CouncilMonitor
194 principal councils 228,996 meetings since 2000 2.8 million official papers archived Straight from each council's own publication system
Feb7Tuesday

Planning and Regulatory Committee

Tuesday 7 February 2023, 10.00amHeld 1387 days ago.
County HallWorcester. Open to the public.
5 items, 7 papersAbout 9.2 MB, led by Proposed retention of existing facilities, operations and access;.
No exempt items listedEvery item is due to be heard in public.
This meeting was held7 February 2023
5items
7papers
–decisions
–exempt
Running order, sized by papersItem 1 to 5
ReportsProcedureExempt parts

The agenda, item by item

What the committee will consider, in order, with every paper attached to its item. Proposed retention of existing facilities, operations and access; is the main business.

1
Procedure

Apologies/Named Substitutes (Agenda item 1)

2
Procedure

Declarations of Interest (Agenda item 2)

3
Procedure

Public Participation (Agenda item 3)

The Council has put in place arrangements which usually allow one speaker each on behalf of objectors, the applicant and supporters of applications to address the Committee. Speakers are chosen from those who have made written representations and expressed a desire to speak at the time an application is advertised. Where there are speakers, presentations are made as part of the consideration of each application.

4
Procedure

Confirmation of Minutes (Agenda item 4)

To confirm the Minutes of the meetings held on 25 October and 31 October 2022. (previously circulated)

5
ReportMain business

Proposed retention of existing facilities, operations and access;

the installation of a wash plant and associated infrastructure for the processing of inert materials, to produce recovered aggregate and soils; the relocation of the waste sorting shed, workshop permitted under planning permission ref: 18/000048/CM, and provision of a new site office at Long Marston Works, Long Marston Road, Long Marston, near Stratford- Upon-Avon (Agenda item 5)

5 papers, 4.1 MBSearch inside with Pro
ReportPR2023 02 07 Long Marston: Plan 1421 KBCopy on its way
ReportPR2023 02 07 Long Marston: Plan 21 MBCopy on its way
ReportPR2023 02 07 Long Marston: Plan 32 MBCopy on its way
ReportPR2023 02 07 Long Marston: Plan 4647 KBCopy on its way
ReportProposed retention of existing facilities, operations and access; the installation of a wash plant and associated infrastructure for the processing of inert materials, to produce recovered aggregate and soils; the relocation of the waste sorting shed, workshop permitted under planning permission refCopy on its way
Read inside all 7 papersPro opens every page, searches every appendix, and keeps the papers if the council removes them.

The main business: Proposed retention of existing facilities, operations and access;

Item 5 is where most of this meeting's papers sit: 5 papers, about 4.1 MB.

Item 5

Proposed retention of existing facilities, operations and access;

the installation of a wash plant and associated infrastructure for the processing of inert materials, to produce recovered aggregate and soils; the relocation of the waste sorting shed, workshop permitted under planning permission ref: 18/000048/CM, and provision of a new site office at Long Marston Works, Long Marston Road, Long Marston, near Stratford- Upon-Avon (Agenda item 5)

What is in the pack5 papers, about 4.1 MB
Report
PR2023 02 07 Long Marston: Plan 1The report to the committee
421 KB
Report
PR2023 02 07 Long Marston: Plan 2The report to the committee
1 MB
Report
PR2023 02 07 Long Marston: Plan 3The report to the committee
2 MB
Report
PR2023 02 07 Long Marston: Plan 4The report to the committee
647 KB
Report
Proposed retention of existing facilities, operations and access; the installation of a wash plant and associated infrastructure for the processing of inert materials, to produce recovered aggregate and soils; the relocation of the waste sorting shed, workshop permitted under planning permission refThe report to the committee
Read and search every page of this itemPro opens all 5 papers, and keeps them if the council removes them.
Get ProCopy on its way

How this item got here

This committee has dealt with the subject before.

24 May 2022Proposed sand and gravel quarry with progressive restoration using site derived and imported material to agricultural parkland, public access and nature enhancement, on land at Lea Castle Farm, Wolverley Road, Broadwaters, Kidderminster, Worcestershire (Agenda item 5)
5 July 2022Proposed importation of inert restoration material and extraction of sand to enable engineering operations for stability purposes and completion of site restoration at (western portion of the former) Sandy Lane Quarry, Wildmoor, Worcestershire (Agenda item 5)
25 October 2022Proposed demolition of existing single storey temporary classroom block, erection of new replacement two-storey classroom building to accommodate 12 no.classrooms, 4 offices and ancillary space, and the relocation and reconfiguration of the existing car park provision at Wolverley CE Secondary...
7 February 2023Proposed retention of existing facilities, operations and access;This meeting.

Every paper for this meeting

All 7 papers in one list, with the item each belongs to, its size, and our copy of it. Download any paper from our archive once signed in; read and search it here with Pro.

