Resolved
Decision Planning permission be GRANTED subject to the following conditions: 1 The development hereby permitted shall be begun not later than three years from the date of this permission. 2 The development hereby permitted shall not be carried out except in complete accordance with the details shown on the approved plans and documents, unless otherwise stated. 3 No development above slab level shall take place until details of the exterior materials shall be submitted to and approved in writing by the Local Planning Authority. The development shall be carried out in accordance with the approved details. 4 Before the access is first used visibility splays shall be provided as shown on Drawing No. 2292/LO(-)01B with an X dimension of 2.4 metres and a Y dimension of 42 metres [tangential to the nearside edge of the carriageway] and thereafter retained in the specified form. Notwithstanding the provisions of Part 2 Class A of the Town & Country Planning (General Permitted Development) Order 2015 (or any Order revoking and re-enacting that Order with or without modification) no obstruction to visibility shall be erected, constructed, planted or permitted to grow over 0.6 metres high within the areas of the visibility splays. 5 The areas to be provided for the storage and presentation of refuse and recycling bins as shown on Drawing No. 2292/LO(-)01B shall be provided in their entirety before the development is brought into use and shall be retained thereafter for no other purpose. 6 The use shall not commence until the area(s) within the site shown on Drawing No. 2292/LO(-)01B for the purposes of manoeuvring and parking of vehicles has been provided and thereafter that area(s) shall be retained and used for no other purposes. 7 Before the development is commenced details of electric vehicle charging infrastructure shall be submitted to and approved in writing by the Local Planning Authority. The approved scheme shall be carried out in its entirety before the development is brought into use and shall be retained thereafter and used for no other purpose. 8 Before the development is commenced details of the areas to be provided for the secure, covered and lit cycle storage shall be submitted to and approved in writing by the Local Planning Authority. The approved scheme shall be carried out in its entirety before the development is brought into use and shall be retained thereafter and used for no other ... view the full minutes text for item 269.