Resolved
- That planning permission be GRANTED subject to the following conditions: 01 The development hereby permitted shall begin not later than 3rd October 2021 Reason: Required to be imposed pursuant to Section 91 of the Town and Country Planning Act 1990. 02 The development hereby permitted shall be carried out in accordance with the following approved plans: 911.001C (Location Plan) ; 911.51; 911.002; 911.1; 911.2; 911.3; 911.4 A & B; 911.4 C & D; 911.5; 911.6; W.911.6; 911.7; 911.8; 911.9; 911.11; 911.12; 911.13 A & B; 911.13 C; 911.14; 911.15; 911.16; 911.17; 911.18; 911.19; 911.20; 911.21; 911.22; 911.23A; 911.25A; 911.26; 911.27; 911.28; 911.29; 911.30; 911.31; 911.32 Rev A; 911.33A; 911.34; 911.35; 911.36; 911.37 Rev A; 911.38; 911.39; 911.40 A & B; 911.40 C & D and 911.41. Reason: To ensure that the development is carried out in accordance with the policies in the Development Plan. 03 In respect of all sites hereby approved, details of the design and colour of the external surfaces of the posts and poles and associated structures plus, in respect of sites 17, 27, 30, 31 and 39 the detailed locations, sizes and design details of the polycarbonate and steel sheet fixings, shall be submitted to the Local Planning Authority and approved in writing prior to the commencement of the development at a particular site. Each individual pole, post or structure hereby approved shall be implemented in full accordance with the details approved under this condition within 6 months of the erection of that particular pole, post or structure. Notwithstanding the details shown on the plans submitted and otherwise hereby approved the pole erected outside the boundary of 70 and 72 Eastbourne Grove (Site 21) shall be chamfered above a height no less than 1m above ground level to a diameter of 76mm in accordance with details which shall previously have been submitted to and approved in writing by the Local Planning Authority. Reason: To safeguard character and appearance of surrounding area in accordance with the National Planning Policy Framework Policies KP2 and CP4 of the Core Strategy 2007 and policies DM1 and DM3 of the Development Management 2015 and the advice contained within the Design and Townscape Guide 2009. 04 A Construction, Management and Maintenance Strategy, for all works hereby approved on or adjacent to the public highway, including details of the management arrangements for implementation of the works hereby approved, shall be submitted to and approved in writing by the Local Planning Authority, in consultation with Local Highway Authority, prior to the commencement of the development. The Construction and Maintenance Strategy submitted shall include details on how the Eruv structure (poles, posts, associated structures and wire) would be constructed and ... view the full minutes text for item 32.