Resolved

That the application be Granted subject to the conditions as set out in the report. Councillor Boughton, Applicant, addressed the Committee.
Word for word from the decision Torridge published for this meeting. Source: democracy.torridge.gov.uk

Follow this further

Built from Torridge's papers

What the report saysPro

Report to Plans Committee

Committee Report

© Application Number: Crown copyright and database 1/1351/2021/FUL rights 2012 Ordnance Survey 100022736

Registration date: 9 December 2021

Expiry date: 3 February 2022

Applicant: [name removed]: AHA Designs

Case Officer: Debbie Fuller

Site Address: Land at Worden Farm Bradworthy Devon

Proposal: Erection of covered slurry store

Recommendation: Grant

© Crown copyright and database rights 2022 Ordnance Survey 100022736 Reason for referral:

[name removed] is a District Councillor for Torridge District Council.

Relevant History:

Application No. Description Status Closed 1/0604/2021/FUL Erection of agricultural PER 02.09.2021 livestock building

Site Description & Proposal

Site Description 'Worden Farm,' is situated in the open countryside to the west of Bradworthy. The site is adjacent a county road. There are other farm holdings in the area, but the area is a sparsely populated area between Bradworthy and Meddon.

According to the planning statement, submitted with the planning application, the farm has 122 hectares of land, of which 51 are owned, with the remainder rented. It is a dairy farm that has 168 cows and averages 180 youngstock per year.

Proposed Development The application seeks full planning permission for the erection of a covered slurry store, with a working capacity of 3,200 tonnes. This will provide approximately 6 months storage and replace an existing slurry tower on the site, which is no longer fit for purpose.

The proposed building is to be sited to the north of the existing farm sheds, and measures 48.7 metres in length, 18 metres in width, and 8 metres overall height, (6 metres to the eaves). Due to the topography of the land, which slopes downwards to the north, the height above ground at the southern end is approximately 5 metres, at the northern end is approximately 8 metres. The floor area is 885 square metres. The proposed building will have a fully enclosed concrete panel construction to a height of 4.4 metres. The proposed materials are steel frame construction with concrete panel and cattle board elevations under a fibre sheet roof.

The surface water runoff will be collected in a crated rainwater soakaway to the north of the building.

The planning statement, states that 'The design and construction of this building has been done in line with environment agency advice.'

Consultee representations:

Bradworthy Parish/Town Council: Bradworthy Parish Council has no objection to the proposed development

Environmental Protection Officer: In relation to the above application, the Environmental Protection Team has no objections.

Natural England: (received 22nd December 2021)

Thank you for the above consultations received by Natural England on 2nd December 2021.

Natural England is a non-departmental public body. Our statutory purpose is to ensure that the natural environment is conserved, enhanced, and managed for the benefit of present and future generations, thereby contributing to sustainable development. Insufficient Information Provided There is insufficient information to enable Natural England to provide a substantive response to this consultation as required under the Town and Country Planning (Development Management Procedure) (England) Order 2015. Please provide the information listed below and re-consult Natural England. Please note that you are required to provide a further 21-day consultation period, once this information is received by Natural England, for us to respond.

Natural England is not able to assess this case as there is insufficient information provided in relation to air quality impacts.

Read every report as text, not just the decision

Pro opens the officer report behind each decision, searchable and quotable, across every council we cover.

Papers for this item

Kept in our archive, download once signed in
PDF
Application No. 1/1351/2021/FULReport 174 KB DownloadRead as text

At this meeting

Whole meeting

Who was there

9 of 24 attended
CL
Councillor Chris LeatherChair, present
MB
Councillor Margaret BrownVice-Chair, apologies, sent representative
RB
Councillor Richard BoughtonCommittee Member, present
RC
Councillor R CraigieCommittee Member, present
RL
Councillor Rosemary LockCommittee Member, present
DM
Councillor Dermot McGeoughCommittee Member, present
PW
Councillor Peter WatsonCommittee Member, present
RW
Councillor Richard WisemanCommittee Member, present
SH
Steve HearseOfficer, expected
SD
Staci DoreyOfficer, in attendance
SK
Sean KearneyOfficer, expected
DH
David HeyesOfficer, expected

All 24 on the meeting page

On this subject at Torridge

Search all
  1. Application No. 1/1351/2021/FULThis decision
  2. Application No. 1/0001/2026/FULMDecided
  3. Application No. 1/0258/2026/FULApproved
  4. Application No. 1/0173/2026/FULApproved
  5. Application No. 1/0857/2025/FULApproved
  6. Application No. 1/0023/2026/FULApproved

More from Torridge Plans Committee

All decisions
MeetingDecisionOutcome
30 Jul 2026 Application No. 1/0001/2026/FULMResolved – That the ... view the full minutes text for item 288. Decided Open
30 Jul 2026 Application No. 1/0386/2026That the application is approved subject to the conditions outlined in the report. A recorded vote was taken. COUNCIL... Approved Open
30 Jul 2026 Application No. 1/0258/2026/FULThat the application be approved, with an informative added for solar, rainwater capture and heat pump provision. A r... Approved Open
30 Jul 2026 Planning DecisionsResolved - That the Planning decisions for the period 23 rd June 2026 – 15 th July 2026 be noted. Noted Open
2 Jul 2026 Planning DecisionsResolved - That the Planning decisions for the period 20/5/2026 – 23/6/2026 be noted. Noted Open

We use a cookie to keep you signed in and run your free-paper allowance, and an optional one to count visits. You can accept all, or choose. Privacy & cookies