Committee resolved to: 1. Authorise a tender process to procure market solutions for the solar canopy carpark project; and 2. Note that the Sustainability Team and Assets Team will report the outcome of the tender process to this Committee with detailed proposals
Word for word from the decision Spelthorne published for this meeting.Source: democracy.spelthorne.gov.uk
Report to Corporate Policy and Resources Committee
Schedule of Requirements Solar Carpark 1. The Requirement Spelthorne Borough Council (SBC) are constructing a new leisure centre and will be building a new carpark on the adjoining site. SBC wish to erect a solar canopy/solar carpark/solar carport over the new leisure centre carpark. The generated electricity would either be delivered to the grid or to be utilised in running the leisure centre. The solar carpark should provide a maximum supply of just under 1 megawatt. The lifespan of the project will be a minimum of 30 years, with options to extend the lifespan with replacement solar arrays on top of the canopy structure.
The new leisure centre carpark will be built in the first half of 2025.
The solar canopy provider must be an experienced provider with over 3 large scale solar installations within their portfolio and hold experience in working with public institutions.
We require that the solar canopy provider provide:
The specification for all of the groundworks and foundation design by January 2025 so that the carpark provider can complete those preparations with their work to ensure the car park is fit for the solar canopy installation. The full construction details of the canopy including both the specifications for a glulam timber frame and steel frame options. A comparison between pricing, warranty, maintenance and life expectancy should be included between either frame option.
2. Scope of the Contract The scope of the contract will include any and all planning, design and project implementation works related to the development of a solar carpark on the leisure centre carpark. The dimensions and current specification of the carpark will be detailed below.
Bidders should explore the potential for a demand side response contract with the national grid and the potential for extending energy to alternative buildings in the area.
A specification and pricing breakdown will be required for both a Glulam timber frame option and a steel frame option. The successful bidder is expected to work in conjunction with the already appointed groundworks contractor to ensure the groundworks are meeting the specifications of the solar canopy. The provider should be able to work with our groundwork's contractor from January 2025.
3. Detailed Requirements 3.1 The solar canopy: The solar canopy is expected to cover 250 spaces on 4 central double rows within the carpark. The canopy must allow sufficient space for coaches to traverse around the outer road of the carpark by way of a fixed route. The supply from the canopies will need to have the capacity to feed either the leisure centre, other surrounding buildings or the grid.
Battery storage located on or near the carpark site should be included to enable handling of peak demands, potentially as a demand side response mechanism for the national grid. The canopies must have sufficient lighting, and CCTV as an option.
The canopies will cover the 4 double row areas that can be seen below highlighted in red: Suppliers can utilise the drawings provided as part of the initial planning application of the leisure centre to support their bids, found in appendix A
The panels should not have a high level of glint and glare, this will be a key part of a planning process due to proximity to Heathrow airport.
Bidders are required to provide estimated carbon dioxide savings for the lifespan of the product, in addition to estimated embodied carbon emissions associated with both a glulam timber frame option and a steel frame option.
3.2The solar canopy foundation specification: Bidders will provide their solar canopy foundation specification, detailing the construction design for supporting the solar canopy.
This construction design will consider:
Read every report as text, not just the decision
Pro opens the officer report behind each decision, searchable and quotable, across every council we cover.
Follow Corporate Policy and Resources Committee at Spelthorne and we tell you when its next papers are published, before the meeting rather than after it.
Proposed ICT Server ProcurementThe Committee resolved to: 1. Authorise the Council’s ICT Manager to commence a procurement process for the purchase ...
We use a cookie to keep you signed in and run your free-paper allowance, and an optional one to count visits. You can accept all, or choose. Privacy & cookies
Necessary
Keeps you signed in and runs your free-paper allowance. Always on.
Always on
Analytics
Counts visits and which pages are used. First-party only, no advertising, never shared.