Resolved
Resolved That planning permission be granted, and that the Head of Planning be authorised to issue the decision notice subject to the completion of a satisfactory Section 106 agreement including appropriate mechanisms for the delivery and retention of affordable housing as well as contributions towards education, public open space, cycling strategy and recycling infrastructure, the conditions below and any other conditions deemed appropriate by her:- T002 The development hereby permitted shall be begun before the expiration of three years from the date of this permission. Reason: In accordance with the requirements of Section 91 (1) of the Town and Country Planning Act 1990 as amended by Section 51 of the Planning and Compulsory Purchase Act 2004. H05 Before any other works hereby approved are commenced, visibility splays shall be provided from a point 0.6m above ground level at the centre of the access to the application site and 4.5 metres back from the nearside edge of the adjoining carriageway, (measured perpendicularly), for a distance of 60 metres in each direction along the nearside edge of the adjoining carriageway. Nothing shall be planted, erected and/or allowed to grow on the triangular area of land so formed which would obstruct the visibility described above. Reason: In the interests of highway safety. Z001 Development shall not begin until the engineering details and specification of the proposed roads, footways, turning head and highway drains have been submitted to and approved in writing by the Local Planning Authority. Reason: To ensure an adequate and acceptable means of access is available before the dwellings are occupied. H35 The development shall not be occupied until the roadworks necessary to provide access from the nearest publicly maintained highway have been completed in accordance with details submitted to and approved in writing by the Local Planning Authority. Reason: To ensure an adequate and acceptable means of access is available before the dwellings are occupied. H36 All roadworks shall be completed within a period of two years or other period agreed in writing from the commencement of work on the site, or within six calendar months of the substantial completion of 75% of the building(s) {no. of dwellings} hereby approved if this is sooner. This will entail the making good of surfacing, grassing and landscaping in accordance with a specification submitted to and approved in writing by the Local Planning Authority. (Nothing in this condition shall conflict with any phasing scheme, in which respect it will be interpreted as applying to the particular phase being implemented). Reason: In the interests of highway safety and convenience ... view the full minutes text for item 10.