AI summaryWychavon Executive Board considers two options to refurbish the nearly 25 years old health suite at Pershore Leisure Centre and recommends the preferred scheme, costing up to £777,500 plus VAT, to Council for the 2026/27 capital programme.
Written from the decision and the officer reportPDF Pro
OutcomeApprovedBoard to choose from two options and recommend to Council
MoneyUp to £777,500 plus VATFunded from capital budget and regeneration reserves
What happens nextRecommend to CouncilCouncil to decide on 2026/27 capital programme inclusion
Who it affectsPershore Leisure Centre usersUsers and members in Pershore ward, Wychavon
What was decided
The Board considered the report on refurbishment options and identified a preferred scheme to proceed to technical design and delivery. Report P5
The Board recommended to Council to include the cost of the preferred scheme in the 2026/27 capital programme and approve the funding gap from reserves. Report 2.2
Authority was delegated to the Deputy Chief Executive, in consultation with the relevant portfolio holders, to finalise the scope within budget and enter contracts. Report 2.3
Why
The health suite is nearly 25 years old, with the spa pool delaminating, the spa plant worn out, and many members choosing not to use it.
WLCA, which manages the centre, prefers Option 2 because a larger health suite with heat and cold treatments would support increased footfall and revenue at a centre that is only just covering costs. Report 4.5, 4.7
The centre is on a floodplain so cannot be extended externally, making better use of existing space the only option for improvement. Report 4.6, 4.7
What happens next
Council to consider including the preferred scheme cost in the 2026/27 capital programme and approving the funding gap from reserves. Report 2.2
If estimated costs prove insufficient at the technical design stage and cannot be reduced through value engineering, a further report will be presented to members. Report 5.3
A separate report on renewing and updating the leisure centre leases with a profit share agreement will be presented to members in November. Report 4.8
The money
£575,570 plus VAT Estimated cost of Option 1 (replicate existing amenities) Report P19
£777,500 plus VAT Estimated cost of Option 2 (extended health suite) Report P20
£182,570 Building Enhancements capital budget contribution for Option 1 Report P22
£182,500 Building Enhancements capital budget contribution for Option 2 Report P25
£393,000 Regeneration reserves drawdown for Option 1 Report P23
£595,000 Regeneration reserves drawdown for Option 2 Report P26
Options considered
Considered: Option 1: Use the existing health suite room, redesigned to maximise use, replicating existing amenities (jacuzzi, steam room, sauna, shower, relaxing area). Limited by room size, so no additional spa amenities possible Report 4.4, P19
Considered: Option 2: Knock through into the adjoining male changing room to create a larger health suite with additional heat and cold treatment amenities. WLCA's preferred option; the male changing area is underused, and a larger suite would support increased footfall Report 4.5, 4.6, 4.7, P20
Implications
Financial: Capital expenditure of up to £777,500 plus VAT, funded from the Building Enhancements capital budget and Regeneration reserves. Report P20, P25, P26
Risk: There is a risk that the estimated cost will prove insufficient at the technical design stage; if costs cannot be reduced through value engineering, a further report will be presented to members. Report 5.3
Legal: Contracts and legal agreements for the refurbishment works will be entered into under delegated authority to the Deputy Chief Executive.
Equalities: No equality issues have been identified around this project. Report 6.3
Who and where
Users and members of Pershore Leisure Centre in Pershore ward Report P2, 4.7
Wychavon Leisure Community Association Ltd (WLCA), which manages the centre Report 4.7
2003: Pershore Leisure Centre rebuilt with the original health suite
12th Feb 2025: Members received a report on Building Enhancements Budget progress and spend, noting the health suite budget and scope needed review Report 3.2
April 2025 to April 2026: Centre had 12,816 visits, below the expected close to 20,000 visits per year Report 4.7
16 September 2026: Executive Board decision on refurbishment Report P1
November 2026: Separate report to members on renewing leisure centre and lido leases with a profit share agreement Report 4.8
2026/27: Planned installation of the refurbished health suite Report 3.2
Plain English for the jargon
WLCA: Wychavon Leisure Community Association Ltd, the organisation that manages Pershore Leisure Centre
RIBA stages: Royal Institute of British Architects design stages; Stage 2 is concept feasibility and Stages 3 to 4 are technical design
Capital programme: The Council's planned spending on long-term assets, funded from capital budgets and reserves
What was decided, why, and what happens next
Pro reads every officer report for you and explains each decision in plain English: the money, the options, the risks, the timeline, each with the paragraph it came from.
