AI summaryThanet Joint Transportation Board notes Kent highways programme for 2024/25 and 2025/26, asks officers to investigate, and flags Vere Road crossing design work.
Written from the decision and the officer reportPDF Pro
OutcomeAgreedBoard asked officers to look into report
MoneyNot stated
What happens nextVere Road crossing in design stageCrash cluster analysis underway, options considered
Who it affectsThanet road users and residentsHighways maintenance, safety and street works
What was decided
The Board noted the Highways Forward Works Programme report covering 2024/25 and 2025/26 and asked officers to investigate it. Report P24
Members asked that contractors collect warning boards and signs once roadworks are finished, and noted that utility companies leaving signs out beyond permit times face Section 74 charges.
The Board heard that an informal pedestrian crossing on Vere Road, Broadstairs is in the design stage after a crash cluster analysis, with options including a build-out and a refuge island under consideration.
Why
The report updates members on schemes approved for construction in 2024/25 and 2025/26, replacing earlier two-year programmes as Kent County Council moves to multi-year asset management. Report P6, P8, P9, P10
It covers planned road, footway and cycleway renewal, drainage, street lighting, transportation and safety schemes, developer funded works, bridge works, traffic systems, Member Highway Fund schemes, and road markings. Report P14, P15, P16, P17, P18, P19, P20, P21, P22
What happens next
Officers will investigate the report following the Board's request.
A new two-year programme covering 2024/25 to 2025/26 is in place, and work to revise the years three to five programme to cover 2026/27 to 2028/29 is in progress. Report P10, P11
The programme is under regular review and may change due to budget allocation, contract rates, inflation, conflicting works, shifting priorities, and engineering assessment during design. Report P12
Options considered
Rejected: Build-out at Vere Road, Broadstairs. One option being considered alongside others
Rejected: Refuge island at Vere Road, Broadstairs. One option being considered alongside others
Chosen: Section 74 charges on utility companies overrunning permit times. Existing enforcement tool, members urged to report specific locations
Implications
Risk: Programme content may shift as schemes are verified and as budget, inflation or engineering assessments change. Report P11, P12
Legal: Utility companies leaving signs out beyond their permit window can be charged under Section 74.
Other: Members were encouraged to report specific locations where utility signs have been left out beyond permit times.
Who and where
Motorists and road users in Thanet
Utility companies working in Thanet
Residents and pedestrians on Vere Road, Broadstairs
Thanet District Council and Kent County Council highways teams Report P2, P27
Timeline
Summer 2021: Kent County Council published its Highways Asset Management Plan with a five-year Forward Works Programme for 2021/22 to 2025/26. Report P9
October 2022: First two-year programme replaced with a programme covering 2022/23 to 2023/24. Report P10
2024/25 to 2025/26: New two-year programme now covers these years. Report P10
10th September 2026: Report presented to the Thanet Joint Transportation Board. Report P3
Plain English for the jargon
HAMP: Highways Asset Management Plan, Kent County Council's plan for managing road infrastructure over multiple years.
Section 74 charges: Charges that can be levied on utility companies when street works overrun the time allowed under their permit.
Combined Members Grant: Kent County Council funding allocated to county members for local highway improvements, also called the Member Highway Fund.
Casualty Reduction Measures: Road safety interventions designed to reduce collisions, often following analysis of crash clusters.
What was decided, why, and what happens next
Pro reads every officer report for you and explains each decision in plain English: the money, the options, the risks, the timeline, each with the paragraph it came from.
Written by AI from the council's published papers. AI can get things wrong: the council's own wording below is the record.Report a problem
Item4
Resolved
It was agreed that officers would investigate this report. · A request was made to ensure contractors collect warning boards and signs once roadworks were finished to avoid motorist confusion. Utility companies leaving signs out beyond their permit times were subject to Section 74 charges, and councillors were encouraged to report specific locations. · The informal pedestrian crossing at Vere Road, Broadstairs, was in the design stage following a crash cluster analysis, and officers were looking into options such as a build-out and a refuge island. The Board NOTED the report.
Word for word from the decision Thanet published for this meeting.Source: democracy.thanet.gov.uk
Subject: Highways Forward Works Programme: 2024/25 and 2025/26
Classification: Information Only
Summary: This report updates Members on the identified schemes approved for construction
1. Introduction
This report provides an update and summarises schemes that have been programmed for delivery in 2024/25 and 2025/26.
In summer 2021 Kent County Council published a Highways Asset Management Plan (HAMP), which included, as Appendix C, a five-year Forward Works Programme for the years 2021/22 to 2025/26. This reflected the need to move away from annual programmes and to consider asset management activity as a multi-year one.
The first part of the programme concerned the two years 2021/22 - 2022/23. In October 2022 we replaced this with a programme covering the years 2022/23 - 2023/24, and we have now produced a new two-year programme covering the years 2024-25 – 2025-26. As before, most of the sites included in this programme have already been verified by our engineers.
The second part of our programme related to years three to five of our five-year programme (2023/24 - 2025/26). This too is in need of revision to cover the years 2026/27 - 2028-29 and the work required to do this is currently in progress. As before, our new years three to five programme will be largely based on data from our asset management systems, so may be subject to more changes as the schemes are verified.
This programme is subject to regular review and may change for a number of reasons including budget allocation, contract rate changes, inflationary pressures such as material price increases, conflicting works, and to reflect our changing priorities. The programme and extent of individual sites within the programme may also be revised following engineering assessment during the design phase, and additional sites may be added or others advanced if their condition deteriorates rapidly so that we need to react in order to keep the highway in a safe and serviceable condition.
Further information about how we manage our highway infrastructure, including our county- wide five-year forward works programme, may be found on our website: https://www.kent.gov.uk/about-the-council/strategies-and-policies/transport-and-highways- policies/managing-highway-infrastructure
In addition to planned maintenance of our highway assets, this report includes transportation and safety schemes, developer funded works, Combined Members Grant schemes, and planned maintenance of public rights of way. Road, Footway & Cycleway Renewal and Preservation Schemes – see Appendix A
Drainage Repairs & Improvements – see Appendix B
Street Lighting – see Appendix C
Transportation and Safety Schemes – see Appendix D Casualty Reduction Measures Externally Funded Schemes Major Capital Programme
Developer Funded Works – see Appendix E
Bridge Works – see Appendix F
Traffic Systems – see Appendix G
Combined Members Grant – Member Highway Fund – see Appendix H
Road Markings – see Appendix I
Conclusion
1. This report is for Members’ information.
Contact Officers:
The following contact officers can be contacted on 03000 418181
Pauline Harmer Senior Highway Manager East Kent Paul Valek Thanet Highway Manager Alan Casson Strategic Asset Manager Carol Valentine Drainage Asset Manager Helen Rowe Structures Asset Manager Sue Kinsella Street Light Asset Manager Toby Butler Traffic Operations and Technology Manager Jamie Hare Development Agreements Manager Nikola Floodgate Road Safety and Active Travel Group Manager [email protected] Major Capital Programme Manager Jonathan Dean Highway Manager Special Projects/HSR/Signs & Lines
Read every report as text, not just the decision
Pro opens the officer report behind each decision, searchable and quotable, across every council we cover.
We use a cookie to keep you signed in and run your free-paper allowance, and an optional one to count visits. You can accept all, or choose. Privacy & cookies
Necessary
Keeps you signed in and runs your free-paper allowance. Always on.
Always on
Analytics
Counts visits and which pages are used. First-party only, no advertising, never shared.