Resolved
That the Committee note the Council’s Quarter 2 performance for 2021/22.
Place and Economic Development Committee noted this item on Monday 1 November 2021. Below is the council's own wording, with the papers it was decided on.
Resolved
That the Committee note the Council’s Quarter 2 performance for 2021/22.
Appendix 1
Place & Economic Development Performance Report
PED Projects & Actions 2021/22
Action Status
Cancelled
Overdue; Neglected
Unassigned; Check Progress
Not Started; In Progress; Assigned
Completed
Review of the South Worcestershire Development Plan Following discussions between the three local authorities in Sponsor Simeon Manley the summer of 2021, it was determined that additional time Due Date 01-Apr-2023 was required to prepare the SWDP Review for the Regulation 19 (Publication) stage. Original Due 01-Nov-2021 Date In particular, further work is required relating to Current Status infrastructure and viability evidence base updates and planning for the proposed strategic locations (Parkway, Expected Throckmorton, Rushwick, Mitton). Progress is also Outcome contingent on key information that is being provided externally, for example essential traffic modelling updates (Worcestershire County Council), other infrastructure evidence (e.g. utilities), and viability update work (external consultants).
Accordingly, the timetable (i.e. the Local Development Scheme) has been amended to reflect the required changes to the project timeframe.
The new SWDP Review timetable is as follows:
Publication Consultation (Regulation 19) – July to August 2022 Submission (Regulation 22) – November 2022 Independent Examination (Regulation 24) – February 2023 - May 2023 (Timeframe is dependent upon availability and scheduling at the Planning Inspectorate). Receipt of Inspector’s Report (Regulation 25) – August 2023 (A ‘Main Modifications’ consultation may be required at this stage of the plan-making process subject to the Inspector’s examination findings).
2 Adoption (Regulation 26) – October 2023
The revised LDS came into effect on 1st October 2021.
The SWDP Review is also still subject to the government's proposed changes to the planning system in England, which was consulted on in August 2020, with the full outcome of the consultation yet to be published. Some of the proposed changes, if brought into effect, may impact on the ability of the South Worcestershire Councils to meet this amended timetable. However, some changes have already been introduced, such as the introduction of First Homes and the National Model Design Code, changes which the South Worcestershire Councils will need to consider.
Foregate Arches / Cultural Development Fund Workstream 1 - Infrastructure Sponsor David Blake • Curtain walling being installed Due Date 25-Feb-2022 • Western Power about to commence work on site which provide power once the arches are weather tight Original Due 31-Mar-2021 • Ongoing engagement with Network Rail regarding Date programme of works Current Status
Workstream 2 - Festivals Expected • Light Night 2021 and The Rising (begins) progressing Outcome
Workstream 3 – Participate • Progressing with program focusing on online delivery. Mid programme evaluation completed.
Workstream 4 – Destination Management • Work with partners on track. • Artwork being progressed for 56 Foregate Street.
City Centre Master Plan - Feasibility Works for Key Sites • Archaeology reports being reviewed internally which Sponsor David Blake will allow conclusions to sensitivity of sites for below Due Date 31-Mar-2020 ground deposits • Awaiting final integrated drainage report from Original Due 31-Mar-2020 consultants (draft report due to be received by 30th Date November 2021) - flood model has taken longer to Current Status produce than expected. It is proposed that the project due date is amended Expected to 31 March 2022. Outcome
Pro opens the officer report behind each decision, searchable and quotable, across every council we cover.
PDF |
Q2 202122PEDPerformanceReport FinalReport | 17 pages | DownloadRead as text |
PDF |
Quarter 2 Performance Report for 2021/22Report | 1 pages | Download |
Follow Place and Economic Development Committee at Worcester and we tell you when its next papers are published, before the meeting rather than after it.
| Meeting | Decision | Outcome | |
|---|---|---|---|
| 16 Mar 2026 | MinutesThat the minutes of the meeting held on 26 th January 2026 be approved as a correct record and signed by the Chair. | Approved | Open |
| 16 Mar 2026 | Review of the Shrub Hill Quarter Supplementary Planning DocumentThat the Committee: 1. approves the draft Shrub Hill Quarter Supplementary Planning Document, as set out in appendix ... | Approved | Open |
| 16 Mar 2026 | Review of the Air Quality Supplementary Planning DocumentThat the Committee: 1. approves the draft Air Quality Supplementary Planning Document, as set out in appendix 1, for ... | Approved | Open |
| 16 Mar 2026 | Review of the Affordable Housing Supplementary Planning DocumentThat the Committee: 1. approves the draft Affordable Housing Supplementary Planning Document, as set out in appendix ... | Approved | Open |
| 16 Mar 2026 | Review of A Guide to Shopfronts and Signage Supplementary Planning DocumentThat the Committee: 1. approves the draft Shopfronts Guide Supplementary Planning Document, as set out in appendix 1,... | Approved | Open |
We use a cookie to keep you signed in and run your free-paper allowance, and an optional one to count visits. You can accept all, or choose. Privacy & cookies
Keeps you signed in and runs your free-paper allowance. Always on.
Counts visits and which pages are used. First-party only, no advertising, never shared.