Written by AI from the council's published papers. AI can get things wrong: the council's own wording below is the record.Report a problem
Item25
Resolved
Resolved 1. That the Executive Board considers the report to refurbish the Pershore leisure centre health suite and the feasibility design options and costs and identify a preferred scheme to proceed to the next stages of technical design and delivery. 2. That the Executive Board recommends to Council to include the cost of the preferred scheme in the 2026/27 capital programme and approve the funding gap from reserves as set out in section 5 of the report. 3. To delegate to the Deputy Chief Executive in consultation with the Portfolio Holder for Resources, Investment and Innovation authority to agree the detail on how the facility will be finally scoped within budget. 4. To delegate to the Deputy Chief Executive in consultation with the Portfolio Holder for Resources, authority to enter into any appropriate contracts and legal agreements associated with the refurbishment works.
Word for word from the decision Wychavon published for this meeting.Source: mgov.wychavon.gov.uk
Pershore Leisure Centre Health Suite Relevant wards: Pershore Portfolio holder: Cllr Emma Stokes
Head of Service: Jayne Pickering, Deputy Chief Executive Contact officer: Janette Becket, Head of Property and Development If you have any questions about this report, please contact the portfolio holder or the contact officer.
1. Purpose and summary 1.1 To seek approval for the refurbishment of the health suite at Pershore leisure centre and for members to identify their preferred option.
2. Recommendations 2.1 That the Executive Board considers the report to refurbish the Pershore leisure centre health suite and the feasibility design options and costs and identify a preferred scheme to proceed to the next stages of technical design and delivery.
2.2That the Executive Board recommends to Council to include the cost of the preferred scheme in the 2026/27 capital programme and approve the funding gap from reserves as set out in section 5 of the report.
2.3To delegate to the Deputy Chief Executive in consultation with the Portfolio Holder for Resources, Investment and Innovation authority to agree the detail on how the facility will be finally scoped within budget. 2.4 To delegate to the Deputy Chief Executive in consultation with the Portfolio Holder for Resources, authority to enter into any appropriate contracts and legal agreements associated with the refurbishment works.
3. Background 3.1 The health suite within Pershore leisure centre is nearly 25 years old being the original from when the centre was rebuilt in 2003. It has come to the end of its life and in need of replacement, being uneconomic to repair the existing sauna and steam rooms and associated equipment. The spa pool construction is delaminating, the spa plant is worn out, and the general area has deteriorated with time and use. These items are all well beyond their expected service life and are not providing a quality experience for users with many members choosing not to use it as a consequence. It is the Council’s responsibility to replace.
3.2There are allocated funds for works to the health suite included in the Building Enhancements Budget which was approved to cover capital cost for maintaining and replacing building elements where the Council is responsible. On 12th Feb 2025 members received a report on the update to the progress and spend against this budget and within the report advised that the scope of works and budget identified for the health suite needed to be reviewed to provide updated costs for member approval for a whole refurbishment and planned installation in 2026/27. This was acknowledged.
4. Feasibility Outcome 4.1 Following a procurement exercise Quattro Design Architects were appointed to work with both Wychavon Leisure Community Association Ltd who manages the centre (WLCA) and the Council to produce concept feasibility designs (RIBA stage 2).
4.2For context Appendix 1 shows the current layout of the leisure centre’s ‘wet’ side’ changing and shower rooms and the location of the current health suite.
4.3After several iterations and meetings bringing together the designer’s expertise and WLCA’s operational knowledge, it was narrowed down to 2 options to present to members.
4.4Option 1 as shown in Appendix 2 uses the existing health suite room but has redesigned the space to maximise the use and flow of the area although this is limited due to the size. There wouldn’t be space for additional spa amenities so would just replicate the existing namely, a jacuzzi, steam room, sauna, shower and a relaxing area.
Read every report as text, not just the decision
Pro opens the officer report behind each decision, searchable and quotable, across every council we cover.
Minutes of the Previous MeetingResolved That the minutes of the meeting of the Executive Board held on Wednesday 24 June 2026 be confirmed as a corr...
We use a cookie to keep you signed in and run your free-paper allowance, and an optional one to count visits. You can accept all, or choose. Privacy & cookies
Necessary
Keeps you signed in and runs your free-paper allowance. Always on.
Always on
Analytics
Counts visits and which pages are used. First-party only, no advertising, never shared.