Resolved
- That planning permission be GRANTED subject to the following conditions: 01 The development hereby permitted shall begin not later than three years from the date of this decision. Reason: Required to be imposed pursuant to Section 91 of the Town and Country Planning Act 1990 02 The development hereby permitted shall be carried out in accordance with the following approved plans Location Plan, 001 (11.05.21), 002 (11.05.21), 003 (11.05.21), 004 (11.05.01), 005 (11.05.21), 006 (11.05.21.21), 007 (11.05.21), 008 (11.05.21) Reason: To ensure that the development is carried out in accordance with the Development Plan. 03 Notwithstanding the details shown on the plans submitted and otherwise hereby approved, no construction works other than demolition and construction up to ground floor slab level shall take place unless and until full product details of the materials to be used on all the external elevations, including walls, bays and balconies, roof, eaves and roof terraces, windows and doors, entrance glazing and porch, fascia and soffits, balcony balustrades and privacy screen, bin and cycle stores, rainwater goods and boundaries have been submitted to and approved in writing by the Local Planning Authority. The development shall be carried out in accordance with the approved details before it is brought into first use. Reason: To safeguard the visual amenities of the area, in accordance with the National Planning Policy Framework (2019) Core Strategy (2007) policies KP2 and CP4, Development Management Document (2015) Policy DM1 and advice contained within the Southend Design and Townscape Guide (2009). 04 Notwithstanding the details shown on the plans submitted and otherwise hereby approved, no construction works ground floor slab level shall take place unless and until full detailed design drawings and cross sections of the main entrance and porch, projecting bay and balconies including balustrade, projecting eaves detail including soffits, windows and doors including reveals and framing, flat roof ridge edge detail, tile hanging and brick decoration, at a scale of 1:20 or 1:10 as appropriate have first been submitted to and agreed in writing by the Local Planning Authority. The development shall be carried out in accordance with the approved details before it is brought into use. Reason: To safeguard the visual amenities of the area, in accordance with the National Planning Policy Framework (2019) Core Strategy (2007) policy KP2 and CP4, Development Management Document (2015) Policy DM1 and advice contained within the Southend Design and Townscape Guide (2009). 05 The proposed first floor window in the south elevation of unit 7 of the ... view the full minutes text for item 29.