Resolved
Resolved Conditionally approved:- T002 The development hereby permitted shall be begun before the expiration of three years from the date of this permission. Reason: In accordance with the requirements of Section 91 (1) of the Town and Country Planning Act 1990 as amended by Section 51 of the Planning and Compulsory Purchase Act 2004. A004 Samples of the external facing bricks and roof materials shall be subject to the approval, in writing, of the Local Planning Authority before any work on the site commences. Reason: To ensure that the development is visually satisfactory. LS02 Where a satisfactory landscape scheme has been submitted as part of the application All planting and seeding/turfing comprised in the submitted landscape scheme, hereby approved, shall be carried out in the first planting season following the completion or first occupation/use of the development, whichever is the sooner. All planting shall be watered as necessary and competitive weed growth controlled to ensure successful establishment. Any trees or plants which, within a period of five years from the completion of the planting, die, are removed or become seriously damaged or diseased shall be replaced in the next planting season with others of similar size and species, unless otherwise agreed in writing by the Local Planning Authority. Reason: To protect and enhance the visual amenities of the area and to ensure the satisfactory development of the site - in accordance with Policy GD2, Policy ENV1 and Policy SUR2 of the Wychavon District Local Plan (June 2006). Z001 Development shall not begin until the results of percolation tests carried out in accordance with B.S. 6297;1983, or Building Research Establishment Digest 365, have been submitted to and approved in writing by the Local Planning Authority. Should ground conditions prove unsuitable, or insufficient land is available, for the use of infiltration systems, then the Developer will need to submit an alternative means of disposal for surface water from the development. Where possible sustainable drainage systems should be incorporated into the design and additional flow should not be discharged downstream. Reason: To ensure a satisfactory means of drainage is available to serve the development, for the lifetime of the development and to minimise the risk of exacerbating existing, or creating new, flooding problems downstream of the development. H06 Before any other works hereby approved are commenced, the access into the application site shall be so constructed that there is clear visibility from a point 0.6m above the level of the adjoining carriageway at the centre of the access 2.4 metres from and parallel to the entire length of the site frontage. Nothing shall be planted, erected and/or allowed to grow on the area of land so formed which would obstruct the visibility described above. Reason: In the interests of highway safety. ... view the full minutes text for item 17.