Resolved
RESOLVED That the Head of Planning and Corporate Director in consultation with the Executive Member for Planning be authorised to respond to this consultation as set out in the report, plus any further points agreed by the Panel.
Cabinet Planning and Parking Panel agreed this item on Thursday 7 March 2019. Below is the council's own wording, with the papers it was decided on.
Resolved
RESOLVED That the Head of Planning and Corporate Director in consultation with the Executive Member for Planning be authorised to respond to this consultation as set out in the report, plus any further points agreed by the Panel.
1.1Heathrow Airport is currently consulting on three key topics: airspace changes to make better use of the two existing runways, airspace changes for an expanded three-runway airport and future operations for an expanded airport.
1.2The consultation can be viewed at https://afo.heathrowconsultation.com/
1.3The deadline for responding is 4 March 2019. Officers have asked whether this response can be submitted on 8 March 2019 following this Panel meeting.
2.1That the Head of Planning and Corporate Director in consultation with the Executive Member for Planning be authorised to respond to this consultation as set out below, plus any further points agreed by the Panel.
3 Explanation
3.1Heathrow Airport currently operates at 98% of its capacity, which means that any delays or disruptions can have knock-on consequences. It is also seeking to build a third runway to increase its capacity.
3.2In terms of making better use of Heathrow’s existing runways, the airport is consulting on the short-term introduction of Independent Parallel Approaches (IPA) to make the arrivals process more efficient when the airport experiences delays. This would have an impact on less than 10% of arrivals. The IPA proposals would introduce flights over some areas that do not routinely see arriving aircraft today and three design envelopes are presented for consultation (with potential for at least one flightpath in each).
3.3There are two IPA design envelopes which could potentially affect Welwyn Hatfield borough. See Appendix 1 for maps and commentary.
3.4In terms of the operation of a three-runway Heathrow, the consultation seeks views on matters such as runway alternation, respite flightpaths/options, runway directional preference and early morning arrivals. These matters are most important for those living close the airport, but anything designed to alleviate impacts (by providing periods of noise relief/respite) at the local level will also potentially have spin-off benefits further afield, including Hertfordshire. The consultation seeks views on a range of design envelopes, which are swathes within which the airport considers up to three future flightpaths will be located. 3.5 A design envelope is a geographical area within which it is technically possible to position one or more flight paths. It does not mean that final flight paths will be spread across the full width of the envelope. The envelopes have been divided into sections to show the heights that aircraft could be flying at for that portion of the envelope. Given that the height (altitude) of an aircraft affects the noise level experienced on the ground, we have assumed the lowest potential heights for these design envelopes. In reality, we would expect aircraft will be flying higher (and should therefore be quieter when heard from the ground). The design envelopes also show the number of aircraft which might fly through that envelope in a given day. By providing information on the number, height and noise of potential flights over your area, our design envelopes aim to give you an understanding of the potential impact of flights and helps you to respond to this consultation.
3.6There are three design envelopes which could potentially affect Welwyn Hatfield borough. See Appendix 2 for maps and commentary.
Pro opens the officer report behind each decision, searchable and quotable, across every council we cover.
PDF |
HEATHROW AIRPORT AIRSPACE AND FUTURE OPERATIONS CONSULTATIONReport | 2.5 MB | DownloadRead as text |
Follow Cabinet Planning and Parking Panel at Welwyn Hatfield and we tell you when its next papers are published, before the meeting rather than after it.
| Meeting | Decision | Outcome | |
|---|---|---|---|
| 24 Jun 2026 | Introduction of waiting restrictions and verge and footway prohibition, in various roads (north), hollybush ward, welwyn garden cityThe Panel resolved unanimously: To consider the objections received in Section 5 of the report in addition to the iss... | Noted | Open |
| 24 Jun 2026 | Introduction of waiting restrictions and verge and footway prohibition, in various roads (south), hollybush ward, welwyn garden cityThe Panel resolved unanimously: To consider the objections received in Section 5 of the report in addition to the iss... | Noted | Open |
| 21 Jan 2026 | 2026 - 28 Parking Works ProgrammeUnanimous That Cabinet Planning and Parking Committee: a) Recommends to Cabinet that the proposed PSWP, as outlined i... | Approved | Open |
| 19 Nov 2025 | Walden and Blakemere Review(Unanimously agreed) “THE BOROUGH OF WELWYN HATFIELD (VARIOUS ROADS, SHERRARDS WELWYN GARDEN CITY) (RESTRICTION OF WA... | Agreed | Open |
| 18 Sep 2025 | Introduction of resident permits, waiting restrictions and verge and footway prohibition in various roads, welham green(Unanimous) That Cabinet Planning and Parking Panel (CPPP) recommend to Cabinet that: a) “ THE BOROUGH OF WELWYN HATF... | Noted | Open |
We use a cookie to keep you signed in and run your free-paper allowance, and an optional one to count visits. You can accept all, or choose. Privacy & cookies
Keeps you signed in and runs your free-paper allowance. Always on.
Counts visits and which pages are used. First-party only, no advertising, never shared.