Resolved
- That planning permission be GRANTED subject to the following conditions: 01 The development hereby permitted shall be begun not later than 3 years beginning with the date of this permission. Reason: Required to be imposed pursuant to Section 91 of the Town and Country Planning Act 1990. 02 The development shall be carried out in accordance with the approved plans: BG/NAK/01 Rev D; BG/NAK/02 Rev D; BG/NAK/03 Rev D; BG/NAK/04 Rev D; BG/NAK/05 Rev D Reason: To ensure the development is carried out in accordance with the development plan. 03 All new work to the outside of the development hereby approved must match existing the original building in terms of the choice of materials and finished appearance. This applies unless differences are shown on the drawings hereby approved or are required by conditions to this permission. Reason: In the interests of visual amenity and to ensure that the appearance of the development makes a positive contribution to the character and appearance of the area. This is as set out in the National Planning Policy Framework (2021), Core Strategy (2007) Policies KP2 and CP4, Development Management Document (2015) Policy DM1 and advice in the National Design Guide (Rev 2021) and the Southend-on-Sea Design and Townscape Guide (2009). 04 The windows in the west flank elevation of the pool enclosure hereby approved shall only be glazed in obscure glass (the glass to be obscure to at least Level 4 on the Pilkington Levels of Privacy, or equivalent) and be permanently fixed shut, except for any top hung fan light which shall be a minimum of 1.7 metres above internal finished floor level of the room served by that window. In the case of multiple or double-glazed units at least one layer of glass in the relevant units shall be glazed in obscure glass to at least Level 4. The windows shall be retained as such for the lifetime of the development. Reason: In the interest of the residential amenity of nearby occupiers in accordance with the National Planning Policy Framework (2021), Policies KP2 and CP4 of the Core Strategy (2007), Policies DM1 and DM3 of the Development Management Document (2015). 05 Prior to first operation of the development hereby approved, a noise impact assessment and sound insulation scheme to control the emission of sound from the pool enclosure and newly located pump room, shall be submitted to and approved in writing by the Local Planning Authority. The scheme shall consider the need for extract ventilation and maintaining thermal comfort. Noise from any plant and equipment used to provide this shall be limited to 10 dB (A) below the background noise level measured and expressed ... view the full minutes text for item 5.