Resolved
PLANNING PERMISSION GRANTED subject to the following conditions: 01 The development hereby permitted shall begin not later than three years from the date of this decision. Reason: Required to be imposed pursuant to Section 91 of the Town and Country Planning Act 1990. 02 The development hereby permitted shall be carried out in accordance with the following approved plans 732-P01-Rev A, 732-P03B- Rev G. Reason: To ensure that the development is carried out in accordance with the provisions of the Development Plan. 03 The replacement shopfront within the development hereby approved including the bifold doors including stallriser panel detail, fanlights, relocated door and fascia shall only be finished in painted timber. Prior to first operation of the rear flue the following shall have been completed at the site: a) the flue shall have been spray painted to reasonably match the colour of the host building or in accordance with details of any other external treatment which have previously been submitted to and approved in writing by the Local Planning Authority under the terms of this condition, b) the screen balustrading shall have been erected in accordance with the details shown on drawing number 732-P03B – Rev G and c) the new shopfront and fascia shall have been completed in accordance with the details on drawing 732-P03B- Rev G Reason: To safeguard the visual amenities of the conservation area, including the weight attached as part of a balanced assessment taking account of the benefits to the building and Conservation Area attributed to the new shopfront and fascia which is all in accordance with the National Planning Policy Framework (2021) Core Strategy (2007) policy KP2 and CP4, Development Management Document (2015) Policies DM1 and DM5 and advice contained within the Southend-on-Sea Design and Townscape Guide (2009), the National Design Guide (2021) and Leigh Cliff Conservation Area Appraisal (2021). 04 Prior to first operation of the extraction flue system hereby approved, the noise mitigation measures as detailed in the Noise Impact Assessment Report - Kitchen Extraction System 55 Broadway, Leigh-On-Sea SA9 1PE for Picante Leigh-On-Sea by Sound Licensing Limited and dated 27 April 2022 (revision 1) shall be implemented, installed by competent persons and completed at the site in full accordance with those mitigation measure details. Additionally, prior to first operation of the development hereby approved, a post completion noise survey must be undertaken by a suitably qualified acoustic consultant, and a report submitted to and approved in writing by the Local Planning Authority. The post completion testing shall assess performance of the noise mitigation measures against the noise levels as set in the post- completion testing report. If the mitigation measures tested in the post-completion report prove to be insufficient, details of additional noise mitigation measures (where necessary to ensure the appropriate noise levels can be met), shall be submitted to and approved in writing by the Local Authority ... view the full minutes text for item 28.