That the application be Granted subject to the conditions as set out in the report. [name removed], on behalf of the CPRE Devon, addressed the Committee objecting to the application. [name removed] addressed the Committee objecting to the application. [name removed] addressed the Committee in support of the application. Francis Mann addressed the Committee in support of the application.
Word for word from the decision Torridge published for this meeting.Source: democracy.torridge.gov.uk
This application was called in by Councillor Lock for members to consider:
- Overlooking - Noise - Traffic - Privacy - Environment - Footpaths - Intrusion into the Haddacott County Wildlife Site.
Relevant History:
Application No. Description Status Closed 1/0997/2012/FULM Construction of photovoltaic PER 18.02.2013 (PV) solar array and associated works 1/0279/2019/SCR Installation of a solar SCRP 10.05.2019 photovoltaic (PV) farm with ancillary infrastructure
Site Description & Proposal
Site Description: The application site is located approximately 2.5km southeast of the settlement boundary of Bideford and less than 1km from the village of Alverdiscott to the east. The application site is divided into three parcels of land extending to some 63.2 hectares and is currently predominantly in used for agricultural purposes. The existing site includes hedgerows around the existing agricultural fields with small areas of woodland, particularly in the central section of the site. The external field boundaries are defined by mature trees/hedgerows, vegetation and pockets of woodland.
There are no public highways or public rights of way that extend through the site. Access to the site is by an unnamed road to the west of the Application Site that runs between Gammaton Moor in the south and Webbery Barton in the north.
There is an existing Alverdiscott electricity sub-station central to the parcels of land, with power lines and pylons extending across the site. There is an existing solar farm at Cleave Farm that lies adjacent to the Application Site boundary.
There is an unnamed stream that runs along the northern boundary of the western section of the site, the southern boundary of the central parcel of the site and the southern boundary of the eastern section of the site. The site lies wholly within Flood Zone 1 defined as land with the lowest risk of flooding, having a less than 1 in 1000 annual probability of river flooding.
Proposed Development: This application seeks the installation of a photovoltaic (PV) solar farm (up to 49.9MW) together with ancillary infrastructure and associated works. The proposed development seeks the addition of solar PV cells arranged in lines across the existing fields orientated to the south mounted on a simple metal framework to a maximum height of 3 metres. Rows will be spaces with a minimum of 2.5 metres between panels. In addition, the associated infrastructure would include the following:
Read every report as text, not just the decision
Pro opens the officer report behind each decision, searchable and quotable, across every council we cover.
Application No. 1/0258/2026/FULThat the application be approved, with an informative added for solar, rainwater capture and heat pump provision. A r...
We use a cookie to keep you signed in and run your free-paper allowance, and an optional one to count visits. You can accept all, or choose. Privacy & cookies
Necessary
Keeps you signed in and runs your free-paper allowance. Always on.
Always on
Analytics
Counts visits and which pages are used. First-party only, no advertising, never shared.