made for the lifetime of the development. Reason: In the interests of providing sustainable development in accordance with the National Planning Policy Framework (NPPF) and Policy KP2 of the Core Strategy (2007). 06 The use ... view the full minutes text for item 313.