Resolved
That the report be received and noted.
Joint Transportation Board noted this item on Monday 11 June 2018. Below is the council's own wording, with the papers it was decided on.
Resolved
That the report be received and noted.
Following completion of the Local Growth Funded High Street Improvement scheme in June 2016 this report outlines the pre and post scheme monitoring that has been undertaken. The scheme has been evaluated against the original objectives of the project, namely to provide an attractive, safer environment, improve access to jobs and public transport, improve air quality and alleviate congestion.
The economic and transport data is promising. Metrics for both pre and post completion have been assessed and traffic flows are reduced, journey times at peak periods in both directions both down and vacancy rates also down. The data suggests that pedestrian movements have decreased steadily since the year 2000 with no post scheme improvement at present and air quality will be measured after 5 years. Personal Injury accidents will need to be compared over a 3 year period so will not be available until 2019.
A short online survey to investigate how businesses and key community stakeholders responded to the scheme was conducted to get an understanding of local thoughts and feelings. Responses on a sliding positive to negative scale were sought and over 1600 responses were received. Specific responses are set out later in this report. The responses should be considered in the context of no ‘before scheme’ surveys to benchmark the results against. Informal communications prior to the scheme start did suggest that there was some dissatisfaction with the operation and environment of the High Street prior to the scheme commencing.
The most positive responses centred around the attractiveness of the High Street and by far the most unpopular element being the online bus stopping locations followed by the removal of the central controlled crossing point.
A separate report has been produced identifying possible options for further improvements/investigations.
1 1.0 Introduction
1.1Amey were commissioned by Kent County Council (KCC) to carry out post scheme monitoring and evaluation of the Local Enterprise Partnership (LEP) funded Tonbridge High Street regeneration scheme. The scheme predominately consisted of the widening of existing footways and narrowing of the existing carriageway through the lower High Street of Tonbridge, between the Big Bridge to the north and the Vale Road roundabout to the south.
1.2The scheme aimed to provide a more attractive environment for pedestrians by creating more space for pedestrian movement, providing street furniture and opportunities for public events. The speed limit was reduced from 30 mph to 20 mph. The location is shown in 1-1 below.
Figure 1-1 Location of Scheme
1.3Site clearance began in August 2015 and the scheme was fully completed by June 2016. 2 2.0 Purpose of Report
2.1This report provides analysis of the pre-scheme and post scheme metrics and provides an evaluation of the schemes performance against the aims and objectives as outlined in the business case.
3.0Scheme Objectives
Figure 3-1 below summarises the scheme objectives and the desired outcomes and provides the measures against which the scheme will be accessed.
Pre Construction Implementation Post Construction
Short Term Medium/Longer Objectives Inputs Outputs Outcomes Term Outcomes
Increased employment Improve attractiveness Improved streetscape opportunities Increased shopper of town centre and and environment for footfall boost economic activity shoppers and retailers Encourage more Business Case retailers/businesses to locate in area
Alleviate congestion by allowing better flow of traffic Reduced congestion Improvements in Reduced barriers to LEP Funding through High Street journey time reliability flow of traffic through £2.4m High Street Improve air quality Reduced traffic impact on AQMA
Pro opens the officer report behind each decision, searchable and quotable, across every council we cover.
PDF |
Tonbridge High Street: Post Monitoring ReviewReport | 1.8 MB | DownloadRead as text |
Follow Joint Transportation Board at Tonbridge and Malling and we tell you when its next papers are published, before the meeting rather than after it.
| Meeting | Decision | Outcome | |
|---|---|---|---|
| 2 Dec 2024 | Parking UpdateThat the current progress and approach to the Parking Team’s work programme, be noted. | Noted | Open |
| 2 Dec 2024 | Parking Action Plan, Access Group 9That the decision of the Cabinet Member for Transformation and Infrastructure to set aside the objections attached at... | Noted | Open |
| 17 Jun 2024 | Scope of the Joint Transportation Board and local/public transportThat consideration be given to the scope of the Joint Transportation Board at the next meeting. | Decided | Open |
| 21 Nov 2022 | Proposed Single Yellow Line Waiting Restrictions - Oldbury LaneThat the Traffic Regulation Order for double yellow lines be implemented on Old Lane Only, as shown in the plan at Ap... | Decided | Open |
| 6 Jun 2022 | Proposed 40mph Speed Limit - B2016 Seven Mile Lane, MereworthThat the 40mph speed limit on the B2016, Seven Mile Lane, be implemented as shown on the plan at Appendix D to the re... | Decided | Open |
We use a cookie to keep you signed in and run your free-paper allowance, and an optional one to count visits. You can accept all, or choose. Privacy & cookies
Keeps you signed in and runs your free-paper allowance. Always on.
Counts visits and which pages are used. First-party only, no advertising, never shared.