Resolved
(1) That the report be noted.
Swale Joint Transportation Board noted this item on Monday 10 September 2018. Below is the council's own wording, with the papers it was decided on.
Resolved
(1) That the report be noted.
Highway Flooding on the 29th May 2018 To: Swale Joint Transportation Board Main Portfolio Area: Growth, Environment & Transport By: Kathryn Moreton – Asset Manager [Drainages, Strucutres & Safety Barriers] Classification: For Information Ward: All Division: All Summary: Provides details of the flooding that occurred on the 29th May 2018, works carried out to date and planned drainage maintenance and improvements
1. Introduction
1.1The County Council maintain around 250,000 drains across the adopted highway network. Of these, 70,000 drains are located on main roads1 and are therefore subject to annual maintenance visits. The 180,000 located on minor roads are cleaned on a targeted basis in response to reports of blockages or flooding. The volume of assets that are maintained increases year on year with approximately 60km of highway adopted or added for other reasons per annum.
1.2As the Highway Authority, the County Council has a statutory obligation to, so far as is reasonably practicable, maintain the highway and associated drainage systems in a safe condition. By virtue of this, there is a duty to maintain existing highway drainage systems and take steps to maintain highway safety when flooding occurs. There is no obligation to install new highway drainage however the County Council may be found liable for causing a nuisance if reasonable steps to manage highway surface water are not taken.
1.3In an average year the County Council would expect to receive around 7,000 drainage and flooding enquiries. Each enquiry is evaluated to determine the type of response required e.g. drainage cleansing, drainage improvements, an emergency response. An assessment is then made of the risk to highway safety and the risk of internal property flooding and where the risk is moderate to high, the prescribed action is taken.
1.4The regime outlined above is intended to ensure that finite resource is targeted where the need is greatest both from an asset management and a customer perspective. Nevertheless, maintenance has its limitations; whilst it ensures that the available capacity is maximised, it does not enhance capacity to the extent that the drainage system will accommodate the kind of prolonged or intense downpours seen on the 29th May.
2. Report
2.1Over the course of the 29th May 2018, parts of Kent experienced a month’s rainfall in a matter of hours. Swale experienced some of the biggest impacts with over 90mm falling in places. The volume and intensity of rainfall far exceeded the capacity of both the highway drainage system and surrounding land drainage ditches. Large volumes of water poured off the land, exacerbating the situation on the road network and flooding occurred at numerous locations normally unaffected by heavy rain.
1 Main roads are defined as all major strategic, other strategic and locally important routes. 2.2. The County Council received over 500 drainage enquiries including many reports of property flooding and impassable roads. Of these enquiries, 79 routine enquiries and 56 emergency enquiries related to locations in the district of Swale.
2.3Highway drainage cleansing and emergency responses to flooding are ordinarily prioritised based on the risk to highway safety and the risk of internal property flooding. Where appropriate, minor roads are closed, or warning signs are displayed to enable the deployment of tankers and cleansing vehicles to main road and homes affected by flooding.
2.4Unfortunately, on the 29th May the number and severity of flooding reports meant that, despite having additional resources in place, further prioritisation was required. It became necessary to focus the available resources on the main road network and on impassable roads where the risk to safety could not be mitigated by a road closure. This is not a decision that was taken lightly and one that was only actioned once all other options had been exhausted.
Pro opens the officer report behind each decision, searchable and quotable, across every council we cover.
PDF |
Highway FloodingReport | 68 KB | DownloadRead as text |
Follow Swale Joint Transportation Board at Swale and we tell you when its next papers are published, before the meeting rather than after it.
| Meeting | Decision | Outcome | |
|---|---|---|---|
| 29 Jun 2026 | Presentation from Network Rail(1) That it be recommended to the relevant parties at Swale Borough Council and Kent County Council that a joint work... | Decided | Open |
| 29 Jun 2026 | Update on the Local Electric Vehicle Infrastructure (LEVI) Project and other Electric Vehicle (EV) charging infrastructure(1) That the report be noted. | Noted | Open |
| 6 Oct 2025 | Highways Work Programme(1) That the report be noted. | Noted | Open |
| 6 Oct 2025 | Progress Update Report - including updates on Grovehurt Road junction Sittingbourne and Key Street junction Sittingbourne(1) That the update report and verbal updates be noted. | Noted | Open |
| 30 Jun 2025 | Update Report - Proposed Double Yellow Lines, Park Road, Faversham(1) That the report be noted. | Noted | Open |
We use a cookie to keep you signed in and run your free-paper allowance, and an optional one to count visits. You can accept all, or choose. Privacy & cookies
Keeps you signed in and runs your free-paper allowance. Always on.
Counts visits and which pages are used. First-party only, no advertising, never shared.