RESOLVED (a) that the design of the proposed health and fitness development at Tilsley Park be agreed; (b) that officers finalise the project details with South Oxfordshire Leisure Limited and implement the development scheme with a view to possibly opening the facility in the summer of 2006.
Word for word from the decision Vale of White Horse published for this meeting.Source: democratic.whitehorsedc.gov.uk
2.1The design of the proposed health and fitness development at Tilsley Park.
2.2That Officers finalise the project details with SOLL and implement the development scheme with a view to opening the facility in the summer of 2006.
3.0Relationship with the Council’s Vision, Strategies and Policies
(a) This report supports vision strands A, F & G.
(b) This report relates to the Vale’s cultural strategy and the Recreation, Culture and Leisure Theme of the Vale’s Community Strategy.
(c) This report does not contradict any existing policy.
4.0Background and Supporting Information
4.1At its March 2005 meeting the Executive considered a report concerning the development of a health and fitness facility at Tilsley Park. The Executive resolved: a) That the Director of Social and Cultural Services be authorised to proceed with the development of a health and fitness facility at Tilsley Park; b) That the Assistant Director (Finance) be authorised to determine which basis of capital funding should be used to maximise the return to the Council; and c) That if planning consent is not required, the Executive’s approval be sought to the design of the health and fitness development prior to any works taking place on site.
4.2Following this meeting of the Executive Roger Lyons, the architect used to design the original facility, has been engaged to design this extension in keeping with the original planning permission and design criteria. Discussions have taken place with SOLL with respect to the internal layout of the health and fitness facility.
4.3Attached are two plans of the proposed extension. The first three are external layouts of the extension from three sides. The fourth plan is an internal layout. Alterations to the original proposal, given planning permission, are required due to the need for an external
d:\moderngov\data\published\intranet\c00000104\m00000143\ai00000813\tilsleypark2sept0520.doc wall at the back of the extension (East elevation). This is due to this originally being an internal wall dividing this area from a bowls hall.
4.4A meeting to discuss these proposals has been held with Development Control and the Chair of the Development Control Committee. The alterations required have been identified as those that can be dealt with as minor amendments to the original planning permission.
4.5The internal layout, plan 4, depicts six main areas with the proposed facility. These being: i. A Kinesis Studio; ii. A Dance Studio; iii. A Spinning Studio (labelled ‘Spin’); iv. A Cardiovascular Studio ( the area with rows of equipment identified); v. A Weights area (between the Kinesis Studio and the area marked ‘Reception’); and vi. A Reception and consultation room at the left of the drawing and the entrance to this extension from the existing facility.
4.6Others elements of the proposed scheme include a health spa based facility located in the buffer changing accommodation in the main building and a sunbed. The exact health spa product to be used is yet to be determined although it is likely to be either sauna or steam or some combination of these services.
Read every report as text, not just the decision
Pro opens the officer report behind each decision, searchable and quotable, across every council we cover.
We use a cookie to keep you signed in and run your free-paper allowance, and an optional one to count visits. You can accept all, or choose. Privacy & cookies
Necessary
Keeps you signed in and runs your free-paper allowance. Always on.
Always on
Analytics
Counts visits and which pages are used. First-party only, no advertising, never shared.