- That the discharge of the following condition be approved: Condition 03 (Strategy for Lorry Movements) (Earthworks phase only) The details of the lorry monitoring procedure, as set out in the Strategy for Lorry Movements, Land Between Barge Pier Road and Ness Road, Shoeburyness Revision B dated 20.06.2024, are acceptable and agreed in accordance with the requirements of condition 03 of planning permission reference 22/01602/RES in relation to the construction of the raised development platforms only. Informative 01 The applicant is advised that this approved Lorry Movements Strategy would apply to any version of the engineering stage Construction Management Plan which may be submitted to and approved in writing by the Local Planning Authority.
Word for word from the decision Southend-on-Sea published for this meeting.Source: democracy.southend.gov.uk
Proposal: Application for approval of details pursuant to condition 03 (strategy for lorry movements) of planning permission 22/01602/RES dated 02.12.2022 (Earthworks phase only)
Address: Land Between Barge Pier Road and Ness Road, Shoeburyness, Southend-on-Sea, Essex
Applicant: Bellway Homes Limited (Essex)
Agent: [name removed] of Savills
Consultation Expiry: 04.06.2024
Expiry Date: 26.07.24
Case Officer: Abbie Greenwood
Plan Nos: N/A Strategy for Lorry Movements, Land Between Barge Pier Additional information: Road and Ness Road, Shoeburyness Revision B dated 20.06.24
Recommendation: APPROVE DETAILS 1 Site and Surroundings
1.1The application site consists of 2 parcels of land totalling some 8.51 hectares (ha); the larger of the two (7.1 ha) is to the west of New Barge Pier Road, to the south of the Lidl store and to the east of dwellings in Ness Road. The smaller site (1.4 ha) is to the east of New Barge Pier Road, directly south of Hinguar School and to the north of the Gunners Park play area and adjacent to the rear gardens of dwellings in Ashes Road. The site is undeveloped except for an existing access road which was constructed as part of the wider Garrison development. The site is relatively flat lying at 1-3m AOD (Above Ordnance Datum).
1.2The wider surrounding area is mixed in character. To the west and east of the site it is predominately residential. The housing to the east of the site is relatively new and was developed as part of the Garrison redevelopment (ref. 00/00777/OUT). To the north of the site are commercial uses and a school and the land to the south is undeveloped nature reserve and SSSI.
1.3The Shoebury Garrison Conservation Area, including a number of listed buildings, is located some 120m to the east of the site; with the boundary running along Boundary Way, Magazine Road and St George’s Lane.
1.4The larger, western part of the site is bounded by Barge Pier Ditch to the east (within the application site boundary) and New Barge Pier Road to the south and by the River Shoe/flood alleviation ditch (C-X Ditch) to the west (outside the site boundary). There are no public rights of way on the site, however, there are two footpaths running through the site, one running north-south from New Barge Pier Road to Campfield Road along the western site boundary, which largely falls outside the site, the other runs east-west between Ness Road and Magazine Road.
1.5The land to the south and southeast of the site is Gunners Park public open space which is allocated as ‘Protected Green Space’ with the land to the immediate south of the main part of the site also designated as a Local Wildlife Site (LWS), Site of Special Scientific Interest (SSSI) and Local Nature Reserve. Further south, this part of the Estuary constitutes a SSSI, Special Protection Area (SPA), RAMSAR and Local Nature Reserve.
1.6The application site has no specific allocation within the Development Management Document Proposals Map. Within the Core Strategy Key Diagram the general location of the site is allocated as an Industrial/Employment Area. The Key Diagram also allocates the site to provide a primary care centre. According to the Environment Agency Flood Maps, the entire site is located within Flood Zone 3.
2 The Proposal
Read every report as text, not just the decision
Pro opens the officer report behind each decision, searchable and quotable, across every council we cover.
We use a cookie to keep you signed in and run your free-paper allowance, and an optional one to count visits. You can accept all, or choose. Privacy & cookies
Necessary
Keeps you signed in and runs your free-paper allowance. Always on.
Always on
Analytics
Counts visits and which pages are used. First-party only, no advertising, never shared.