PaperSizeOur copy
Agenda frontsheetItem
130 KB
Copy queued
Copy on its wayRead here
Agenda reports packItem
5 MB
Copy queued
Copy on its wayRead here
PR2023 02 07 Long Marston: Plan 1Item 5, Proposed retention of existing facilities, operations and access;
421 KB
Copy queued
Copy on its wayRead here
PR2023 02 07 Long Marston: Plan 2Item 5, Proposed retention of existing facilities, operations and access;
1 MB
Copy queued
Copy on its wayRead here
PR2023 02 07 Long Marston: Plan 3Item 5, Proposed retention of existing facilities, operations and access;
2 MB
Copy queued
Copy on its wayRead here
PR2023 02 07 Long Marston: Plan 4Item 5, Proposed retention of existing facilities, operations and access;
647 KB
Copy queued
Copy on its wayRead here
Proposed retention of existing facilities, operations and access; the installation of a wash plant and associated infrastructure for the processing of inert materials, to produce recovered aggregate and soils; the relocation of the waste sorting shed, workshop permitted under planning permission refItem 5, Proposed retention of existing facilities, operations and access;
Copy queued
Copy on its wayRead here

Last time, and what carried over

The committee last met on 31 October 2022. 1 of its items lead into this meeting. Point at any item to follow a thread. Procedural items are left out.

Oct31
31 October 20224 items, 8 papers
Held
carried over
Feb7
7 February 20235 items, 7 papers
Held
4
Proposed extraction of sand and gravel with restoration using site derived and imported inert material to wetland, nature conservation and agriculture (cross-boundary application) on land at Bow Farm, Bow Lane, Ripple, Worcestershire (Agenda item 4)
5
Proposed retention of existing facilities, operations and access;the installation of a wash plant and associated infrastructure for...

The threads

  • Proposed extraction of sand and gravel with restoration using site derived and imported inert material to wetland, nature conservation and agriculture (cross-boundary application) on land at Bow Farm, Bow Lane, Ripple, Worcestershire (Agenda item 4) leads to item 5, Proposed retention of existing facilities, operations and access;

Not carried over

Everything from last time returns in some form.

See the 31 October meeting

This committee over time

Every Planning and Regulatory Committee meeting we have read, the dates it has set for the future, and each time those dates have changed.

19 meetings, 2019 to 2025Dot size shows the number of papers
2019202020212022202320242025
HeldThis meeting
MeetingItemsPapers
1 Jul 2025Tuesday
5items
8papers
HeldOpen
26 Nov 2024Tuesday
6items
9papers
HeldOpen
24 Sep 2024Tuesday
8items
11papers
HeldOpen
2 Jul 2024Tuesday
0items
0papers
HeldOpen
19 Mar 2024Tuesday
7items
14papers
HeldOpen
28 Nov 2023Tuesday
8items
15papers
HeldOpen
7 Feb 2023Tuesday, this meeting
5items
7papers
31 Oct 2022Monday
4items
8papers
HeldOpen
25 Oct 2022Tuesday
9items
28papers
HeldOpen
5 Jul 2022Tuesday
5items
8papers
HeldOpen
24 May 2022Tuesday
7items
16papers
HeldOpen
22 Mar 2022Tuesday
0items
0papers
HeldOpen
8 Feb 2022Tuesday
0items
0papers
HeldOpen
30 Nov 2021Tuesday
0items
0papers
HeldOpen
26 Oct 2021Tuesday
5items
9papers
HeldOpen
28 Sep 2021Tuesday
10items
29papers
HeldOpen
2 Feb 2021Tuesday
6items
9papers
HeldOpen
7 Jul 2020Tuesday
9items
25papers
HeldOpen
26 Mar 2019Tuesday
7items
9papers
HeldOpen

Follow the Planning and Regulatory Committee

Choose what you want to hear about. The preview is built from this committee's real papers and changes, so you can see what would have reached you.

What should we tell you?

Worcestershire, Planning and Regulatory Committee

Planning and Regulatory Committee: 3 kinds of updateWorcestershire, sent the same day
PDF
7 papers published for 7 FebruaryProposed retention of existing facilities, operations and access; and 6 more papers
DAT
Meeting dates updatedAny date added, moved or dropped
DEC
Decisions from 7 FebruaryThe committee's resolutions, the day they are recorded
ABC
"proposed" found in 1 paperProposed retention of existing facilities, operations and access; the installation of a wash plant and associated infrastructure for the processing of inert materials, to produce recovered aggregate and soils; the relocation of the waste sorting shed, workshop permitted under planning permission ref
Each update links to the paper and the council's own copy
Free: one weekly alert. Pro: every option, the same day. Pro Plus: straight into your own systems.

Free

One alert, sent weekly, on titles and decisions.

£0for good
  • 1 alert, weekly summary
  • Titles and decisions
  • Link to every official paper
Save this alert free
Most chosen

Pro

Unlimited alerts the same day, searching every page.

£99per user a month
  • Unlimited alerts, same day
  • Matches inside every page and appendix
  • Every council, not just this one

Pro Plus

Your team, with every match pushed into your own tools.

£449a month, 3 users included
  • Everything in Pro, for 3 users
  • Alerts as webhooks into Slack or a CRM
  • API key and bulk export of this council

Data licence

Every council's records in your own products and research.

£12,000a year, from
  • Unlimited API and full archive delivery
  • Rights to use the data in your products
  • Back to 2000, every council
Talk to us

Never miss what this committee decides

Papers, decisions and date changes for the Planning and Regulatory Committee, and every other committee you follow, the day they appear.

We use a cookie to keep you signed in and run your free-paper allowance, and an optional one to count visits. You can accept all, or choose. Privacy & cookies