Resolved
- That PLANNING PERMISSION be REFUSED subject for the following reasons: 01 The proposed development, by reason of its excessive scale, footprint, mass, siting, unresolved design and materials, is considered to have a detrimental impact on the grain, character and appearance of the site and the wider area and would be an over scaled and incongruous addition to the streetscene . The proposal is therefore unacceptable and contrary to the National Planning Policy Framework (2019), Policies KP2 and CP4 of the Core Strategy (2007), Policies DM1, DM3 and DM6 of the Development Management Document (2015) and the Design and Townscape Guide (2009). 02 The proposal fails to meet the requirements of the Nationally Described Space Standards (2015) in relation to flat F, and the parking arrangements have resulted in an unacceptable outlook in relation to the rear bedroom of Flat C and the development as a whole fails to provide an adequate provision of amenity space for future occupiers. The proposal overall will therefore result in a poor standard of accommodation for future occupiers and is unacceptable and contrary to the National Planning Policy Framework (2019), Policies KP2 and CP4 of the Core Strategy (2007), Policies DM1, DM3 and DM8 of the Development Management Document (2015) and the Design and Townscape Guide (2009). 03The proposed parking arrangements and associated vehicular movements at the site would result in an increased level of noise and disturbance which would be to the detriment of the amenities of 104 Thames Drive. The proposal is therefore unacceptable and contrary to the National Planning Policy Framework (2019), Policies KP2 and CP4 of the Core Strategy (2007), Policies DM1, DM3 and DM6 of the Development Management Document (2015) and the Design and Townscape Guide (2009). 04 The location of the proposed vehicular access, so close to the convergence of Marine Parade, Thames Drive and Belton Way, is such that it cannot safely accommodate the increase in vehicular movements arising from a development of the nature proposed, to the detriment of highway safety and the free flow of traffic. This impact will be exacerbated in peak holiday periods when traffic on these roads becomes saturated by visitor, resident and business journeys. The proposal is therefore unacceptable and contrary to the National Planning Policy Framework (2019), Core Strategy (2007) policies KP2, CP3 and CP4 and policy DM15 of the Development Management Document (2015). The Local Planning Authority has acted positively and proactively in determining this application by identifying matters of concern with the proposal and determining the application within a timely manner, clearly setting out the reason(s) for refusal, allowing the Applicant the opportunity to consider the harm ... view the full minutes text for item 824.