Worcester City Council
Place and Economic Development Committee, Monday 3 June 2024 at 7.00pm

Quarter 4 Annual Performance Report for 2023/24

Agreed Committee 2 papers

Place and Economic Development Committee agreed this item on Monday 3 June 2024. Below is the council's own wording, with the papers it was decided on.

Item5

Resolved

That the Committee agree to note the Council’s quarter 4 and annual performance for 2023/24.
Word for word from the decision Worcester published for this meeting. Source: committee.worcester.gov.uk

Follow this further

Built from Worcester's papers

What the report saysPro

Report to Place and Economic Development Committee, 25 pages

Appendix 1

Place & Economic Development Performance Report

PED Projects & Actions 2023/24

Action Status

Cancelled

Overdue; Neglected

Unassigned; Check Progress

Not Started; In Progress; Assigned

Completed

Strategic Play Area Development Plan Battenhall Park Pump Track - Officers now working towards Sponsor Lloyd Griffiths the completion of the mitigation plan with only the botanical Due Date 31-Mar-2025 survey outstanding and that will be completed by the end of the month. A date for a meeting with the local resident Original Due 31-Mar-2025 group will then be arranged. Date Current Status Horizon Hub MUGA Project- Work to commence soon on the perimeter fencing behind both goal ends- awaiting Expected Outcome confirmation of the date when the contractor will start on site as the panels have been in fabrication. Once that work is completed the resurfacing works will commence subject to the appropriate weather conditions due to the requirements of the curing process.

Gillam Street Open Space Project - The appointed contractor will start on site in early July to complete the following works;

• Removal of all shrub roots and top soiling areas as required. • Existing path – Grade path to achieve 1.2m width and top out with new crushed gravel. • New path – Create new crushed gravel path alongside MUGA including access paths to MUGA. • Installation of 5No. self-closing gates (WCC to purchase gates at a cost of £4,500) • Installation of a 3-hoop cycle stand (WCC to purchase at a cost of £300) • Culvert Works – Pipe installation and topsoil infill to entire area. • Grass seeding to all areas following top soiling works.

Following the above works the below soft landscaping would

2 take place during the autumn/winter period as follows;

• Tree Planting • Hedge Planting • Wildflower Meadows

Cotswold Way 'Play on the Way' Project - The appointed landscape architect has now completed the first draft of the masterplan for the site. A meeting will now be arranged with the local ward councillors for their comments, before further public consultation is undertaken.

Foregate Arches / Cultural Development Fund Workstream 1 - Infrastructure Sponsor Zoey West Progressing the demolition of No.56 Foregate Street with Due Date 30-Sep-2024 regard to the creation of a pedestrian link to the riverside. Original Due 31-Mar-2021 Engaging with Network Rail over works in close proximity to Date railway line is ongoing. Current Status

Progressing planning condition discharge. Expected Outcome

Workstream 2 - Festivals Now complete.

Workstream 3 – Participate Now complete.

Workstream 4 – Destination Management City Council Tourism and Event colleagues have engaged with Arches occupiers to advance inclusion of the area into the wider City programme of activities.

Future High Streets Fund - retail unit / property enhancements The only projects now awaiting completion are the two Sponsor Zoey West requiring planning consent - 11 Angel Street and 24-25 The Due Date 31-Mar-2025 Cross. Decisions on both applications are pending. Original Due 31-Mar-2025 Date Current Status

Expected Outcome

Future High Streets Fund - Public Realm The final phase (Angel Street) which will see all footway Sponsor Zoey West areas widened, resulting in narrowing of the carriageway Due Date 31-Mar-2025 and the introduction of a new loading bay outside the Corn Exchange, has been partially completed (on the northern Original Due 31-Mar-2025 Date

3 footway). The southern footway and carriageway Current Status resurfacing has been halted to allow any and all construction works to the Scala site to be completed prior to re- Expected Outcome mobilisation of the public realm team to finish this phase of works.

Read every report as text, not just the decision

Pro opens the officer report behind each decision, searchable and quotable, across every council we cover.

Papers for this item

Kept in our archive, download once signed in
PDF
202324PEDAnnualPerformanceReport 0.3 FinalReport 25 pages DownloadRead as text
PDF
Quarter 4 Annual Performance Report for 2023/24Report 1 pages Download

At this meeting

Whole meeting

On this subject at Worcester

Search all
  1. Quarter 4 Annual Performance Report for 2023/24This decision
  2. Quarter 4 and Annual Key Performance Indicator Report for 2025/26Agreed
  3. Quarter 4 and Annual Performance Report for 2025/26Noted
  4. Quarter 4 and Annual Performance Report for 2025/26Agreed
  5. Quarters 2 and 3 Performance Report 2025-26Decided
  6. Quarter 3 Performance Report For 2025/26Agreed

More from Worcester Place and Economic Development Committee

All decisions
MeetingDecisionOutcome
16 Mar 2026 MinutesThat the minutes of the meeting held on 26 th January 2026 be approved as a correct record and signed by the Chair. Approved Open
16 Mar 2026 Review of the Shrub Hill Quarter Supplementary Planning DocumentThat the Committee: 1. approves the draft Shrub Hill Quarter Supplementary Planning Document, as set out in appendix ... Approved Open
16 Mar 2026 Review of the Air Quality Supplementary Planning DocumentThat the Committee: 1. approves the draft Air Quality Supplementary Planning Document, as set out in appendix 1, for ... Approved Open
16 Mar 2026 Review of the Affordable Housing Supplementary Planning DocumentThat the Committee: 1. approves the draft Affordable Housing Supplementary Planning Document, as set out in appendix ... Approved Open
16 Mar 2026 Review of A Guide to Shopfronts and Signage Supplementary Planning DocumentThat the Committee: 1. approves the draft Shopfronts Guide Supplementary Planning Document, as set out in appendix 1,... Approved Open

We use a cookie to keep you signed in and run your free-paper allowance, and an optional one to count visits. You can accept all, or choose. Privacy & cookies