CouncilMonitor
194 principal councils 228,996 meetings since 2000 2.8 million official papers archived Straight from each council's own publication system
Stratford-on-Avon District Council
The Cabinet, Monday 27 November 2017

Canal Quarter Supplementary Planning Document - Noise Analysis Technical Work

Decided Executive 2 papers

The Cabinet decided this item on Monday 27 November 2017. Below is the council's own wording, with the papers it was decided on.

Item536

Resolved

That the Canal Quarter Noise Assessment be received as part of the evidence base to inform the preparation of the Canal Quarter Regeneration Zone Supplementary Planning Document. Note: This item is subject to call-in to the OSC.
Word for word from the decision Stratford-on-Avon published for this meeting. Source: democracy.stratford.gov.uk

Follow this further

Built from Stratford-on-Avon's papers

What the report saysPro

Report to The Cabinet, 40 pages

CANAL QUARTER REGENERATION PROJECT, STRATFORD-UPON-AVON

NOISE ASSESSMENT

On behalf of: Stratford-on-Avon District Council Report No P17-095-R01v3 September 2017

CANAL QUARTER REGENERATION PROJECT, STRATFORD-UPON-AVON

NOISE ASSESSMENT

Report prepared by: Hepworth Acoustics Ltd Hamilton House Mabledon Place London WC1H 9BB

On behalf of: Stratford-on-Avon District Council

Report prepared by: Thomas Bailess MEng MIOA – Principal Consultant

Report checked by: Graham Bowland BSc MIOA – Technical Director CONTENTS

1.0INTRODUCTION 1

2.0SITE DESCRIPTION AND PROPOSALS 2

3.0ACOUSTIC DESIGN CRITERIA 3

4.0NOISE SURVEY 7

5.0NOISE MAPPING 12

6.0ASSESSMENT 13

7.0SUMMARY AND CONCLUSION 17

FIGURE 1 – SITE MAP 18

FIGURE 2 – PREDICTED LAEQ,16HR NOISE CONTOURS, DAYTIME, NO PENALTY FACTORS 19

FIGURE 3 – PREDICTED LAEQ,8HR NOISE CONTOURS, NIGHT, NO PENALTY FACTORS 20

FIGURE 4 – PREDICTED LAEQ,16HR NOISE CONTOURS, DAY, WITH PENALTY FACTORS 21

FIGURE 5 – PREDICTED LAEQ,8HR NOISE CONTOURS, NIGHT, WITH PENALTY FACTORS 22

APPENDIX I: NOISE UNITS & INDICES 23

APPENDIX II: NOISE SURVEY RESULTS 25 Stratford on Avon District Council Canal Quarter Regeneration Project

1.0INTRODUCTION

1.1Hepworth Acoustics Ltd was commissioned by Stratford on Avon District Council to carry out a noise assessment of the Canal Quarter. The proposed site is shown in Figure 1.

1.2The assessment has been commissioned in connection with the proposal to regenerate the area, including introduction of a residential neighbourhood

1.3The aims of this report are: i) To assess the existing noise levels across the site. ii) To determine whether those noise levels are conducive to residential development. iii) To make recommendations to mitigate noise impact where deemed necessary.

1.4Following our meeting with the council on 28th April 2017, we understand that preference will be given to mitigation techniques that do not require specialist acoustics products for the residences such as laminated glazing. Consideration must also be given to the noise levels in outdoor amenity areas used by residents.

1.5The various noise units and indices referred to in this report are described in Appendix I. All noise levels mentioned in the text have been rounded to the nearest decibel, as fractions of decibels are imperceptible.

Email: [email removed] Report No: P17-095-R01v3 Tel: 0207 554 8712 Page 1 of 37 Stratford on Avon District Council Canal Quarter Regeneration Project

2.0SITE DESCRIPTION AND PROPOSALS

Site Description

2.1The site is bounded by Masons Road to the south, with Stratford Upon Avon fire station bordering the site on the southern tip. The boundary then follows Masons Road and crosses the canal at Timothy’s Bridge Road, where it continues up to the office block at 20 Timothy’s Bridge Road, before turning north to the railway line. The north and east of the site is bounded by the railway line, along with Morrison’s supermarket in the south-east corner. The canal runs through the central part of the site. To the south of the site is a residential housing estate. To the west are further commercial and industrial premises. To the north are residences, and the Avenue Farm Industrial Estate with light industry and commercial units. A site plan is shown in Figure 1.

2.2Currently the area is for industrial and commercial uses with a range of manufacturing, storage, and distribution companies.

2.3We understand that the aspiration is that most, if not all, of the existing companies can be relocated in order to make way for residential development. This is with the exception of the Tappex and Pressavon site, which, it is to be assumed for these purposes, will remain.

Proposals

2.4We understand that approximately 600 dwellings could be provided on the part of the Canal Quarter covered by this assessment. This will be complemented with appropriate retail, office, and commercial spaces. There was also be private outdoor amenity areas and public spaces for the benefit of the residents.

Read every report as text, not just the decision

Pro opens the officer report behind each decision, searchable and quotable, across every council we cover.

Papers for this item

Kept in our archive, download once signed in
PDF
Canal Quarter Regeneration Project, Stratford-upon-AvonReport 40 pages DownloadRead as text
PDF
Canal Quarter Supplementary Planning Document: Noise Analysis Technical WorkSupplementary 3 pages Download

At this meeting

Whole meeting

On this subject at Stratford-on-Avon

Search all
  1. Canal Quarter Supplementary Planning Document - Noise Analysis Technical WorkThis decision
  2. Canal Quarter District Heat Network: Outline Business Case and Next StepsDecided
  3. Canal Quarter Regeneration Zone - District Energy Feasibility Study (December 2018)Decided
  4. Canal Quarter Regeneration Zone Framework Masterplan Supplementary Planning DocumentApproved
  5. Canal Quarter Urban Design AnalysisDecided
  6. Stratford-on-Avon Strategic Transport Assessment - Stratford Canal Quarter Regeneration Zone Scenario AnalysisDecided

More from Stratford-on-Avon The Cabinet

All decisions
MeetingDecisionOutcome
2 Nov 2026 Future of Southam United Football Club(1) That subject to the conditions identified in paragraph 1.4.3 of the agenda report, and subject to the above amend... Decided Open
2 Nov 2026 Strategic Risk RegisterThat the , attached as Appendix 1 to the agenda report, be endorsed. Note: In accordance with the Council’s Constitut... Decided Open
2 Nov 2026 Options for Boosting the Supply of Housing Land Update Report(1) That the progress in delivering the Housing Land Supply Action Plan, the September 2026 housing land supply calcu... Noted Open
2 Nov 2026 Youth Catalyst Project – Service Specification and Permission to Tender(1) That permission to procure a Youth Catalyst Project provision to meet the requirements of the specification, as d... Approved Open
2 Nov 2026 Revenue Budget Monitoring Period 1 - 6 2026/27(1) That the actual net variance as at Period 6, and the estimated revenue outturn for 2026/27, be received; and (2) ... Noted Open

We use a cookie to keep you signed in and run your free-paper allowance, and an optional one to count visits. You can accept all, or choose. Privacy & cookies