Development Control Committee deferred this item on Thursday 15 September 2005. Below is the council's own wording, with the papers it was decided on.
Resolved
Resolved Deferred for discussions on the proposed embankment works.
Development Control Committee - 15/09/2005
W/05/01154/PN Parish: Harvington
Grid Ref: E:404687.57 N:249338.84 Ward: Harvington & Norton 21
Description: 500MM SUBSOIL FLOOD DEFENCE EMBANKMENT AND DITCH.
Site: Upper Mallin, Leys Road, Harvington, WR11
Applicant: Rooftop Housing Group Ltd
Agent: Robert West Consulting
Date Valid: 07/07/2005 Case Gavin Greenhow Officer: Expiry Date: 01/09/2005 Tel: 01386 565369 Member(s): Cllr Clive G Holt
1. Site Description and Details of Proposal
It is proposed to construct a 0.5m high subsoil flood defence embankment and ditch to the rear of a residential cul-de-sac, Leysfield, accessed off Leys Road, Harvington. The proposed works are an extension to a flood alleviation scheme devised in association with an application for 10 affordable houses on an adjacent greenfield site (see elsewhere on this Agenda - planning reference W/05/00275/PN). The agent for the scheme has submitted the following information with the application:
We are aware that flooding has taken place in Leysfield and along the highway of Leys Road and further to the east with its junction at the main road in the centre of the village.
At present the storm water run-off from the fields to the south west of Leysfield flows unattenuated into the ditch which runs on the south side of Leys Road. Storm water also discharged across the car park and hence along the highway of Leysfield itself which in turn discharged onto the carriageway of Leys Road and thereby bypassed the ditch to the east of the Leysfield junction. Water will then flow in an uncontrolled manner along the Leys Road carriageway.
The proposed development with the introduction of an earth bund and other works to the south and south west of Leysfield and the proposed site will attenuate storm water run-off from the fields as follows:- 1. The bund at the rear of the proposed housing site will have a nominal 225mm diameter outfall pipe laid under the proposed housing site and discharge into the ditch to the south of Leys Road. The drainage system has been detailed to allow for attenuation for a 1% probability (1 in 100 year return) storm situation whereby the storm water is throttled to reduce its flow into the ditch to the south of Leys Road and flooding will occur within the field rather than in the highway or adjacent properties when major storm situations occur. The water to the south of the proposed housing site will then discharge slowly into the drainage system once the peak storm has passed.
2. There will be storm water attenuation in accordance with PPG25 within the housing site itself.
3. The earth bund and ditch in the field immediately to the south of Leysfield will intercept the considerable storm water run off from the field and divert this into an existing 225mm diameter culvert which is already laid to the east of Leysfield itself. Storm water will be controlled by the capacity of this culvert and will then be stored within the ditch course to the south of Leys Road.
The bund will also intercept any overland flow, as has occurred previously, where storm water flows across the car park and through Leysfield onto the carriageway and into Leys Road itself.
It is therefore felt by ourselves and confirmed by Wychavon District Council's Drainage Engineers, that the proposed works will attenuate major flood flows from the field and discharge in a controlled manner into the existing drainage system within Leys Road. It will also protect the existing properties in Leysfield and the new development.
Pro opens the officer report behind each decision, searchable and quotable, across every council we cover.
PDF |
Planning Application W/05/01154/PN: 500m subsoil flood defence embankment and ditch. Upper Mallin, Leys Road, Harvington WR11. Rooftop Housing Group Ltd.Report | 37 KB | DownloadRead as text |
Follow Development Control Committee at Wychavon and we tell you when its next papers are published, before the meeting rather than after it.
| Meeting | Decision | Outcome | |
|---|---|---|---|
| 28 Apr 2011 | Minutes.Resolved That the Minutes of the Committee held on 31 March 2011 be approved as a correct record of the proceedin g s... | Approved | Open |
| 28 Apr 2011 | Planning Application Ref W/11/00298/PN.Resolved Conditionally approved:- Z001 The development hereby permitted shall be begun no later than the expiration o... | Approved | Open |
| 28 Apr 2011 | Planning Application Ref W/10/03096/RM. Reserved Matters Application following the granting of Outline Planning Permission Ref W/09/01690/OU for construction of 28 dwellings. ( Including 8 no. Affordable Units). Land to the rear of including and, 27 Brewers Lane, Badsey. Crest Nicholson.Resolved That this matter be deferred to await receipt of a revised layout plan to address comments made by the Count... | Deferred | Open |
| 28 Apr 2011 | Planning Application Ref W/11/0004/PN. Erection of two detached dwellings. Land Adjacent, 19 Oak Tree Lane, Cookhill. Mr Ryan.Resolved That this item be refused for the following reason:- It is considered that the erection of two detached dwel... | Refused | Open |
| 28 Apr 2011 | Planning Application Ref C/11/00658/CM. Proposed Anaerobic Digestion Plant, new roundabout access and associated ancillary infrastructure. Spring Hill Farm, Salters Lane, Fladbury, WR10 2PE. Mr A Bille.Resolved That the Council provide the following comments in response to the County Council consultation. The Council ... | Noted | Open |
We use a cookie to keep you signed in and run your free-paper allowance, and an optional one to count visits. You can accept all, or choose. Privacy & cookies
Keeps you signed in and runs your free-paper allowance. Always on.
Counts visits and which pages are used. First-party only, no advertising, never shared.