CouncilMonitor
194 principal councils 228,996 meetings since 2000 2.8 million official papers archived Straight from each council's own publication system
Swindon Borough Council
Planning Committee, Tuesday 12 December 2006

Swindon Sustainable Design and Construction Supplementary Planning Document (SPD)

Approved Planning 4 papers

Planning Committee approved this item on Tuesday 12 December 2006. Below is the council's own wording, with the papers it was decided on.

Item199

Resolved

Resolved – (1) That the Director of Planning be authorised to make the Draft Sustainable Design and Construction SPD available for public consultation for a period of six weeks as soon as is practicable. (2) That the results of the public consultation are reported back to Planning Committee and that the final SPD is then commended for adoption. (3) That the Director of Planning be authorised to make minor drafting or typographical changes to the content of the document if required; and that the Director of Planning be authorised to carry out the steps detailed in paragraphs 2.16 to 2.18 of the report.
Word for word from the decision Swindon published for this meeting. Source: ww5.swindon.gov.uk

Follow this further

Built from Swindon's papers

What the report saysPro

Report to Planning Committee, 5 pages

Recommendation

That the Planning Committee agrees that: • the Director of Planning be authorised to make the Draft Sustainable Design and Construction SPD available for public consultation for a period of six weeks as soon as is practicable; • the results of the public consultation are reported back to Planning Committee and that the final SPD is then commended for adoption; • the Director of Planning be authorised to make minor drafting or typographical changes to the content of the document if required; and • that the Director of Planning be authorised to carry out the steps detailed in paragraphs 2.16 to 2.18.

1. Reasons 1.1 The overarching objective of the Swindon Sustainable Design and Construction SPD (appendix 1 to this report) is to assist in addressing sustainable building principles from the earliest concept stage to detailed design, construction and operation. 1.2 New development which is designed to minimise water and energy use (and secure sustainable sources of water and energy), utilise sustainable materials and make efforts to reduce wastage can reduce environmental pollution and help preserve natural resources. Development designed in this way can also benefit homeowners and businesses by reducing bills. Sustainable design therefore not only makes sense in environmental terms, but also stacks up financially. 1.3 The purpose of the guide is to amplify Swindon Borough Local Plan policy DS6 (Standards of Design and Amenity) and the Swindon Design Guide

Further information on the subject of this report can be obtained from Stephen Cains on (01793) 466405 or Email [email protected]. Swindon Sustainable Design and Construction Supplementary Planning Document (SPD) Planning Committee Date: 12th December 2006

Read every report as text, not just the decision

Pro opens the officer report behind each decision, searchable and quotable, across every council we cover.

Papers for this item

Kept in our archive, download once signed in
PDF
Front CoverAppendix 1 1 pages Download
PDF
Sust Des SPDAppendix 1 64 pages Download
PDF
Sustainability AppraisalAppendix 2 69 pages Download
PDF
Swindon Sustainable Design and Construction Supplementary Planning Document (SPD)Supplementary 5 pages DownloadRead as text

At this meeting

Whole meeting

Who was there

11 of 15 attended
AB
Councillor Andrew BennettChair, present
CV
Councillor Chris Van RoonVice-Chair, present
JB
Councillor John BallmanMember, present
SD
Councillor Sinead DarkerMember, present
DD
Councillor Doreen DartMember, present
ME
Councillor Mark EdwardsMember, apologies
MF
Councillor Maurice FanningMember, present
DG
Councillor David GlaholmMember, apologies
PG
Councillor Peter GreenhalghMember, present
DH
Councillor Dale HeenanMember, present
BM
Councillor Brian MattockMember, present
JS
Councillor John Short (ex-Cllr)Member, apologies

All 15 on the meeting page

On this subject at Swindon

Search all
  1. Swindon Sustainable Design and Construction Supplementary Planning Document (SPD)This decision
  2. Securing a sustainable future for Swindon's Library ServicesNoted
  3. Securing a sustainable future for Swindon's Library ServicesNoted
  4. Swindon Sustainable Energy Delivery PlanNoted
  5. Swindon Sustainable Energy Framework and Photovoltaic Installation OpportunityApproved
  6. Swindon Sustainable Design and Construction Supplementary Planning Document (SPD)Noted

More from Swindon Planning Committee

All decisions
MeetingDecisionOutcome
13 Oct 2026 S/26/0171 - Change of use to vehicle servicing (Class E), MOT Centre, car sales centre, hand car wash and retention of the canopies (Sui Generis). - Cross Street Garage, Thames, Avenue, Haydon Wick (Ward: Haydon Wick)Resolved – That planning permission be granted, subject to the conditions set out in the Case Officer’s report, with ... Decided Open
13 Oct 2026 Public Speaking at Planning CommitteeResolved – To approve the changes to the public speaking protocol as outlined in the report and in the attached docum... Approved Open
14 Jul 2026 MinutesThat the minutes of the meeting held on 14 April 2026 be confirmed and signed as a correct record. Decided Open
14 Jul 2026 S-24-0982 Land at Hodson RoadThat the application be deferred pending further investigations into highway safety issues regarding the access. Deferred Open
14 Jul 2026 S-23-0288 Land at Home FarmThat the Chief Planning Officer be authorised to grant planning permission subject to a Section 106 agreement and con... Agreed Open

We use a cookie to keep you signed in and run your free-paper allowance, and an optional one to count visits. You can accept all, or choose. Privacy & cookies