Resolved – (1) That in the event of planned housing development identified in the draft Local Plan for South Marston taking place, the Cabinet confirms that it will endorse the expansion of the existing school facility to meet the future demand for school places. (2) That the Head of Planning, in consultation with the Head of Commissioning, Economy and Attainment, be authorised to include Option 2 (South Marston Expanded School at existing site, assuming shared-use soft pitches), as referred to in the joint report, within the proposed South Marston Village Supplementary Planning Document to be considered by the Council’s Planning Committee. The reasons for the decision and alternative options are as set out in the report to the meeting. (CM: GP / DH)
Word for word from the decision Swindon published for this meeting.Source: ww5.swindon.gov.uk
South Marston Education Provision Cabinet Date: 20th March 2013
Author: Cabinet Member for Children’s Services Board Director, Commissioning Head of Commissioning – Economy & Attainment Wards: Stratton St Margaret & South Marston Locality Affected: North East Parishes Affected: South Marston
1. Purpose and Reasons 1.1 To set out the strategic context for future housing development in South Marston that will inform the village Supplementary Planning Document (SPD). 1.2 To establish Cabinet’s preferred option to address the need for primary school places that might arise from new houses in South Marston. 2. Recommendations Cabinet is recommended to: 2.1 Agree that in the event of planned housing development identified in the draft Local Plan for South Marston taking place, Cabinet will endorse the expansion of the existing school facility to meet the future demand for school places. 2.2 That the Head of Planning, in consultation with the Head of Commissioning, Economy and Attainment, be authorised to include Option 2 (South Marston Expanded School at existing site, assuming shared-use soft pitches), as referred to in the joint report, within the proposed South Marston village Supplementary Planning Document to be considered by the Council’s Planning Committee. 3. Detail 3.1 South Marston Church of England Primary School was built in 1873 to serve the children of the residents of South Marston. The school is able to admit up to 105 pupils. 3.2 South Marston village is identified within the draft Local Plan to accommodate a proposed development of up to 640 homes in the period to 2026, generating the need to provide an additional one form of entry (a total of 210 pupils) to cater for the increase in children of primary school age. 3.3 The Local Planning Authority is preparing a Supplementary Planning Document (SPD) for South Marston in partnership with South Marston Village Expansion Group (SMVEG). The SPD will be in general conformity with the Local Plan and will provide detailed guidance for sustainable growth of the village. It is expected that the SPD will be considered by the Planning Committee.
Further information on the subject of this report can be obtained from Paddy Bradley, 01793 465744, [email protected]. South Marston Education Provision Cabinet Date: 20th March 2013
3.4The South Marston Village Expansion Group had confirmed that it wishes to see the existing school expanded from 0.5 FE to 1.5 FE, either on its existing site or on a new site within the expanded village, rather than be replaced by or in direct competition with an alternative new school (Academy or Free School) as this could prejudice the long term viability of the existing school. 3.5 As a result, Colliers International was commissioned to provide a viability study examining the options for relocation or expansion of the existing school. An executive summary of the report is attached at Appendix 1. 3.6 The viability study considered ensuring the school meets the standard Department for Education area requirements (Building Bulletin 99) for a 1.5FE (315 pupils) school and all possible funding options including the developer contributions and potential sale of the existing site. However, all options would result in a funding gap between the potential Capital generated and the cost of the expansion. 3.7 The study considered the best value option for the Council was to expand the school on its existing site, using an area of the existing Parish Council recreation ground (that will be compensated for within the new development) and the playing fields remain as a facility within the ownership of the Parish Council, with permitted access for school activities. 3.8 The cost of the all options, taking into account potential developer contributions are as follows:
Option Description Estimate cost to the Council
South Marston Expanded School at Existing 1 Site Assuming Sole use £171,300 Soft Pitches
Read every report as text, not just the decision
Pro opens the officer report behind each decision, searchable and quotable, across every council we cover.
Capital Monitoring – Quarter 1 2026/2027Key Decision Following consideration of the report and its appendices, Cabinet resolved : (1) That the 2026/27 expend...
Consultation and Engagement PolicyKey Decision Following consideration of the report and its appendix, Cabinet resolved that the updated Consultation a...
CSC Ofsted Monitoring Visit UpdateNon-key Decision Following consideration of the report and its appendix, Cabinet resolved : (1) That the progress mad...
We use a cookie to keep you signed in and run your free-paper allowance, and an optional one to count visits. You can accept all, or choose. Privacy & cookies
Necessary
Keeps you signed in and runs your free-paper allowance. Always on.
Always on
Analytics
Counts visits and which pages are used. First-party only, no advertising, never shared.