Resolved
Resolved (13:0:1 abstention) – That the application be approved subject to the following conditions: 1. The development hereby permitted shall be begun before the expiration of 3 years from the date of this permission. 2. The development hereby permitted shall be carried out in accordance with the approved plans received by the local planning authority on 12th August 2019 and listed as follows: Location Plan, received 12th August 2019; 201/A, received 12th December 2019 202, received 12th August 2019; 401, received 12th August 2019; 501, received 12th August 2019; 502, received 12th August 2019; 039.01.10 (Figure 6.1)/A, received 8th January 2020; and 'Preliminary Ecological Assessment' and 'Addendum' reports (produced by Etive Ecology Ltd in June and November 2019). 3. Prior to any above ground works to the hereby approved extension taking place, samples of the facing, roofing, window materials to be used in the external construction of this development shall be submitted to and approved in writing by the Local Planning Authority. The approved materials shall then be used in the construction of the development. 4. Prior to the commencement to any works, a Construction Environmental Management Plan (CEMP) shall be submitted for approval to the Local Authority. The CEMP shall set out measures to manage and mitigate effects on European sites, protected and Priority Species and Habitats. The CEMP shall include the agreed method statements as set out in the submitted in the 'Preliminary Ecological Assessment' and 'Addendum' reports (produced by Etive Ecology Ltd in June and November 2019) to mitigate or avoid adverse environmental impacts on these features including: · Pre-commencement check for signs of breeding birds (if required), amphibians and terrestrial mammals; · Noise, vibration and dust control measures; · Avoidance of the breeding bird season (1 March to 31 August); · Brown hare reasonable avoidance measures; · Protection measures for retained Priority Habitat hedgerow, ponds as well as boundary tree lines and woodland copse; · Pollution prevention measures for controlled waters; · Reasonable avoidance measures for terrestrial mammals: · All trenches and excavations should have a means of escape (e.g. a ramp); · Any exposed open pipe systems should be capped to prevent mammals gaining access; and · Appropriate storage of materials to ensure that mammals do not access them. · Reasonable avoidance measures for amphibians including GCN as set out in section 4 of the Preliminary Ecological Appraisal (PEA); and · A sensitive construction and operational lighting scheme which avoids excessive light spill on Priority Habitat, tree lines, woodland and off site fields. · In accordance with policy WM8 of Merseyside and Halton Waste Joint Local Plan, evidence through a waste audit or a similar mechanism (e.g. a soil management plan) demonstrating how the minimisation of waste production, efficient use of resources, including designing out waste and minimisation of off-site disposal shall be achieved The CEMP shall be compiled in a coherent and integrated document and should be accessible to site ... view the full minutes text for item 83.