THE HOLDINGS, COLE GREEN LANE, WELWYN GARDEN CITY, AL7 4AL - 6/2019/1851/VAR - REMOVAL OF CONDITIONS 19 (HOURS OF OPERATION OF MACHINERY) AND 20 (TIMES OF DELIVERIES) ON PLANNING PERMISSION 6/2018/2726/MAJ

Approved Committee 2 papers

Development Management Committee approved this item on Thursday 5 December 2019. Below is the council's own wording, with the papers it was decided on.

Item81

Resolved

( voting 9 in favour, 3 against) That planning permission be APPROVED subject to the conditions as set out in report, the completion of a s106 and the referral of the application to the Secretary of State before determination.
Word for word from the decision Welwyn Hatfield published for this meeting. Source: democracy.welhat.gov.uk

Follow this further

Built from Welwyn Hatfield's papers

What the report saysPro

Report to Development Management Committee

Background

1.1Members may recall the previous planning application for this site (6/2018/2726/MAJ) was reported to Committee on 28 March 2019 which was granted planning permission. The approved scheme was for the erection of 4 industrial/commercial buildings within use class B8 with associated landscaping, access and infrastructure works. The Committee Report is attached at Appendix 1.

1.2That approval followed a previous application (6/2015/2416/MAJ) which was reported to Committee on 26 May 2016 and was granted planning permission for eight, two-storey, mixed B class use units with a footprint of 2,910sqm and floorspace of 5,820sqm.

1.3The 2018 application was submitted as a larger development was required to accommodate more floorspace to make the scheme viable. This was because the site has been used for landfill and has become contaminated. Remediation works were required by condition on the 2015 planning permission. The applicant submits that the costs of the remediation works are higher than anticipated and that a larger development was therefore required to accommodate more floorspace to make it viable.

2 The Application Site

2.1The application site comprises approximately 2.25 hectares in area on the eastern edge of Welwyn Garden City. It has a frontage onto Cole Green Lane (B195), near to its junction with Black Fan Road and approximately 1km north of its junction with the A414. There are a number of earth bunds along the site frontage and several mature trees. The site’s main vehicle access is from the east off Cole Green Lane and this has been closed off with concrete barriers and the gate is locked. A second access at the south east corner of the site

Classification: Unrestricted Classification: Unrestricted

has also been closed. The northern end of the site is part of Howells Wood. The Cole Green Way, bridle path and cycle way (National Route 61) run near to the west side (rear) of the site.

2.2The site is currently in the Green Belt but has been included in the Emerging Local Plan as an Employment Site. It is located between the eastern edge of Welwyn Garden City and the proposed Birchall Garden Suburb as designated in the adopted East Hertfordshire Local Plan 2018.

2.3The site to the south east is used for recycling inert waste and contains a large building. This site is also in the Green Belt and is surrounded by earth bunds several metres high.

3 Proposal

3.1Planning permission is sought to remove conditions 19 and 20 of planning permission 6/2019/1851/VAR.

3.2Condition 19 states:

No machinery shall be operated and no process shall be carried out (except for office work) outside the hours of 07:00 – 19:00 Mondays to Fridays, 07:00 – 17:00 Saturdays nor at any time on Sundays, Bank or Public Holidays.

Reason: To protect the occupants of nearby properties from noise disturbance.

3.3Condition 20 states:

No deliveries shall be taken or dispatched from the site outside the hours of 07:00 – 19:00 Mondays to Fridays, 07:00 – 17:00 Saturdays nor at any time on Sundays, Bank or Public Holidays Reason: To protect the occupants of nearby properties from noise disturbance. 3.4 The applicant outlines that the conditions are required to be removed because it severely limits the operation of a modern purpose built warehouse as they operate on a 24 hour basis. The proposed removal of the conditions would enable the development to proceed with confidence that a viable warehouse operation is possible. There are no alterations to the design, size and layout of the proposed development already permitted.

Read every report as text, not just the decision

Pro opens the officer report behind each decision, searchable and quotable, across every council we cover.

Papers for this item

Kept in our archive, download once signed in
PDF
11a: Appendix 1: 2018 2726 MAJ The HoldingsAppendix 479 KB Download
PDF
THE HOLDINGS, COLE GREEN LANE, WELWYN GARDEN CITY, AL7 4AL: 6/2019/1851/VAR: REMOVAL OF CONDITIONS 19 (HOURS OF OPERATION OF MACHINERY) AND 20 (TIMES OF DELIVERIES) ON PLANNING PERMISSION 6/2018/2726/MAJReport 482 KB DownloadRead as text

At this meeting

Whole meeting

Who was there

13 of 22 attended
JB
Councillor Jonathan BoultonChairman, present
SW
Councillor Simon WrennVice-Chairman, apologies
SB
Councillor Stephen BoultonCommittee Member, present
JB
Councillor James BroachCommittee Member, present
AC
Councillor Alan ChestermanCommittee Member, present
JC
Councillor Julie CraggCommittee Member, present as substitute
SE
Councillor Siobhan ElamCommittee Member, present
BF
Councillor Barbara FitzsimonCommittee Member, present
PH
Councillor Peter HebdenCommittee Member, present
SK
Councillor Samuel KasumuCommittee Member, apologies
ML
Councillor Mike LarkinsCommittee Member, present
FA
Councillor Frank A MarshCommittee Member, present

All 22 on the meeting page

On this subject at Welwyn Hatfield

Search all
  1. THE HOLDINGS, COLE GREEN LANE, WELWYN GARDEN CITY, AL7 4AL - 6/2019/1851/VAR - REMOVAL OF CONDITIONS 19 (HOURS OF OPERATION OF MACHINERY) AND 20 (TIMES OF DELIVERIES) ON PLANNING PERMISSION 6/2018/2726/MAJThis decision
  2. The holdings, cole green lane, welwyn garden city, al7 4al - 6/2019/1851/var - removal of conditions 19 (hours of operation of machinery) and 20 (times of deliveries) on planning permission 6/2018/2726/majDecided
  3. The holdings, cole green lane, welwyn garden city, al7 - 6/2015/2416/maj - proposed two storey office (b1a) use and general industrial (b2) use and storage and distribution (b8) use on former equestrian land as permitted and commenced under planning permission n6/1993/0244/opApproved

More from Welwyn Hatfield Development Management Committee

All decisions
MeetingDecisionOutcome
25 Jun 2026 6/2025/2484/FULL - 109 Woods Avenue, Hatfield, AL10 8QQ(for 11, against 0, abstain 0) That planning permission be granted, subject to the conditions set out in the report. Decided Open
25 Jun 2026 Appeal Decisions 2 March 2026 to 12 June 2026 ReportResolved – the Committee noted the report. Noted Open
25 Jun 2026 Future Planning ApplicationsResolved – the Committee noted the report. Noted Open
12 Mar 2026 Appeal Decisions 2 February 2026 to 2 March 2026 ReportRESOLVED It was resolved to note the contents of the report. Noted Open
12 Mar 2026 Future Planning ApplicationsRESOLVED To note the contents of the report. Noted Open

We use a cookie to keep you signed in and run your free-paper allowance, and an optional one to count visits. You can accept all, or choose. Privacy & cookies