That the report be received and noted.
Cabinet noted this item on Tuesday 31 January 2017. Below is the council's own wording, with the papers it was decided on.
Resolved
That the report be received and noted.
TONBRIDGE & MALLING BOROUGH COUNCIL
CABINET
31 January 2017
Report of the Director of Central Services Part 1- Public
Matters for Information
1 TONBRIDGE POOL ROOF REPAIRS : WAIVER UNDER CONTRACT PROCEDURE RULE 13
1.1Introduction
1.1.1 Report advising Members of a waiver under Contract Procedure Rule 13 that, following commencement of roof repairs at Tonbridge Swimming Pool, developed unexpected costs exceeding a £100,000 limit. In these circumstances Contract Procedure Rules require a report on the waiver to the next appropriate meeting of the Executive (Cabinet).
1.2Roof Repairs Undertaken
1.2.1 The works on the roof commenced at the end of September last year and arose from an established scheme to replace, under guarantee, the delaminating clay roof tiles at Tonbridge Swimming Pool. The tile manufacturer (Sandtoft) had undertaken to replace all of the clay roof tiles (with more robust concrete equivalents) on the building at their cost using one of their approved contractors, Strandor Roofing. The repairs for the first (of three annual) phases affected the north-western side of the main pool hall roof.
1.2.2 A survey of the roof in the Spring of 2016 by an expert consultant also identified problems with brittle/split roofing felt, ‘slumping’ rockwool insulation and poor ventilation of the roof in general, exacerbated by the humid atmosphere of the swimming pool environment.
1.2.3 Whist the access scaffold was in place and the roof tiles stripped off, it was always the intention to address these other issues which are not covered by the Sandtoft roof tile guarantee and would need to be financed by the Council. A sum of £60,000 was included in the Buildings Repairs Reserve Expenditure Plan (BRREP) for the purpose. The anticipated cost of these works was subsequently estimated at c £25,000 by Strandor Roofing for the first phase on the north- western section of roof.
1.2.4 Undertaking these additional improvement works using the contractor Strandor Roofing (already commissioned by Sandtoft and due on site to replace the tiles)
Cabinet - Part 1 Public 31 January 2017 2
without putting the pricing to open competition, required a waiver under Contract Procedure Rule 13. This waiver was approved by the Chief Executive, Monitoring Officer and Director of Finance and Transformation. An additional benefit of having these supplementary works done by the approved contractor to the recommended improved specification is that Sandtoft will guarantee the roof repairs for a period of fifteen years as well as the tiles themselves for thirty years.
1.2.5 On commencement of the works (which involved stripping the tiles, felt, battens and insulation) severe rot was found in several areas of the wooden rafters, semi structural decking and main ’Glulam’ beams. The area of the roof affected by the rot was directly below the high level windows. The rot found in the decking was of particular concern as this affected the ability of the roofers to work on the outside of the building whilst the pool remained occupied inside.
1.2.6 Repairs to the decking required the staged removal and replacement of large sheets of decking material. To safely undertake this work at high level, a scaffold was required inside to prevent life threatening falls and to give access for timber repairs to the main Glulam beams. This resulted in the necessary draining of the main pool and closure of this section of the facility for several weeks.
1.2.7 Additional costs in relation to the roof repairs accrued for:
Replacement rafters
Decking replacement (including new improved Vapour Control Layer and using a more robust resin reinforced water resistant decking product)
Board protection inside the pool prior to the scaffolding erection
Internal ‘bird cage’ scaffold to full height of pool hall on the north-western side as part of health and safety protection for roofers replacing the decking at high level.
Pro opens the officer report behind each decision, searchable and quotable, across every council we cover.
PDF |
Tonbridge Pool Roof Repairs: Waiver Under Contracts Procedure Rule 13Report | 66 KB | DownloadRead as text |
Follow Cabinet at Tonbridge and Malling and we tell you when its next papers are published, before the meeting rather than after it.
| Meeting | Decision | Outcome | |
|---|---|---|---|
| 1 Sep 2026 | MinutesThat the of the meeting of the Cabinet held on 30 June 2026 be approved as a correct record and signed by the Chairman. | Approved | Open |
| 1 Sep 2026 | Local Government Reorganisation - Establishment of West Kent Joint CommitteeRESOLVED : That (1) the Secretary of State’s decision to proceed with four unitary councils for Kent and Medway, as s... | Noted | Open |
| 1 Sep 2026 | Budgetary Control 2026/27 to July 2026RESOLVED : That (1) the net favourable variance of circa £66,093 as at the end of July 2026, when compared to the pro... | Noted | Open |
| 1 Sep 2026 | Risk ManagementRESOLVED : That (1) the updates to the Strategic Risk Register since the last iteration, with particular emphasis on ... | Noted | Open |
| 1 Sep 2026 | Artificial Intelligence Governance Framework PolicyRESOLVED : That (1) the , attached at Annex 1, be approved for adoption and implementation; (2) the establishment and... | Approved | Open |
We use a cookie to keep you signed in and run your free-paper allowance, and an optional one to count visits. You can accept all, or choose. Privacy & cookies
Keeps you signed in and runs your free-paper allowance. Always on.
Counts visits and which pages are used. First-party only, no advertising, never shared.