Resolved
( i ) To thank [name removed] for his attendance and input. (ii) To request that [name removed] review the L8 guideline practice of inspecting shower hoses half-yearly as members were of the opinion that L8 refers to quarterly inspections.
Merton, Sutton and Surrey Joint Health Scrutiny Committee decided this item on Thursday 24 February 2011. Below is the council's own wording, with the papers it was decided on.
Resolved
( i ) To thank [name removed] for his attendance and input. (ii) To request that [name removed] review the L8 guideline practice of inspecting shower hoses half-yearly as members were of the opinion that L8 refers to quarterly inspections.
Page 55 Agenda Item 8
FOLLOW UP REPORT ON THE CONTROL MEASURES AND MONITORING ARRANGEMENTS IN RELATION TO THE PROVISION OF SAFE WATER SERVICES AND LEGIONELLA CONTROL.
FEBRUARY 2011
Revision: 1 OSC REPORT/WATER SERVICES. Page 1 of 6 _________________________________________________________________________________________________ © Epsom and St. Helier University Hospitals NHS Trust Agenda Item 8 Page 56
Purpose of this Paper
1. The Merton, Sutton and Surrey Joint Health and Wellbeing Scrutiny Committee have asked for an update on how water systems are being monitored and Legionella prevented at Epsom and St Helier Hospitals. The purpose of this paper is to inform the committee of the management systems in place and how these meet all statutory obligations.
Controlling the risk of Legionellosis
2. A number of factors are required to create a risk of legionellosis:
• The presence of Legionella bacteria • Conditions suitable for the proliferation of those bacteria • A means of creating and disseminating an aerosol • The presence of individuals who may be exposed
3. The conditions favouring the proliferation of Legionella are:
• Moisture • Temperature between 20oC and 50oC • Availability of nutrients, for example from sediment, sludge, organic material, scale, rust, compatible organisms and materials used in construction of water systems • Presence of biofilm (bacterial slime) on surfaces in contact with water
4. The elimination of as many of these conditions as possible forms the basis for control of the risk. Treatment regimes to eradicate or reduce the proliferation of Legionella (based on physical or chemical disinfection of water systems) also help to control the risk but do not prevent it.
5. The prevention of risk requires the elimination of the possibility of exposure to water spray or aerosol.
Summary of Legislation
6. There are many regulations relating to the provision of safe water. The principle regulations are as follows:
• Health and Safety at Work Act 1974 • Management of Health and Safety at Work Regulations 1999 • Control of Substances Hazardous to Health Regulations 1999 • Water Supply (Water Fittings) Regulations 1999.
Revision: 1 OSC REPORT/WATER SERVICES. Page 2 of 6 _________________________________________________________________________________________________ © Epsom and St. Helier University Hospitals NHS Trust Page 57 Agenda Item 8
7. In addition the following guidance/standards apply to water services within an Acute Hospital:
• Approved Code of Practice – Legionnaires’ disease: the control of Legionella bacteria in water systems (L8) 2000; Third edition. • Health Technical Memorandum 04-01, The control of Legionella, hygiene, “safe” hot water, cold water and drinking water.
Management Systems
8. The Trust has a policy in place (The provision of safe water and control of Legionella) which provides a clear management structure for the management of water services throughout the Trust.
9. The policy clearly identifies the Duty Holder (Chief Executive) and the Responsible Person (Head of Estate Management). It further defines other roles and responsibilities and details the responsibility for monitoring of the policy is by the Control of Infection Committee.
10. The Trust has clear lines of reporting and escalation procedures for any safety related issues. The escalation lines include reporting to the Control of Infection Committee, Health and Safety Committee and Risk Management Committee who can further escalate issues to the Trust Executive Committee or the Trust Board.
Control Measures
Risk Assessments
11. Risk Assessments have been undertaken for all Trust buildings in relation to Safe Water Services and the Control of Legionella by an independent specialist consultant with considerable expertise and experience in this area.
Pro opens the officer report behind each decision, searchable and quotable, across every council we cover.
PDF |
safe water Feb 11Report | 81 KB | DownloadRead as text |
Follow Merton, Sutton and Surrey Joint Health Scrutiny Committee at Sutton and we tell you when its next papers are published, before the meeting rather than after it.
| Meeting | Decision | Outcome | |
|---|---|---|---|
| 21 Sep 2011 | Declarations of interestTo note that: · Councillor Chris Frost declared a personal interest as his wife was an employee of NHS Sutton and Mer... | Noted | Open |
| 24 Feb 2011 | declarations of interestTo note that the following declarations of interest were made: · Councillor Chris Frost declared a personal interest ... | Noted | Open |
| 24 Feb 2011 | Ambulance Fire at St Helier( i ) To thank Paul Woodrow and Phil Arkle for their attendance and input. (ii) To commend the ambulance staff for ge... | Noted | Open |
| 24 Feb 2011 | Audit Commission Annual Health check for Epsom and St Helier NHS Trust( i ) To welcome [name removed] to his new role and thank him for his attendance. (ii) To congratulate the ESH Trust ... | Decided | Open |
| 24 Feb 2011 | BHCH updateResolved : ( i ) to thank [name removed] for his attendance and input. (ii) To note the report. (iii) To request that... | Noted | Open |
We use a cookie to keep you signed in and run your free-paper allowance, and an optional one to count visits. You can accept all, or choose. Privacy & cookies
Keeps you signed in and runs your free-paper allowance. Always on.
Counts visits and which pages are used. First-party only, no advertising, never shared.