Executive, Tuesday 6 January 2015 at 6.45pm

Contaminated Land: Potential Options for Former Landfill Site, Weydon Lane, Farnham

Agreed Executive 4 papers

Executive agreed this item on Tuesday 6 January 2015. Below is the council's own wording, with the papers it was decided on.

Item121

Resolved

The Executive agreed to 1. the short-term management plan for the site; and 2. a Special Interest Group (SIG) being established to assist the Portfolio Holder in reviewing the options and exploring alternative uses for the site in the longer term. [This item has already been considered by the Corporate ...
Word for word from the decision Waverley published for this meeting. Source: modgov.waverley.gov.uk

Follow this further

Built from Waverley's papers

What the report saysPro

Report to Executive

Item Abnormal development requirements Preliminary Budget Abnormal Costs Comments

(1) Assuming approximately 36000m3 of engineering clay imported; (2) Includes for mobilisation, supervision, welfare, site £2,400,000 - £2,600,000 maintenance and security, lanscaping works after placement of cap (3) Maximum cost includes for off site disposal of excavated material 1 Clay cap

(1) For Construction Quality Assurance, (2) Assumes 16 week programme; 2 visits per week during a 10 week period; £19,000 chemical testing and geotechnical testing

Land drainage (if final use is informal / formal public (1) Drain pipes with allowance for bends, junctions, saddles, tapers; and excavating trenches by machine (2) Surplus spoil 2 180,000 - £190,000 open space) removed off site to nearest tip

1 Storey: £6,600 - £8,400 (1) Assumed an area of 600m2 (2) Based on unit rates provided in Spon's Civil Engineering and Highway Works Price Book 20102 (3) Based on the difference between standard shallow strip foundations and raft foudations 2 Storeys: £30,000 - £33,600 Extra Storey: £42,000 - £66,000 3 Pavilion Foundations 1 Storey: £88,400 - £115,400 (1) Assumed an area of 600m2 (2) Based on unit rates provided in Spon's Civil Engineering and Highway Works Price Book 2012 (3) Based on the difference between standard shallow strip foundations and pile foundation foudations (4) 2 Storeys: £83,600 - £95,000 Includes for provision of a foundation risk assessment for submission to the Environment Agency (5) Excludes for disposal of excess arisings

(1) Assumes a floor slab area of 600m2 (2) Lower range assumes Monarperm 500 membrane, upper range assumes a 2000 gas membrane (3) Based on unit rates provided by Visqueen, Monarperm and in Spon's Civil Engineering and Highway 4 Gas / Damp Proof Membrane £1,000 - £2,000 Works Price Book 2012 (4) Excludes ancillary items such as jointing tape. (5) Choice between gas and damp proof membranes depend on the foundation and floor slab solutions (6) excludes installation, inspection and integrety testing.

5 Sub-floor ventilation £10,000 - £11,000 Based on cost estimate obtained from Cordek for 200mm thick void former, including air bricks and periscopic vents.

(1) Assumes an area of 8000m2 (2) Based on cost provided by Kestrel; a mix of Ketrel Options 2 and 3 to provide likely Grass Pitch: £210,000 - £240,000 preferred option (i.e. compacted granular subbase with a geotextile and geogrid layer beneath (3) Includes vegetation 6 Pitch construction clearance, drainage and 12 months maintenace (4) Upper range includes the provisional items recommended by Kestrel

(1) Assumes an area of 9000m2 (2) Based on cost provided by Kestrel (3) Includes vegetation clearance and drainage (4) 3G Artificial Pitch: £390,000 - £410,000 Upper range includes the provisional items recommended by Kestrel 7 Underground services Unable to provide a cost at this stage as layout and length of services not determined 8 Assessment of settlement of raft foundation £2,000 - £3,000 Final cost will depend on the results of the supplemenary site investigation.

Read every report as text, not just the decision

Pro opens the officer report behind each decision, searchable and quotable, across every council we cover.

Papers for this item

Kept in our archive, download once signed in
PDF
CGL Abnormal Costs ReportReport 69 KB DownloadRead as text
PDF
CGL Management Plan ReportReport 815 KB Download
PDF
CGL Options Feasibility ReportReport 718 KB Download
PDF
Contaminated Land: Potential Options for Former Landfill Site, Weydon Lane, FarnhamReport 65 KB Download

At this meeting

Whole meeting

Who was there

10 of 10 attended
RK
Councillor Robert KnowlesChair, present
JP
Councillor Julia PottsVice Chair, present
BA
Councillor Brian AdamsCommittee Member, present
CK
Councillor Carole KingCommittee Member, present
TM
Councillor Tom MartinCommittee Member, present
DO
Councillor Donal O'NeillCommittee Member, present
SR
Councillor Stefan ReynoldsCommittee Member, present
SS
Councillor Stewart StennettCommittee Member, present
AT
Councillor Adam Taylor-SmithCommittee Member, present
ST
Councillor Simon ThorntonCommittee Member, present

On this subject at Waverley

Search all
  1. Contaminated Land: Potential Options for Former Landfill Site, Weydon Lane, FarnhamThis decision
  2. Contaminated land: potential options for former landfill site, weydon laneDecided

More from Waverley Executive

All decisions
MeetingDecisionOutcome
1 Sep 2026 Lease Renewal on Unit 3, Enterprise Centre, Farnhamthat 1) Delegated authority be given to the Director of Assets and Property for the granting of the lease of Unit 3, ... Agreed Open
1 Sep 2026 New Contract for Communal Block Cleaning Servicesthat 1) Delegated authority be given to the Director of Housing Service to enter into the Block Cleaning Services con... Decided Open
1 Sep 2026 Acquisition of Land off Hale Road, Adjacent to Farnham Park, Farnhamthat 1) The Executive request consent from West Surrey Shadow Authority to enter into a Conditional Purchase Agreemen... Agreed Open
1 Sep 2026 Waverley Fire Loss - Underinsurance at 13 & 14 Springwood, Station Lane, MilfordRECOMMENDED that Council RESOLVE to: 1) Approve a supplementary estimate increase of £106,269.98 for FY26/27 to be fu... Approved Open
1 Sep 2026 Recycling and Waste Collection and Street Cleansing Services Contracts Arrangements from 1 November 2027that 1) An 8-year extension to the current Waste Collection and Street Cleansing Contract with an option of a contrac... Approved Open

We use a cookie to keep you signed in and run your free-paper allowance, and an optional one to count visits. You can accept all, or choose. Privacy & cookies