Planning and Regulatory Committee

Tuesday 7 July 2020, 10.00amHeld 2332 days ago.
Online only Open to the public.
9 items, 25 papersAbout 38 MB, led by Proposed installation of a new terminal pumping station incorporating a pumped storm overflow to replace the existing pumping station at New Street in Upton-upon-Severn to improve capacity and flood resilience on land to the south of New Street, Upton-upon-Severn, Worcestershire (Agenda item 7).
No exempt items listedEvery item is due to be heard in public.
This meeting was held7 July 2020
9items
25papers
2decisions
–exempt
Running order, sized by papersItem 1 to 1047
ReportsProcedureExempt parts

The agenda, item by item

What the committee will consider, in order, with every paper attached to its item. Proposed installation of a new terminal pumping station incorporating a pumped storm overflow to replace the existing pumping station at New Street in Upton-upon-Severn to improve capacity and flood resilience on land to the south of New Street, Upton-upon-Severn, Worcestershire (Agenda item 7) is the main business.

1
Procedure

Available papers

The Members had before them: A. The Agenda papers (previously circulated); B. A copy of the summary presentations from the public participants invited to speak (previously circulated); and C. The Minutes of the meeting held on 3 December 2019 (previously circulated).

1040
Procedure

Named Substitutes (Agenda item 1)

1041
Procedure

Apologies/ Declarations of Interest (Agenda item 2)

1042
Procedure

Public Participation (Agenda item 3)

The Council has put in place arrangements which usually allow one speaker each on behalf of objectors, the applicant and supporters of applications to address the Committee. Speakers are chosen from those who have made written representations and expressed a desire to speak at the time an application is advertised. Where there are speakers, presentations are made as part of the consideration of each application.

1043
Procedure

Confirmation of Minutes (Agenda item 4)

To confirm the Minutes of the meeting held on 3 December 2019. (previously circulated)

Decision: RESOLVED that the Minutes of the meeting held on 9 July 2019 be confirmed as a correct record and signed by the Chairman. Decision page

1044
Report

Temporary Permission (5 years) for a proposed materials recovery plant to process road sweepings and highway drainage clearance materials on land at Station House, Saltway, Hanbury, Worcestershire (Agenda item 5)

7 papers, 4.2 MBSearch inside with Pro
ReportTemporary Permission (5 years) for a proposed materials recovery plant to process road sweepings and highway drainage clearance materials on land at Station House, Saltway, Hanbury, Worcestershire (Agenda item 5)712 KBCopy on its way
Reportpl 2020 07 07 Station House: Plan1756 KBCopy on its way
Reportpl 2020 07 07 Station House: Plan2867 KBCopy on its way
Reportpl 2020 07 07 Station House: Plan3440 KBCopy on its way
Reportpl 2020 07 07 Station House: Plan4597 KBCopy on its way
Reportpl 2020 07 07 Station House: Plan5371 KBCopy on its way
Reportpl 2020 07 07 Station House: Plan6436 KBCopy on its way
1045
Report

Proposed extension of building to House 1 No. additional biomass boiler at Go Greener, Guinness Park Farm, A4103, Leigh Sinton, Worcestershire (Agenda item 6)

6 papers, 2.6 MBSearch inside with Pro
ReportProposed extension of building to House 1 No. additional biomass boiler at Go Greener, Guinness Park Farm, A4103, Leigh Sinton, Worcestershire (Agenda item 6)756 KBCopy on its way
Reportpl 2020 07 07 Guinness Park Farm: Plan1652 KBCopy on its way
Reportpl 2020 07 07 Guinness Park Farm: Plan2616 KBCopy on its way
Reportpl 2020 07 07 Guinness Park Farm: Plan3253 KBCopy on its way
Reportpl 2020 07 07 Guinness Park Farm: Plan4160 KBCopy on its way
Reportpl 2020 07 07 Guinness Park Farm: Plan5184 KBCopy on its way
1046
ReportMain business

Proposed installation of a new terminal pumping station incorporating a pumped storm overflow to replace the existing pumping station at New Street in Upton-upon-Severn to improve capacity and flood resilience on land to the south of New Street, Upton-upon-Severn, Worcestershire (Agenda item 7)

6 papers, 10 MBSearch inside with Pro
ReportProposed installation of a new terminal pumping station incorporating a pumped storm overflow to replace the existing pumping station at New Street in Upton-upon-Severn to improve capacity and flood resilience on land to the south of New Street, Upton-upon-Severn, Worcestershire (Agenda item 7) PDFCopy on its way
Reportpl 2020 07 07 Upton: Plan1415 KBCopy on its way
Reportpl 2020 07 07 Upton: Plan2540 KBCopy on its way
Reportpl 2020 07 07 Upton: Plan36 MBCopy on its way
Reportpl 2020 07 07 Upton: Plan42 MBCopy on its way
Reportpl 2020 07 07 Upton: Plan51 MBCopy on its way
1047
Report

