Council Depot, Hazel Court, York, YO10 3DS (06/01484/GRG3)
ApprovedPlanning2 papers
West & City Centre Area Planning Sub-Committee approved this item on Thursday 17 August 2006. Below is the council's own wording, with the papers it was decided on.
That the application be approved in line with the conditions and informatives in the report. REASON: The proposal complies with Policies GP4, GP5 and GP1 of the City of York Local Plan Deposit Draft; national planning guidance contained in Planning Policy statement Notes 1 “delivering Sustainable Development” and No.22 “Renewable Energy”.
Word for word from the decision York published for this meeting.Source: democracy.york.gov.uk
Report to West & City Centre Area Planning Sub-Committee
COMMITTEE REPORT
Committee: West and City Centre Ward: Guildhall Date: 17 August 2006 Parish: Guildhall Planning Panel
Reference: 06/01484/GRG3 Application at: Council Depot Hazel Court York YO10 3DS For: Erection of a 15 metre high wind turbine (re-submission) By: City Of York Council Application Type: General Regulations (Reg3) Target Date: 30 August 2006
1.0PROPOSAL
1.1This application is for a 15kw wind turbine on a 15m mast to be sited in the centre of the car park of the Council's EcoDepot that is currently under construction. The turbine would generate electricity for use in the council depot and any surplus would be sold to the national grid. It is anticipated that the turbine would cover 18- 20% of the energy requirements of the site.
1.2The council depot includes innovative designs, materials and technologies with the overall aim of reducing greenhouse gas emissions ( GHG ) that cause climate change. As the major contributor to GHG emissions will be its energy use, it was considered appropriate to include a wind turbine to produce energy from a renewable source. The turbine would work in tandem with other renewable energy technologies ( Photovoltaic Cells on the Amenities Building and the Eco Office Building ) to generate electricity and using the sun and a solar thermal system to heat water. These measures would contribute to York meeting its renewable energy targets as set by the Regional Assembly and endorsed in the draft regional Spatial Strategy.
1.3An earlier proposal for a wind turbine on a 25m mast to be sited in the south western corner of the site was withdrawn following further consideration of this siting. The revised siting to this more central siting would maximise wind speeds and therefore improve efficiency. The application has been accompanied by a noise impact assessment report.
1.4Members of the Centre and West Sub -Committee were invited to visit a similar example at a school in Kirklees, West Yorkshire. This was followed by a daytime and an evening session at the Environment Centre, St. Nicholas Fields where the proposals were on show and staff were available to explain the proposals to the public. The turbine would be the same make as the existing 9m x 2 Kw mast at the nearby Environment Centre in St Nicholas Fields.
2.0POLICY CONTEXT
2.1Development Plan Allocation:
City Boundary York City Boundary 0001
Floodzone 2 Flood Zone 2 CONF
Floodzone 3 Flood Zone 3
2.2Policies:
Application Reference Number: 06/01484/GRG3 Item No: i Page 1 of 5 CYGP4A Sustainability
CYGP5 Renewable energy
CYGP1 Design
3.0CONSULTATIONS
3.1INTERNAL
ENVIRONMENTAL PROPTECTION UNIT-
There are no objections to this proposal. A Noise Impact Assessment was carried out at the local authority's request to ensure that noise from the proposed turbine would not affect the amenity of nearby occupiers of premises. A visit was made to witness the type of noise made by a 15kW turbine on a 15 metre mast situated close to residential properties in West Yorkshire. The noise from that turbine was barely audible at a distance of 10 metres and was unlikely to be a source of noise nuisance to nearby residential properties. The assessment indicated that noise from the turbine would be unlikely to cause noise complaints from nearby residents, and the noise levels would be within acceptable limits as recommended by the World Health Organisation for the workers in office buildings close to the site. It is recommended that a condition be attached to any approval of planning permission to ensure that the turbine is maintained and serviced according to the manufacturer's instructions to prevent any decrease in its efficiency or increase in noise levels to the detriment of noise sensitive premises in the area.
HIGHWAY NETWORK MANAGEMENT- No objection
URBAN DESIGN AND CONSERVATION- No comments received.
3.2EXTERNAL
Guildhall Planning Panel- No objections but would seek the safeguard of temporary planning permission so that the Local Planning Authority can monitor the visual and other impacts.
Read every report as text, not just the decision
Pro opens the officer report behind each decision, searchable and quotable, across every council we cover.
Councillor Susan SunderlandCommittee Member, apologies
BW
Councillor Brian WatsonCommittee Member, present
Hear about the next one first
Follow West & City Centre Area Planning Sub-Committee at York and we tell you when its next papers are published, before the meeting rather than after it.
We use a cookie to keep you signed in and run your free-paper allowance, and an optional one to count visits. You can accept all, or choose. Privacy & cookies
Necessary
Keeps you signed in and runs your free-paper allowance. Always on.
Always on
Analytics
Counts visits and which pages are used. First-party only, no advertising, never shared.