East Dulwich Tabernacle Church, 107 Barry Road, London SE22 0HW
DecidedPlanning3 papers
Planning Sub-Committee A (decommissioned, for planning committees after decided this item on Saturday 20 May 2023. Below is the council's own wording, with the papers it was decided on.
That planning permission for application number 13/AP/3694 be granted with conditions, as set out in the report and addendum report, and with an additional condition stipulating that satisfactory details regarding the ramp on the inside of building be submitted. At this point the meeting took a 10-minute comfort break and resumed at 8.05pm.
Word for word from the decision Southwark published for this meeting.Source: moderngov.southwark.gov.uk
Report to Planning Sub-Committee A (decommissioned, for planning committees after, 11 pages
Recommendation
1. That the application is referred to the planning sub-committee for consideration; and that full planning permission is granted subject to condition.
BACKGROUND INFORMATION
Site location and description
2. The site is presently occupied by a single storey brick chapel, used by the East Dulwich Tabernacle church, built around 1950 to replace a previous chapel which had suffered from bomb damage. Set towards the rear of the site, the building is approximately 21m from the Barry Road frontage and is of limited architectural merit. The site is located within a predominantly residential area, including dwellings adjacent to the its northern flank and rear boundaries.
3. The site is subject to the following designations:
• Air Quality Management Area • Suburban Density Zone • Public Transport Accessibility Level (PTAL) 3.
The site is not within a conservation area or within the setting of a listed building or structure.
Details of proposal
4. The application proposes the partial demolition of the front and rear sections of the existing building, followed by the erection of a small single storey extension to the rear of the building and a larger part single / part two storey extension to the front of the existing building. The two storey part (measuring 9m in depth) of the overall front extension (measuring 17m in depth) would front onto Barry Road, approximately in line with the existing adjacent two storey buildings. The extensions will house expanded church facilities including a slightly expanded worship area and class room space, along with improved kitchen, toilet facilities and circulation space.
Planning history
5. A previous application (13/AP/1077) in 2013 for part single/part two storey extensions to the church was withdrawn by the applicant.
Planning history of adjoining sites
103-105 Barry Road (adjacent to the north boundary of the application site)
6. Planning permission (08/AP/0433) granted in 2008 for the demolition of existing timber yard and construction of six three storey residential dwellings (ground and first floors plus roof space); parking and amenity space. This permission has been implemented.
KEY ISSUES FOR CONSIDERATION
Summary of main issues
7. The main issues to be considered in respect of this application are:
a. The acceptability in principle of the proposed extensions b. The impact of the proposed development on the amenity of neighbouring and local residents c. Transport, highway and parking impacts d. The design of the extensions and the impacts on the surrounding townscape
Planning policy
8. The following frameworks, policies and guidance are of particular relevance to the proposals:
National Planning Policy Framework (the Framework) 2012 This application should be considered against the Framework as a whole, however the following sections are particularly relevant:
4 -Promoting sustainable transport 7- Requiring good design 8- Promoting healthy communities 11- Conserving and enhancing the natural environment
London Plan (March 2015) Policy 3.9- Mixed and balanced communities Policy 3.16- Protection and enhancement of social infrastructure Policy 5.13 Sustainable drainage Policy 6.13- Parking Policy 7.6- Architecture Policy 7.15- Reducing noise and enhancing soundscapes
Read every report as text, not just the decision
Pro opens the officer report behind each decision, searchable and quotable, across every council we cover.
Follow Planning Sub-Committee A (decommissioned, for planning committees after at Southwark and we tell you when its next papers are published, before the meeting rather than after it.
We use a cookie to keep you signed in and run your free-paper allowance, and an optional one to count visits. You can accept all, or choose. Privacy & cookies
Necessary
Keeps you signed in and runs your free-paper allowance. Always on.
Always on
Analytics
Counts visits and which pages are used. First-party only, no advertising, never shared.