Resolved
PLANNING PERMISSION GRANTED subject to the following conditions: 1 The development hereby permitted shall begin no later than three years of the date of this decision. Reason: Required to be imposed pursuant to Section 91 of the Town and Country Planning Act 1990 2 The development hereby permitted shall be carried out in accordance with the following approved plans: 1705-15a; 1705-16a Reason: To ensure that the development is carried out in accordance with the Development Plan. 3 Before the development hereby approved is first used the materials used on the external surfaces of the development must match those used on the external surfaces of the existing building. This applies unless differences are shown on submitted plans. Reason: In the interests of visual amenity and to ensure that the appearance of the building makes a positive contribution to the character and appearance of the area. This is as set out in the National Planning Policy Framework (2021), Core Strategy (2007) Policy KP2 and CP4, Development Management Document (2015) Policy DM1, and advice contained in the Southend-on Sea Design and Townscape Guide (2009). 4 The dry storage area of the outbuilding hereby permitted shall not be used at any time other than for purposes wholly ancillary to the commercial operation of the ground floor business unit known as 54 The Ridgeway. Reason: In the interests of the residential amenity of the adjoining residents and to ensure that the development complies with the National Planning Policy Framework (2021), Core Strategy (2007) Policies KP2 and CP4, Development Management Document (2015) policies DM1 and DM3 and The Southend-on-Sea Design and Townscape Guide (2009). 5 Before any external lighting is installed in association with the outbuilding hereby permitted details of its location, design and specification shall have been submitted to and approved in writing by the Local Planning Authority. The lighting shall be installed solely in accordance with the approved details. Reason: In the interests of the amenities of the area and nearby residents, in accordance with Policies DM1 and DM3 of the Development Management Document (2015) and Policies KP2 and CP4 of the Core Strategy (2007). 6 No plant equipment or machinery shall be installed or operated at the site unless a noise impact assessment (conducted out by a competent person) has previously been carried out, submitted to and approved in writing by the Local Planning Authority. The assessment must be made using the appropriate standards and methodology for the noise sources and the relevant best practice. The plant equipment shall thereafter be implemented in full accordance with the details and mitigation provided in the approved Noise Impact Assessment before it is first brought into use and shall be maintained as such in perpetuity thereafter. Reason: In the interest of the residential ... view the full minutes text for item 25.