RESOLVED (A) That the Tawd Valley Park Masterplan, attached as an appendix to the report, be approved, subject to resource availability, and the project proceed to the next phase of design and costing of the proposals. (B) That the approved be circulated for a further short term public consultation, and the Director of Leisure and Wellbeing, in consultation with the Portfolio Holder for Leisure, be authorised to approve any further amendments
Word for word from the decision West Lancashire published for this meeting.Source: democracy.westlancs.gov.uk
Ta w d V a l l e y P a r k M a s t e r p l a n Summary Report Prepared by Groundwork and Ryder Landscape Consultants
for We s t L a n c a s h i re B o ro u g h C o u n c i l
October 2017
1 Contents
Introduction Page 03
Overall Objectives Page 04
Proposed Masterplan Page 05
Precedents Page 24
Visualisations Page 26
Appendix: 1. Masterplan (317-RYD-XX-XX-DR-L-1000) 2. Zoning Plan (317-RYD-XX-XX-DR-L-1003) 3. Signage Strategy (317-RYD-XX-XX-DR-L-1001) 4. Pathworks Plan (317-RYD-XX-XX-DR-L-1002) 5. Orienteering Route Plan (317-RYD-XX-XX-DR-L-1004)
2 Introduction
This report has been prepared as part of the Tawd Valley Park Masterplan proposals. Its function is to explain: • The process undertaken to develop proposals for the park; and • The proposals themselves.
Process to arrive at these proposals
The development of the Masterplan has been a collaborative proccess between West Lancashire Borough Council, Groundwork Cheshire, Lancashire & Merseyside and Ryder Landscape Consultants.
As part of the process site surveys were undertaken to review existing site conditions, historical mapping examined, and current strategies investigated.
A public consultation has been conducted by the West Lancashire Borough Council and this information has been fed into the design process.
A proposed pathworks drawing prepared by Lancashire County Council has been adopted and incorporated into the proposals.
The Masterplan has been prepared along with other, more specifc proposals including Zoning Plan, Pathworks Plan, Signage Strategy and Orienteering Route.
One of the Valley’s unbound footpaths running through a meadow glade.
3 Overall Objectives
• Be a fun, safe place to visit; • Encourage local people to visit the Park with new activities for various age groups; • Be as accessible for users with lower mobility levels; • Promote the Park’s heritage by reinstating historical paths and landscape features; • Improve the maintenance of the River Tawd and promote water related activities; • Retain existing areas of ecological interest and the overall “wild” character of the Park; A place for all levels of mobility A place for exercise and fun • Enhance existing habitat and create new habitat types; and • Be straight-forward and cost efficient to manage and maintain.
A place that respects existing wildlife A place with new habitats
4 Proposed Masterplan
This report explains in detail the proposed interventions and should be read in conjunction with the Masterplan Drawing 317-RYD-XX-XX-DR-L-1000.
For pathworks details and signage strategy refer to drawings: 317-RYD-XX-XX-DR-L-1001 and 317-RYD-XX-XX-DR-L-1002.
Masterplan - October 2017
A reduced version of the overall masterplan.
Best read on an A0 plan at 1:2000 scale. 5 Tawd Valley, Skelmersdale Himalayan balsam to Handrails to be replaced Masterplan Proposal be cleared Bridge to be resurfaced
12 1 11 2 Proposed new litter bin 3 7 9 Location Plan Proposed new Fallen tree to bench be removed
6 8 10 Proposed new 4 5 sigange
1. Existing pedestrian 2. Existing pedestrian bridge: 4. Former concrete 6. Existing sycamore 8. Existing path: 11. Existing steps to be path: - replace railing and flooring signage: tree - to be resurfaced. refurbished. - clear path surface; timbers. - to be utilised as - to be crown lifted. - inspect lighting column; building material for 9. Proposed new 12. Potential new signage/ 3. Trees along the river banks - remove fallen trees; new signage. accessible path. information board - remove fallen trees and 7. Existing invasive - install litter bin; and overhanging branches to vegetation 5. Existing steps: 10. Proposed new - new side planting. clear out views to the river. - clear Himalayan - handrail to be pathlink repainted. balsam.
6 Tawd Valley, Skelmersdale Masterplan Proposal Lighting column to Overhanging branches and trees on river be inspected and banks to be cleared to allow views to the repaired or replaced river as required
Read every report as text, not just the decision
Pro opens the officer report behind each decision, searchable and quotable, across every council we cover.
Corporate Performance Reporting 2024/25A. That the delivery plan at Appendix 1 be approved for reporting as the Council Priorities Delivery Plan. B. That th...
We use a cookie to keep you signed in and run your free-paper allowance, and an optional one to count visits. You can accept all, or choose. Privacy & cookies
Necessary
Keeps you signed in and runs your free-paper allowance. Always on.
Always on
Analytics
Counts visits and which pages are used. First-party only, no advertising, never shared.