The Cabinet considered a report of the Deputy Chief Executive and Executive Director (Growth and Housing) highlighting the limited remaining operational lifespan of the cremators and associated equipment at Sutton Road Crematorium and the potential use of electric cremators along with the funding requirements for the refurbishment of the facility.
Word for word from the decision Southend-on-Sea published for this meeting.Source: democracy.southend.gov.uk
1.1To highlight the limited remaining operational lifespan of the cremators and associated equipment at Sutton Road Crematorium.
1.2To seek approval on the approach to be taken regarding securing cremation services over the next twenty-five years.
1.3To highlight the potential use of electric cremators as an alternative to gas cremators and the potential benefits these can have in reducing carbon emissions.
1.4To highlight the existing funding within the capital programme for refurbishing the facility, subject to business case, and the requirement for additional funding if electric cremators are the preferred option.
Recommendations
2.1Agree to continue to provide crematorium facilities within Southend-on- Sea.
2.2Note the problems with the existing facilities as set out in Appendix 1.
2.3Note that without the replacement of the cremators and works to the building the provision of a crematorium service in the short to medium term will not be possible.
Refurbishment of Crematorium and Replacement of Page 1 of 8 Report Number: 20/010 Cremators 2.4 Note the potential environmental benefits that the installation of electric cremators could bring and the additional capital expenditure that this would require (exact level of investment to be determined).
2.5Agree that the option of electric cremators and other options that would have environmental benefits can be considered during the project development.
2.6Note the predicted cost to fund the replacement of the cremators, associated plant and building refurbishments as outlined in paragraph 6.3.
2.7Delegate authority to the Executive Director of Neighbourhoods and Environment to carry out the refurbishment and replacement of the cremators.
Background
3.1The Crematorium at Southend-on-Sea was constructed in November 1953 and contained three cremators. In 1986/87 the cremators were replaced and the number increased to six. In 1999/2000 the cremators were replaced again but the number reduced to five, this replacement was as a result of changes in legislation, which meant the existing cremators could no longer be used.
3.2In 2009 after an inspection of the chimney, it was reported that the structure was starting to decline. The condition of the stack was monitored, and the condition was confirmed as declining. In 2018 the structure of the stack had declined to such an extent that temporary props needed to be installed. At this time, plans were also considered for its rebuild. However, due to other issues with the cremators and plant, it was decided to postpone any works and to consider a more coordinated project.
3.3In April 2010 the cremation facilities were reviewed again, and the number of cremators reduced to three. However, at this time one of the cremators was replaced with a larger cremation unit to facilitate the increasing number of requests to accommodate larger coffins. At this time an abatement system was installed to address mercury emissions.
3.4In 2010, works were also undertaken to some of the front of house facilities, namely the chapels.
3.5The change in cremator units and associated plant over the years, including the need to install a refrigeration unit has resulted in the layout of the building, especially back of house, becoming fragmented causing inefficient operation and problems such as lack of suitable storage for cremated remains.
3.6Surveys have raised a number of problems with the existing facilities including structural problems with the buildings and two of the cremators that are at end of life and no longer have guaranteed supported by the manufactures.
Read every report as text, not just the decision
Pro opens the officer report behind each decision, searchable and quotable, across every council we cover.
We use a cookie to keep you signed in and run your free-paper allowance, and an optional one to count visits. You can accept all, or choose. Privacy & cookies
Necessary
Keeps you signed in and runs your free-paper allowance. Always on.
Always on
Analytics
Counts visits and which pages are used. First-party only, no advertising, never shared.