Footway Resurfacing Policy Change

Approved Executive 1 paper

Cabinet approved this item on Tuesday 25 February 2020. Below is the council's own wording, with the papers it was decided on.

Item859

Resolved

The Cabinet considered a report of Executive Director (Neighbourhoods and Environment) seeking approval to amend the policy regarding the materials used for resurfacing of the footpaths in the Borough.
Word for word from the decision Southend-on-Sea published for this meeting. Source: democracy.southend.gov.uk

Follow this further

Built from Southend-on-Sea's papers

What the report saysPro

Report to Cabinet

Purpose of report

1.1This report seeks approval to amend the policy regarding the materials used for resurfacing of our footpaths in the Borough.

Recommendations

The Cabinet are recommended to agree:

(i) Note the content of the report

(ii) Agree to the officer recommendations for the change of material

(iii) Agree to 2020/21 programme

3. Introduction

3.1The majority of carriageways and footways in the Borough were built within the last 100 years. Many of these were either constructed at the same time as part of large estate developments or are evolved roads (i.e. of minimal construction). The network is now aging/deteriorating at comparable rates and the reactive works are putting pressure on the maintenance budgets.

3.2Due to the current issues with reactive maintenance budget spends, particularly around the flagged paving, Southend are proposing to switch to a strategy of replacing Artificial Stone Paving (ASP) and red asphalt surfacing in favour of black asphalt as they reach end of life.

Footway Resurfacing Policy Change Report Number: 20/005 4. Background

4.1Currently the Councils’ footways consist of four principal materials;

 Imperial size Artificial Stone Paving (ASP)  Metric size Artificial Stone Paving (ASP)  Red asphalt surfacing  Black asphalt surfacing

Historically, the Council has adopted a principle of ‘like for like’ replacement. However in recent years a number of factors have affected the viability of adopting a like for like approach. These include:

 Tree root activity in footways with ASP, which causes damage.  ASP, not being flexible, heaves under root activity causing trips and hazards, which frequently exceed the Council’s accepted safety limits, and make them Cat 1 defects and therefore require immediate repair.  It is more challenging replace like for like in these circumstances and the usual practice is to ‘make safe’ with black asphalt patching. This gives a patchwork effect.  This can look rather unsightly if done as individual slab replacement. A more appropriate solution would be to carry out a more extensive ‘full width patch. However, the ad hoc and minor repairs budget is currently insufficient to meet the Council’s obligations to complete all the identified safety works.  Red asphalt always fades therefore the colour will never be matched with a patch. Red asphalt is also not widely used and therefore there is always a need to spend more than required due to the minimum order value.

4.2The Council has a mixture of footways paved with historic Imperial ASP and new Metric ASP. The sizes of Imperial and matric are: 610 x 610mm & 600 x 600mm respectively. Metric slabs are therefore 10mm shorter than Imperial slabs, which means that where Imperial is replaced with Metric there is a 10mm gap, which requires a cement fillet, which looks unsightly and is liable to fail.

4.3The Council’s Highways Maintenance Term Contractor has limited quantity in store, and when possible, salvages old slabs from footway resurfacing schemes to take to store. This second-hand Imperial stock held in store is then used for individual slab replacement. However, this store is nearly exhausted, and sourcing new Imperial slabs is proving to be uneconomical.

4.4Metric slabs are in common use; however the manufacturer will only manufacture once a sufficient quantity has been ordered to make a production run viable. Therefore, larger quantities have to be ordered and stored by the council – at an additional cost.

Read every report as text, not just the decision

Pro opens the officer report behind each decision, searchable and quotable, across every council we cover.

Papers for this item

Kept in our archive, download once signed in
PDF
Footway Resurfacing Policy ChangeReport 417 KB DownloadRead as text

At this meeting

Whole meeting

Who was there

7 of 28 attended
SB
Sarah BakerOfficer, expected
AG
Alison GriffinOfficer, in attendance
JW
John WilliamsOfficer, in attendance
SL
Simon LeftleyOfficer, expected
AL
Andrew LewisOfficer, in attendance
AA
Andrea AthertonOfficer, expected
JC
Joe ChestertonOfficer, in attendance
JR
Joanna RuffleOfficer, in attendance
CG
Colin GambleOfficer, in attendance
IG
Councillor Ian GilbertChair, present
RW
Councillor Ron WoodleyVice-Chair, present
TH
Councillor Trevor HarpCommittee Member, present

All 28 on the meeting page

More from Southend-on-Sea Cabinet

All decisions
MeetingDecisionOutcome
12 Oct 2026 Minutes of the Meeting held on Monday, 7 September 2026That the Minutes of the Meeting held on Monday 7 September 2026 be amended to correct the typographical error in minu... Decided Open
12 Oct 2026 Decisions taken by, or in consultation with, Cabinet MembersThat the decisions taken by, or in consultation with, the relevant Cabinet Members since the last Cabinet meeting be ... Noted Open
12 Oct 2026 Official Feed and Food Control Service Plan 2026-27That the achievements delivered against the Official Feed and Food Control Service Plan 2025/26 be noted. 2. That the... Noted Open
12 Oct 2026 Income Contract with Castle Point Borough Council for CCTV System ManagementThat it be agreed to enter into a contract with Castle Point Borough Council for the provision of CCTV Services to Ca... Agreed Open
12 Oct 2026 Procurement of a Stairlift Installation, Maintenance & Removal ServiceThat approval be given to undertake a procurement exercise to establish a Framework Agreement for the provision of a ... Approved Open

We use a cookie to keep you signed in and run your free-paper allowance, and an optional one to count visits. You can accept all, or choose. Privacy & cookies