Peckham and Nunhead Community Council agreed this item on Wednesday 21 November 2012. Below is the council's own wording, with the papers it was decided on.
That the community council agree the recommendations made to the cabinet member for Environment, Transport and Recycling to approve the implementation of the Brockley Way Zebra Crossing project (funded by the Cleaner Greener Safer programme) subject to statutory consultation. 9.20 pm
Word for word from the decision Southwark published for this meeting.Source: moderngov.southwark.gov.uk
Report to Peckham and Nunhead Community Council, 22 pages
Background
1.1.1 This document report has been produced by the London Borough of Southwark Public Realm Projects Group, to provide a summary of the consultation exercise for a proposed zebra crossing in Brockley Way SE15. The measures are being drafted by the Public Realm Projects Team, with the project manager for this scheme being Chris Mascord (Senior Engineer).
1.1.2 The area under consideration is located within the SE15 district of Southwark (Nunhead) in the centre of the borough. See figure 1 below.
Figure 1: Location of proposed scheme
1.2Project and Objectives
1.2.1 The measures proposed in this consultation are part of the Council’s ongoing commitment to make Southwark’s streets safer and more accessible for all. The proposed measures will assist to enhance the environment for all road users, reducing traffic speeds and improving pedestrian safety.
1.2.3 It is proposed that new zebra crossing is introduced on Brockley Way adjacent to Athenlay Road junction. Additional measures include:
A footway buildout on the northern side of Brockley Way. This measure will reduce carriageway width and crossing distance for pedestrians as well as acting as a traffic calming feature. Public Realm Projects 4 November 2012 London Borough of Southwark Brockley Way – Zebra Crossing Public Consultation Summary
A street tree is proposed to be planted on the footway buildout to improve the visual quality of the streetscape.
There are also parking restrictions associated with the zebra crossing to ensure that there is adequate visibility on approach to the crossing location. These have been kept to a minimum, but are essential to ensure the safety of pedestrians using the crossing facility.
See Appendix A for drawing of proposed scheme
1.3Consultation Procedure
1.3.1 The views of the local community and those of statutory consultees have been sought, prior to the development of measures to a detailed design stage. Active community participation was encouraged through the use of a consultation document and questionnaire (see Appendix B – Consultation Documents).
1.3.2 The consultation document included a covering letter describing the proposals and a request for comments (including information to assist in translation and large print versions of the consultation document), preliminary design drawings (A3 size) and a questionnaire/comment form that could be sent to the Public Realm Projects Group with a pre-paid address reply.
Read every report as text, not just the decision
Pro opens the officer report behind each decision, searchable and quotable, across every council we cover.
Minutes from the previous meetingThat the minutes be deferred until the next meeting in order to make amendments to the following: Item 7, Allocation ...
We use a cookie to keep you signed in and run your free-paper allowance, and an optional one to count visits. You can accept all, or choose. Privacy & cookies
Necessary
Keeps you signed in and runs your free-paper allowance. Always on.
Always on
Analytics
Counts visits and which pages are used. First-party only, no advertising, never shared.