CouncilMonitor
194 principal councils 228,996 meetings since 2000 2.8 million official papers archived Straight from each council's own publication system
London Borough of Sutton
Health and Well Being Scrutiny Committee, Thursday 31 March 2011 at 7.00pm

Safe Water Services

Noted Scrutiny 1 paper

Health and Well Being Scrutiny Committee noted this item on Thursday 31 March 2011. Below is the council's own wording, with the papers it was decided on.

Item308

Resolved

(i)To note that the committee were satisfied with the way in which maintenance for the water supply at Sutton’s hospitals was being done. (ii) To thank Trevor Fitzgerald and Anthony Tiernan for their input and attendance.
Word for word from the decision Sutton published for this meeting. Source: moderngov.sutton.gov.uk

Follow this further

Built from Sutton's papers

What the report saysPro

Report to Health and Well Being Scrutiny Committee

Page 17 Agenda Item 5

FOLLOW UP REPORT ON THE CONTROL MEASURES AND MONITORING ARRANGEMENTS IN RELATION TO THE PROVISION OF SAFE WATER SERVICES AND LEGIONELLA CONTROL.

FEBRUARY 2011

Revision: 1 OSC REPORT/WATER SERVICES. Page 1 of 6 _________________________________________________________________________________________________ © Epsom and St. Helier University Hospitals NHS Trust Agenda Item 5 Page 18

Purpose of this Paper

1. The Merton, Sutton and Surrey Joint Health and Wellbeing Scrutiny Committee have asked for an update on how water systems are being monitored and Legionella prevented at Epsom and St Helier Hospitals. The purpose of this paper is to inform the committee of the management systems in place and how these meet all statutory obligations.

Controlling the risk of Legionellosis

2. A number of factors are required to create a risk of legionellosis:

• The presence of Legionella bacteria • Conditions suitable for the proliferation of those bacteria • A means of creating and disseminating an aerosol • The presence of individuals who may be exposed

3. The conditions favouring the proliferation of Legionella are:

• Moisture • Temperature between 20oC and 50oC • Availability of nutrients, for example from sediment, sludge, organic material, scale, rust, compatible organisms and materials used in construction of water systems • Presence of biofilm (bacterial slime) on surfaces in contact with water

4. The elimination of as many of these conditions as possible forms the basis for control of the risk. Treatment regimes to eradicate or reduce the proliferation of Legionella (based on physical or chemical disinfection of water systems) also help to control the risk but do not prevent it.

5. The prevention of risk requires the elimination of the possibility of exposure to water spray or aerosol.

Summary of Legislation

6. There are many regulations relating to the provision of safe water. The principle regulations are as follows:

• Health and Safety at Work Act 1974 • Management of Health and Safety at Work Regulations 1999 • Control of Substances Hazardous to Health Regulations 1999 • Water Supply (Water Fittings) Regulations 1999.

Revision: 1 OSC REPORT/WATER SERVICES. Page 2 of 6 _________________________________________________________________________________________________ © Epsom and St. Helier University Hospitals NHS Trust Page 19 Agenda Item 5

7. In addition the following guidance/standards apply to water services within an Acute Hospital:

• Approved Code of Practice – Legionnaires’ disease: the control of Legionella bacteria in water systems (L8) 2000; Third edition. • Health Technical Memorandum 04-01, The control of Legionella, hygiene, “safe” hot water, cold water and drinking water.

Management Systems

8. The Trust has a policy in place (The provision of safe water and control of Legionella) which provides a clear management structure for the management of water services throughout the Trust.

9. The policy clearly identifies the Duty Holder (Chief Executive) and the Responsible Person (Head of Estate Management). It further defines other roles and responsibilities and details the responsibility for monitoring of the policy is by the Control of Infection Committee.

10. The Trust has clear lines of reporting and escalation procedures for any safety related issues. The escalation lines include reporting to the Control of Infection Committee, Health and Safety Committee and Risk Management Committee who can further escalate issues to the Trust Executive Committee or the Trust Board.

Control Measures

Risk Assessments

11. Risk Assessments have been undertaken for all Trust buildings in relation to Safe Water Services and the Control of Legionella by an independent specialist consultant with considerable expertise and experience in this area.

Read every report as text, not just the decision

Pro opens the officer report behind each decision, searchable and quotable, across every council we cover.

Papers for this item

Kept in our archive, download once signed in
PDF
Safe Water Services Report (Amended) for OSC Feb 11Report 81 KB DownloadRead as text

At this meeting

Whole meeting

Who was there

13 of 16 attended
JP
Councillor Jonathan PritchardCommittee Member, present
SE
Samantha EdwardsNon-elected, non-voting, present
TG
Ted GatesNon-elected, non-voting, present
MH
Marion HarperNon-elected, non-voting, apologies
CJ
Carol JacquesNon-elected, non-voting, present
MP
Mavis PeartNon-elected, non-voting, apologies, sent representative
MW
Councillor Myfanwy WallaceChair, present
LH
Councillor Lester HollowayVice-Chair, absent
HH
Councillor Heather HonourCommittee Member, present
RC
Councillor Richard CliftonCommittee Member, apologies
MB
Councillor Mary BurstowCommittee Member, present
SG
Councillor Stuart Gordon-BullockCommittee Member, present

All 16 on the meeting page

On this subject at Sutton

Search all
  1. Safe Water ServicesThis decision
  2. Safe Water ServicesDecided

More from Sutton Health and Well Being Scrutiny Committee

All decisions
MeetingDecisionOutcome
15 Sep 2011 Minutes of the previous meetingIt was agreed that this would be done. Agreed Open
31 Mar 2011 Joint working with sutton linksTo thank Seren Razak and Ted Gates for their presentation. Decided Open
31 Mar 2011 committee workplan and executive forward planResolved : (i) That an informal meeting be set up, with members of this committee and Sutton LINks, to discuss work t... Decided Open
31 Mar 2011 mental health care at Sutton Hospital consultationTo thank Mark Clenaghan, Sarah Ives, [name removed] and [name removed] for their attendance and input. Decided Open
31 Mar 2011 transforming social care( i ) To thank Andrew Clark for his attendance, input and acceptance to provide member development. (ii) To include a... Decided Open

We use a cookie to keep you signed in and run your free-paper allowance, and an optional one to count visits. You can accept all, or choose. Privacy & cookies