Protocol for Delegation of Decision-making: Proposed amendments (Agenda item 8)

Decision: Decision-making. In the ensuing debate, the Chairman commented that under the previous protocol, one objection had been enough to trigger an item being brought for consideration by the Committee. This approach which did not seem sensible, especially in circumstances where an objector lived a considerable distance from the application site. RESOLVED that the Protocol for Delegation of Decision Making set out in the Appendix 2 of the report be adopted. Decision page

ReportProtocol for Delegation of Decision-making: Proposed amendments (Agenda item 8)229 KBCopy on its way
Reportpl 2020 07 07 Scheme of Delegation: App1: Existing scheme397 KBCopy on its way
Reportpl 2020 07 07 Scheme of Delegation: App2: Amended scheme408 KBCopy on its way
Read inside all 25 papersPro opens every page, searches every appendix, and keeps the papers if the council removes them.

The main business: Proposed installation of a new terminal pumping station incorporating a pumped storm overflow to replace the existing pumping station at New Street in Upton-upon-Severn to improve capacity and flood resilience on land to the south of New Street, Upton-upon-Severn, Worcestershire (Agenda item 7)

Item 1046 is where most of this meeting's papers sit: 6 papers, about 10 MB.

Item 1046

Proposed installation of a new terminal pumping station incorporating a pumped storm overflow to replace the existing pumping station at New Street in Upton-upon-Severn to improve capacity and flood resilience on land to the south of New Street, Upton-upon-Severn, Worcestershire (Agenda item 7)

What is in the pack6 papers, about 10 MB
Report
Proposed installation of a new terminal pumping station incorporating a pumped storm overflow to replace the existing pumping station at New Street in Upton-upon-Severn to improve capacity and flood resilience on land to the south of New Street, Upton-upon-Severn, Worcestershire (Agenda item 7) PDFThe report to the committee
Report
pl 2020 07 07 Upton: Plan1The report to the committee
415 KB
Report
pl 2020 07 07 Upton: Plan2The report to the committee
540 KB
Report
pl 2020 07 07 Upton: Plan3The report to the committee
6 MB
Report
pl 2020 07 07 Upton: Plan4The report to the committee
2 MB
Report
pl 2020 07 07 Upton: Plan5The report to the committee
1 MB
Read and search every page of this itemPro opens all 6 papers, and keeps them if the council removes them.
Get ProCopy on its way

How this item got here

This committee has dealt with the subject before.

26 March 2019Proposed Pinvin Junction Highway Improvements at Pinvin Junction (Junction between A44, A4104 and B4082), Pinvin, near Pershore, Worcestershire (Agenda item 6)
7 July 2020Proposed installation of a new terminal pumping station incorporating a pumped storm overflow to replace the existing pumping station at New Street in Upton-upon-Severn to improve capacity and flood resilience on land to the south of New Street, Upton-upon-Severn, Worcestershire (Agenda item 7)This meeting.

Every paper for this meeting

All 25 papers in one list, with the item each belongs to, its size, and our copy of it. Download any paper from our archive once signed in; read and search it here with Pro.

