It was agreed in the Council offices approximately this time last year, with representation from York and Dudley Roads, local councillors and KCC, that an official experimental road closure would be forthwith installed in York Road, to reduce the chance of it becoming a rat run and to encourage more walking and cycling. Since that time nothing has happened. Apart from Covid which understandably affected all traffic flows around the town. Traffic has now re-ignited and cars are starting to be fined for inadvertently using Mount Pleasant and with this the flow of cars down York Road is increasing. The chat on social media, apart from being generally vitriolic about the confusion caused by the lack of signage and the project is the ... view the full minutes text for item TB7/20
Word for word from the decision Tunbridge Wells published for this meeting.Source: democracy.tunbridgewells.gov.uk
That the presentation from Phil Jones Associates is noted.
1 Introduction
1.1This note provides a short introduction to the current work on the Tunbridge Wells Local Cycling & Walking Infrastructure Plan, in anticipation of a presentation by Ben Coleman and John McQueen of Phil Jones Associates at JTB on 19 October 2020.
Background
2.1Local Cycling and Walking Infrastructure Plans (LCWIPs), as set out in the Government’s Cycling and Walking Investment Strategy (2017), are a new, strategic approach to identifying cycling and walking improvements required at the local level. LCWIPs provide a long-term approach to developing local cycling and walking networks, usually over a 10 year period. Future government funding for cycling and walking will only be allocated to local authorities that have these strategic plans in place.
2.2Tunbridge Wells Borough Council (along with three other Kent authorities) was chosen to be part of a pilot programme of early adopters and received free consultancy support to prepare an LCWIP. Our Phase 1 LCWIP focuses on the urban area of Royal Tunbridge Wells and was submitted to the Department for Transport (DfT) at the end of November 2019 for feedback (as part of this pilot) prior to further consultation locally. Unfortunately, the DfT response has been delayed due to Covid-19.
2.3The Transport Assessment prepared for the emerging Local Plan (at Regulation 18) set out a requirement for a significant modal shift from car to active travel. Such a change is only likely to be delivered if improved walking and cycling infrastructure is provided for shorter journeys. It is recognised that car ownership in Borough is, and will remain, high and people will still use cars for certain journeys, but the aim of the LCWIP is to facilitate and encourage active travel for shorter journeys. In addition, the Transport Assessment set out requirements for improved inter-urban segregated cycle routes. Longer journeys by bike are feasible with suitable infrastructure and assuming a greater up-take of electric bikes in the future.
2.4Phil Jones Associates (PJA) was appointed earlier this year by Tunbridge Wells Borough Council with a brief to cover the following elements:
Review of LCWIP Phase 1 (focused on RTW and the surrounding area); Preparation of an LCWIP (Phase 2) for other urban areas of the borough including Paddock Wood; A feasibility assessment of potential inter-urban cycle routes between Royal Tunbridge Wells – Paddock Wood – Tonbridge – Royal Tunbridge Wells; and Assessment of the potential for creation of Low Traffic Neighbourhoods in urban areas of the borough including Royal Tunbridge Wells, Southborough and Paddock Wood
2.5This work is now approaching completion and a report will be finalised in November 2020.
2.6Ben Coleman and John McQueen of PJA will be presenting the methodology and findings of this work (to date) to JTB on 19 October and there will be an opportunity to ask questions.
3.1That the presentation from PJA is noted.
3.2That consultation on the final LCWIP will be undertaken as part of the Local Plan Regulation 19 consultation programme in Spring 2021.
Appendices to the Report None
Background Papers None
Read every report as text, not just the decision
Pro opens the officer report behind each decision, searchable and quotable, across every council we cover.
We use a cookie to keep you signed in and run your free-paper allowance, and an optional one to count visits. You can accept all, or choose. Privacy & cookies
Necessary
Keeps you signed in and runs your free-paper allowance. Always on.
Always on
Analytics
Counts visits and which pages are used. First-party only, no advertising, never shared.