Resolved
- That planning permission be GRANTED subject to the following conditions: 01 The development hereby permitted shall begin no later than 3 (three) years from the date of this decision. Reason: Required to be imposed pursuant to Section 91 of the Town and Country Planning Act 1990. 02 The development hereby permitted shall be carried out strictly in accordance with the approved plans: 1447- 01 Rev A, 1447 – 02 Rev F, 1447 – 03 Rev G, 1447-04 Rev D & 1447 – 05 Rev B. Reason: To ensure that the development is carried out in accordance with provisions of the Development Plan. 03 Prior to commencement of any drainage related works associated with the development hereby approved, a drainage scheme comprising details of drainage infrastructure (including any Sustainable Urban Drainage Systems (Suds), foul and surface water drainage infrastructure, connection points and discharge rates) and a drainage management plan shall be submitted to and approved in writing by the Local Planning Authority under the terms of this condition. The development shall only be constructed in accordance with the approved details. Reason: This condition is required to prevent flooding, drainage, environmental and amenity problems arising from the development, in accordance with the National Planning Policy Framework (2021) and Policies KP1 and KP2 of the Core Strategy (2007). 04 Notwithstanding the details shown on the submitted plans otherwise hereby approved the development hereby permitted shall not commence other than for groundworks and site preparation works unless and until full details including section details as appropriate and full specifications of the materials to be used for all the external surfaces of the approved building at the site including for elevations, face and engineering brickwork, bath stone panels, curtain and all other glazing, aluminium fins, doors, windows, louvres, roofing materials, concealed gutters, rainwater goods, lighting and signage have been submitted to and approved in writing by the Local Planning Authority under the terms of this condition. The development hereby permitted shall be implemented and completed in full accordance with the details and/or samples approved under this condition before it is first occupied. Reason: In the interests of visual amenity and to ensure that the appearance of the building makes a positive contribution to the character and appearance of this prominent corner site and its surroundings. This is as set out in the National Planning Policy Framework (2021), Core Strategy (2007) Policies KP2 and CP4, Development Management Document (2015) Policies DM1 and DM3, and the guidance contained within the National Design Guide (2021) and the Southend-on-Sea Design and Townscape Guide (2009). 05 The development hereby approved shall not be first used unless and until a ... view the full minutes text for item 10.