PaperSizeOur copy
Agenda frontsheetItem
260 KB
Copy queued
Copy on its wayRead here
Agenda reports packItem
19 MB
Copy queued
Copy on its wayRead here
Printed minutesItem
498 KB
Copy queued
Copy on its wayRead here
Temporary Permission (5 years) for a proposed materials recovery plant to process road sweepings and highway drainage clearance materials on land at Station House, Saltway, Hanbury, Worcestershire (Agenda item 5)Item 1044, Temporary Permission (5 years) for a proposed materials recovery plant to process road sweepings and highway drainage clearance materials on land at Station House, Saltway, Hanbury, Worcestershire (Agenda item 5)
712 KB
Copy queued
Copy on its wayRead here
pl 2020 07 07 Station House: Plan1Item 1044, Temporary Permission (5 years) for a proposed materials recovery plant to process road sweepings and highway drainage clearance materials on land at Station House, Saltway, Hanbury, Worcestershire (Agenda item 5)
756 KB
Copy queued
Copy on its wayRead here
pl 2020 07 07 Station House: Plan2Item 1044, Temporary Permission (5 years) for a proposed materials recovery plant to process road sweepings and highway drainage clearance materials on land at Station House, Saltway, Hanbury, Worcestershire (Agenda item 5)
867 KB
Copy queued
Copy on its wayRead here
pl 2020 07 07 Station House: Plan3Item 1044, Temporary Permission (5 years) for a proposed materials recovery plant to process road sweepings and highway drainage clearance materials on land at Station House, Saltway, Hanbury, Worcestershire (Agenda item 5)
440 KB
Copy queued
Copy on its wayRead here
pl 2020 07 07 Station House: Plan4Item 1044, Temporary Permission (5 years) for a proposed materials recovery plant to process road sweepings and highway drainage clearance materials on land at Station House, Saltway, Hanbury, Worcestershire (Agenda item 5)
597 KB
Copy queued
Copy on its wayRead here
pl 2020 07 07 Station House: Plan5Item 1044, Temporary Permission (5 years) for a proposed materials recovery plant to process road sweepings and highway drainage clearance materials on land at Station House, Saltway, Hanbury, Worcestershire (Agenda item 5)
371 KB
Copy queued
Copy on its wayRead here
pl 2020 07 07 Station House: Plan6Item 1044, Temporary Permission (5 years) for a proposed materials recovery plant to process road sweepings and highway drainage clearance materials on land at Station House, Saltway, Hanbury, Worcestershire (Agenda item 5)
436 KB
Copy queued
Copy on its wayRead here
Proposed extension of building to House 1 No. additional biomass boiler at Go Greener, Guinness Park Farm, A4103, Leigh Sinton, Worcestershire (Agenda item 6)Item 1045, Proposed extension of building to House 1 No. additional biomass boiler at Go Greener, Guinness Park Farm, A4103, Leigh Sinton, Worcestershire (Agenda item 6)
756 KB
Copy queued
Copy on its wayRead here
pl 2020 07 07 Guinness Park Farm: Plan1Item 1045, Proposed extension of building to House 1 No. additional biomass boiler at Go Greener, Guinness Park Farm, A4103, Leigh Sinton, Worcestershire (Agenda item 6)
652 KB
Copy queued
Copy on its wayRead here
pl 2020 07 07 Guinness Park Farm: Plan2Item 1045, Proposed extension of building to House 1 No. additional biomass boiler at Go Greener, Guinness Park Farm, A4103, Leigh Sinton, Worcestershire (Agenda item 6)
616 KB
Copy queued
Copy on its wayRead here
pl 2020 07 07 Guinness Park Farm: Plan3Item 1045, Proposed extension of building to House 1 No. additional biomass boiler at Go Greener, Guinness Park Farm, A4103, Leigh Sinton, Worcestershire (Agenda item 6)
253 KB
Copy queued
Copy on its wayRead here
pl 2020 07 07 Guinness Park Farm: Plan4Item 1045, Proposed extension of building to House 1 No. additional biomass boiler at Go Greener, Guinness Park Farm, A4103, Leigh Sinton, Worcestershire (Agenda item 6)
160 KB
Copy queued
Copy on its wayRead here
pl 2020 07 07 Guinness Park Farm: Plan5Item 1045, Proposed extension of building to House 1 No. additional biomass boiler at Go Greener, Guinness Park Farm, A4103, Leigh Sinton, Worcestershire (Agenda item 6)
184 KB
Copy queued
Copy on its wayRead here
Proposed installation of a new terminal pumping station incorporating a pumped storm overflow to replace the existing pumping station at New Street in Upton-upon-Severn to improve capacity and flood resilience on land to the south of New Street, Upton-upon-Severn, Worcestershire (Agenda item 7) PDFItem 1046, Proposed installation of a new terminal pumping station incorporating a pumped storm overflow to replace the existing pumping station at New Street in Upton-upon-Severn to improve capacity and flood resilience on land to the south of New Street, Upton-upon-Severn, Worcestershire (Agenda item 7)
Copy queued
Copy on its wayRead here
pl 2020 07 07 Upton: Plan1Item 1046, Proposed installation of a new terminal pumping station incorporating a pumped storm overflow to replace the existing pumping station at New Street in Upton-upon-Severn to improve capacity and flood resilience on land to the south of New Street, Upton-upon-Severn, Worcestershire (Agenda item 7)
415 KB
Copy queued
Copy on its wayRead here
pl 2020 07 07 Upton: Plan2Item 1046, Proposed installation of a new terminal pumping station incorporating a pumped storm overflow to replace the existing pumping station at New Street in Upton-upon-Severn to improve capacity and flood resilience on land to the south of New Street, Upton-upon-Severn, Worcestershire (Agenda item 7)
540 KB
Copy queued
Copy on its wayRead here
pl 2020 07 07 Upton: Plan3Item 1046, Proposed installation of a new terminal pumping station incorporating a pumped storm overflow to replace the existing pumping station at New Street in Upton-upon-Severn to improve capacity and flood resilience on land to the south of New Street, Upton-upon-Severn, Worcestershire (Agenda item 7)
6 MB
Copy queued
Copy on its wayRead here
pl 2020 07 07 Upton: Plan4Item 1046, Proposed installation of a new terminal pumping station incorporating a pumped storm overflow to replace the existing pumping station at New Street in Upton-upon-Severn to improve capacity and flood resilience on land to the south of New Street, Upton-upon-Severn, Worcestershire (Agenda item 7)
2 MB
Copy queued
Copy on its wayRead here
pl 2020 07 07 Upton: Plan5Item 1046, Proposed installation of a new terminal pumping station incorporating a pumped storm overflow to replace the existing pumping station at New Street in Upton-upon-Severn to improve capacity and flood resilience on land to the south of New Street, Upton-upon-Severn, Worcestershire (Agenda item 7)
1 MB
Copy queued
Copy on its wayRead here
Protocol for Delegation of Decision-making: Proposed amendments (Agenda item 8)Item 1047, Protocol for Delegation of Decision-making: Proposed amendments (Agenda item 8)
229 KB
Copy queued
Copy on its wayRead here
pl 2020 07 07 Scheme of Delegation: App1: Existing schemeItem 1047, Protocol for Delegation of Decision-making: Proposed amendments (Agenda item 8)
397 KB
Copy queued
Copy on its wayRead here
pl 2020 07 07 Scheme of Delegation: App2: Amended schemeItem 1047, Protocol for Delegation of Decision-making: Proposed amendments (Agenda item 8)
408 KB
Copy queued
Copy on its wayRead here

