RESOLVED – that: a) the Internal Audit planned work undertaken between 23 June 2022 to 30 September 2022 and the unplanned work to date be noted; b) the update on the action plan of the Public Sector Internal Audit Standards (PSIAS) external assessment action plan be noted; and c) the update on the effectiveness of the Audit Committee action plan be noted.
Word for word from the decision Telford & Wrekin published for this meeting.Source: democracy.telford.gov.uk
3.1This report provides information on the work of Internal Audit from 23 June 2022 to 30 September 2022 and provides an update on the progress of previous audit reports issued.
3.2The key focus for the team during this period was the completion of audits on the annual audit plan and fulling commercial contracts.
3.3The information included in this progress report will feed into and inform our overall opinion in our Internal Audit Annual Report. All audit reports issued during the year are given an overall audit opinion based on the following criteria:
Level of Assurance/Audit Opinion & Definition
Good (Green) Reasonable (Yellow) There is a sound system of control There is a sound system of control but designed to address relevant risks there is evidence of non-compliance with with controls being consistently some of the controls. applied.
Limited (Amber) Poor (Red) Whilst there is a sound system of The system of control is weak and there is control, there are weaknesses in the evidence of non-compliance with the system that leaves some risks not controls that do exist. addressed and there is evidence of non-compliance with some key controls.
3.4To determine the overall grading of the Internal Audit report each recommendation is risk rated (high, medium or low). The recommendation risk rating is based on the following criteria:
2 High risk = A fundamental weakness which presents material risk to the system objectives and requires immediate attention by management.
Medium risk = A recommendation to address a control weakness where there are some controls in place but there are issues with parts of the control that could have a significant impact.
Low risk = A recommendation aimed at improving the existing control environment or improving efficiency, these are normally best practice recommendations.
3.5The chart below shows the percentage of high (red segment), medium (yellow segment) and low (green segment) risk recommendations made for the reports issued during this period.
3.6The level of assurance (based on table 4.3 above) for audit reports issued in this period is detailed below.
3 3.7 The information in the above pie charts is broken down in the summary table below.
AUDIT REPORTS ISSUED BETWEEN 23/6/22- 30/9/22 AND CURRENT STATUS Date of Level of Report risk on Original Follow Revised Comments Area plan Audit up Due Grade Grade
Read every report as text, not just the decision
Pro opens the officer report behind each decision, searchable and quotable, across every council we cover.
We use a cookie to keep you signed in and run your free-paper allowance, and an optional one to count visits. You can accept all, or choose. Privacy & cookies
Necessary
Keeps you signed in and runs your free-paper allowance. Always on.
Always on
Analytics
Counts visits and which pages are used. First-party only, no advertising, never shared.