Resolved
(1) That the report be noted.
Swale Joint Transportation Board noted this item on Monday 7 December 2020. Below is the council's own wording, with the papers it was decided on.
Resolved
(1) That the report be noted.
SBC - Swale Borough Council Updated November 2020 KCC - Kent County Council Highway Services SWALE JOINT TRANSPORTATION BOARD (JTB)
Updates are in italics Reported to this meeting
Minute SBC/ KCC/SBC - No Subject Recommendations Made by Board KCC Comments/date due back to JTB
235/09/13 A2 / A251 Junction, KCC (1) That both proposed traffic improvements Dec 2020 update: Faversham (Annex 1 and 2 in the report), the inclusion of The consultation has been completed with the main consideration of the junction of The Mall and feedback highlighting the proposals need to include the A2, plus the option of ‘no change’, be pedestrian and cycle facilities. 2 meetings have taken approved for the purposes of a wider public place between KCC officers and Faversham Town consultation and the results of the Councillors and KCC Member to discuss further consultation brought back to the JTB at a improvements and at present the designs are being later date. addressed to see if the south of A2 can accommodate a footway and a cycle facility. There is not enough available space to provide a cycle facility along A251 to the jct with A2. Push button pedestrian crossing facilities can be provided on A251 and on A2. On completion of the design, the plans will be presented to the local Councillors and KCC Member and results of the consultation will be published.
The intention, if designs and land can be complete and approved in time, is for a July 2021 start on site with hopefully earlier vegetation removal and Utility plant diversions.
Subsequent related KCC (1) That Option B (roundabout) be progressed Minute No. 72/06/14 as the preferred option for the A2/A251 A2/A251 Junction, junction, Faversham. Faversham Highway Improvement Minute SBC/ KCC/SBC - No Subject Recommendations Made by Board KCC Comments/date due back to JTB
Scheme 218/09/14 Lower Road Junction KCC (1) That the preferred option for the Lower Lower Rd Improvements Phase 1 – the Barton Hill with Barton Hill Drive, Road junction with the Barton Hill Drive Drive roundabout - completed and fully opened to Isle of Sheppey junction be a small roundabout, rather than a traffic Jan 2019. mini-roundabout. Lower Road Improvements Phase 2 - Cowstead corner Roundabout and new footway cycleway, completed and fully opened to traffic January 2020. 1079/12/16 Update on the 20’s Third- (1) That the JTB supports the The trial for a town wide 20mph commenced in 6 Plenty for Faversham party recommendations put forward by the Working September 2020 using an experimental traffic Working Group sche Group, and officers submit a report to the regulation order which allows the installation followed me next JTB meeting on the feasibility of the by the consultation. The consultation will close on 3 proposals. March after which a report will collate all the feedback (2) That the officers’ report considers how and will also include speed surveys, attitudinal and proposals might be rolled-out across the observational surveys as well as pedestrian and cycle Borough. counts pre and post installation. 410/03/19 Highsted Road, KCC (1) That Option 1 be the preferred way Ryan Shiel sent letter to both schools via post, and a Sittingbourne forward, and that KCC look at other options copy of the letter was also emailed to the school proposed footway – as well. generic mailbox. No response has been received so report on the results far. A copy of the letter has been forwarded to the from the public JTB officer and Highway Operations Manager to consultation exercise share as required.
Pro opens the officer report behind each decision, searchable and quotable, across every council we cover.
PDF |
Progress Update ReportReport | 118 KB | DownloadRead as text |
Follow Swale Joint Transportation Board at Swale and we tell you when its next papers are published, before the meeting rather than after it.
| Meeting | Decision | Outcome | |
|---|---|---|---|
| 29 Jun 2026 | Presentation from Network Rail(1) That it be recommended to the relevant parties at Swale Borough Council and Kent County Council that a joint work... | Decided | Open |
| 29 Jun 2026 | Update on the Local Electric Vehicle Infrastructure (LEVI) Project and other Electric Vehicle (EV) charging infrastructure(1) That the report be noted. | Noted | Open |
| 6 Oct 2025 | Highways Work Programme(1) That the report be noted. | Noted | Open |
| 6 Oct 2025 | Progress Update Report - including updates on Grovehurt Road junction Sittingbourne and Key Street junction Sittingbourne(1) That the update report and verbal updates be noted. | Noted | Open |
| 30 Jun 2025 | Update Report - Proposed Double Yellow Lines, Park Road, Faversham(1) That the report be noted. | Noted | Open |
We use a cookie to keep you signed in and run your free-paper allowance, and an optional one to count visits. You can accept all, or choose. Privacy & cookies
Keeps you signed in and runs your free-paper allowance. Always on.
Counts visits and which pages are used. First-party only, no advertising, never shared.