Last time, and what carried over

The committee last met on 26 March 2019. 2 of its items lead into this meeting. Point at any item to follow a thread. Procedural items are left out.

Mar26
26 March 20197 items, 9 papers
Held
carried over
Jul7
7 July 20209 items, 25 papers
Held
1014
Planning application made under Section 73 of the Town and Country Planning Act 1990 (as amended) to vary condition 3 of Planning Permission Reference: 10/000032/CM (Planning Inspectorate Ref: APP/E1855/V/11/2153273) (as amended) to increase throughput of the Envirecover Energy from Waste (EFW) Facility from...
1015
Proposed Pinvin Junction Highway Improvements at Pinvin Junction (Junction between A44, A4104 and B4082), Pinvin, near Pershore, Worcestershire (Agenda item 6)
1044
Temporary Permission (5 years) for a proposed materials recovery plant to process road sweepings and highway drainage clearance materials on land at Station House, Saltway, Hanbury, Worcestershire (Agenda item 5)
1045
Proposed extension of building to House 1 No. additional biomass boiler at Go Greener, Guinness Park Farm, A4103, Leigh Sinton, Worcestershire (Agenda item 6)
1046
Proposed installation of a new terminal pumping station incorporating a pumped storm overflow to replace the existing pumping station at New Street in Upton-upon-Severn to improve capacity and flood resilience on land to the south of New Street, Upton-upon-Severn, Worcestershire (Agenda item 7)
1047
Protocol for Delegation of Decision-making: Proposed amendments (Agenda item 8)

The threads

  • Planning application made under Section 73 of the Town and Country Planning Act 1990 (as amended) to vary condition 3 of Planning Permission Reference: 10/000032/CM (Planning Inspectorate Ref: APP/E1855/V/11/2153273) (as amended) to increas leads to item 1047, Protocol for Delegation of Decision-making: Proposed amendments (Agenda item 8)
  • Proposed Pinvin Junction Highway Improvements at Pinvin Junction (Junction between A44, A4104 and B4082), Pinvin, near Pershore, Worcestershire (Agenda item 6) leads to item 1044, Temporary Permission (5 years) for a proposed materials recovery plant to process road sweepings and highway drainage clearance materials on land at Station House, Saltway, Hanbury, Worcestershire (Agenda item 5)
  • Proposed Pinvin Junction Highway Improvements at Pinvin Junction (Junction between A44, A4104 and B4082), Pinvin, near Pershore, Worcestershire (Agenda item 6) leads to item 1045, Proposed extension of building to House 1 No. additional biomass boiler at Go Greener, Guinness Park Farm, A4103, Leigh Sinton, Worcestershire (Agenda item 6)
  • Proposed Pinvin Junction Highway Improvements at Pinvin Junction (Junction between A44, A4104 and B4082), Pinvin, near Pershore, Worcestershire (Agenda item 6) leads to item 1046, Proposed installation of a new terminal pumping station incorporating a pumped storm overflow to replace the existing pumping station at New Street in Upton-upon-Severn to improve capacity and flood resilience on land to the south of New Street, Upton-upon-Severn, Worcestershire (Agenda item 7)
  • Proposed Pinvin Junction Highway Improvements at Pinvin Junction (Junction between A44, A4104 and B4082), Pinvin, near Pershore, Worcestershire (Agenda item 6) leads to item 1047, Protocol for Delegation of Decision-making: Proposed amendments (Agenda item 8)

Not carried over

Everything from last time returns in some form.

See the 26 March meeting

This committee over time

Every Planning and Regulatory Committee meeting we have read, the dates it has set for the future, and each time those dates have changed.

19 meetings, 2019 to 2025Dot size shows the number of papers
2019202020212022202320242025
HeldThis meeting
MeetingItemsPapers
1 Jul 2025Tuesday
5items
8papers
HeldOpen
26 Nov 2024Tuesday
6items
9papers
HeldOpen
24 Sep 2024Tuesday
8items
11papers
HeldOpen
2 Jul 2024Tuesday
0items
0papers
HeldOpen
19 Mar 2024Tuesday
7items
14papers
HeldOpen
28 Nov 2023Tuesday
8items
15papers
HeldOpen
7 Feb 2023Tuesday
5items
7papers
HeldOpen
31 Oct 2022Monday
4items
8papers
HeldOpen
25 Oct 2022Tuesday
9items
28papers
HeldOpen
5 Jul 2022Tuesday
5items
8papers
HeldOpen
24 May 2022Tuesday
7items
16papers
HeldOpen
22 Mar 2022Tuesday
0items
0papers
HeldOpen
8 Feb 2022Tuesday
0items
0papers
HeldOpen
30 Nov 2021Tuesday
0items
0papers
HeldOpen
26 Oct 2021Tuesday
5items
9papers
HeldOpen
28 Sep 2021Tuesday
10items
29papers
HeldOpen
2 Feb 2021Tuesday
6items
9papers
HeldOpen
7 Jul 2020Tuesday, this meeting
9items
25papers
26 Mar 2019Tuesday
7items
9papers
HeldOpen

Follow the Planning and Regulatory Committee

Choose what you want to hear about. The preview is built from this committee's real papers and changes, so you can see what would have reached you.

What should we tell you?

Worcestershire, Planning and Regulatory Committee

Planning and Regulatory Committee: 3 kinds of updateWorcestershire, sent the same day
PDF
25 papers published for 7 JulyProposed installation of a new terminal pumping station incorporating a pumped storm overflow to replace the existing pumping station at New Street in Upton-upon-Severn to improve capacity and flood resilience on land to the south of New Street, Upton-upon-Severn, Worcestershire (Agenda item 7) and 24 more papers
DAT
Meeting dates updatedAny date added, moved or dropped
DEC
Decisions from 7 JulyThe committee's resolutions, the day they are recorded
ABC
"proposed" found in 4 papersTemporary Permission (5 years) for a proposed materials recovery plant to process road sweepings and highway drainage clearance materials on land at Station House, Saltway, Hanbury, Worcestershire (Agenda item 5) and Proposed extension of building to House 1 No. additional biomass boiler at Go Greener, Guinness Park Farm, A4103, Leigh Sinton, Worcestershire (Agenda item 6)
Each update links to the paper and the council's own copy
Free: one weekly alert. Pro: every option, the same day. Pro Plus: straight into your own systems.

Free

One alert, sent weekly, on titles and decisions.

£0for good
  • 1 alert, weekly summary
  • Titles and decisions
  • Link to every official paper
Save this alert free
Most chosen

Pro

Unlimited alerts the same day, searching every page.

£99per user a month
  • Unlimited alerts, same day
  • Matches inside every page and appendix
  • Every council, not just this one

Pro Plus

Your team, with every match pushed into your own tools.

£449a month, 3 users included
  • Everything in Pro, for 3 users
  • Alerts as webhooks into Slack or a CRM
  • API key and bulk export of this council

Data licence

Every council's records in your own products and research.

£12,000a year, from
  • Unlimited API and full archive delivery
  • Rights to use the data in your products
  • Back to 2000, every council
Talk to us

Never miss what this committee decides

Papers, decisions and date changes for the Planning and Regulatory Committee, and every other committee you follow, the day they appear.

We use a cookie to keep you signed in and run your free-paper allowance, and an optional one to count visits. You can accept all, or choose. Privacy & cookies