Lendal Hill House, Museum Street, York, YO1 7DT (06/01323/LBC)
ApprovedPlanning2 papers
West & City Centre Area Planning Sub-Committee approved this item on Thursday 17 August 2006. Below is the council's own wording, with the papers it was decided on.
That the application be approved in line with the conditions and informatives outlined in the report. REASON: That the proposal complies with Policy E4 of the North Yorkshire County Structure Plan (Alteration No.3 Adopted 1995) and Policies HE4 and HE9 of the City of York Local Plan Deposit Draft.
Word for word from the decision York published for this meeting.Source: democracy.york.gov.uk
Report to West & City Centre Area Planning Sub-Committee
COMMITTEE REPORT
Committee: West and City Centre Ward: Guildhall Date: 17 August 2006 Parish: Guildhall Planning Panel
Reference: 06/01323/LBC Application at: Lendal Hill House Museum Street York YO1 7DT For: Erection of boundary railings and alterations to outbuilding to form storage area By: Lendal Tower Venture Application Type: Listed Building Consent Target Date: 17 August 2006
1.0PROPOSAL
1.1In May 2005, consent was granted for four linked applications relating to the restoration of the complex of buildings at Lendal Tower. Consent was granted for the change of use of Lendal Tower to a single dwelling house and for the change of use of Lendal Hill House to form two dwellings. The engine house, which lies to the west of Lendal House and Lendal Hill House between which are private gardens, is to be the subject of a future application for redevelopment.
1.2This application seeks listed building consent to subdivide the area of private garden between the Tower/Hill House Group and the engine house through the erection of boundary railings. Alterations to a small single storey outbuilding leaning to the engine house to form a garden room/ storage area for the use of the future occupants of Lendal Hill House and Lendal Tower, is also proposed.
1.3Cllr B. Watson has requested that this application be considered at Committee.
2.0POLICY CONTEXT
2.1Development Plan Allocation:
Areas of Archaeological Interest City Centre Area 0006
Conservation Area Central Historic Core 0038
City Boundary York City Boundary 0001
DC Area Teams Central Area 0002
Floodzone 2 Flood Zone 2 CONF
Floodzone 3 Flood Zone 3
Listed Buildings Multiple (Spatial)
Scheduled Ancient Monuments Multiple (Spatial)
Application Reference Number: 06/01323/LBC Item No: k Page 1 of 4 2.2 Policies:
CYHE4 Listed Buildings
CYHE9 Scheduled Ancient Monuments
3.0CONSULTATIONS
3.1Internal
Urban Design and Conservation - The subdivision of the garden was not part of the original approved scheme. However proposals appear lightweight and reasonable, subject to details. The small outbuilding though is currently associated with the engine house as it is firmly attached and also linked through by means of a door. To consider this part of the proposal, we would require the application to show (i) blocking up of this access, (ii) a written or drawn assessment of the engine house demonstrating why these proposals would not compromise any future reuse of the engine house.
3.2External
Guildhall Planning Panel - Object. The proposed railings, their design, are out of character with the listed buildings where traditional wrought iron railings should be sought.
Consultation Period Expiry Date - 21st July 2005 - No comments received.
4.0APPRAISAL
4.1Key Issues - impact upon the character and appearance of the listed building and scheduled ancient monument.
4.2Draft Local Plan Policy HE4 refers to listed buildings and states that consent will only be granted for internal or external alterations or for development in the immediate vicinity of listed buildings where there is no adverse effect on the character, appearance or setting of the building. Draft Policy HE9 states that permission will not be granted for development which would adversely affect a scheduled ancient monument or its setting.
4.3Lendal Tower is a stone tower dating from the 13th Century. It is Grade 1 listed and a Scheduled Ancient Monument. Lendal Hill House is built against the north east side of Lendal Tower. It is two storeys in height, excluding the attic, and is of dark red brick construction. It dates from the late eighteenth century and is a Grade II listed building.
4.4West of Lendal Tower and Lendal Hill House is a separate block of two storey buildings, marked as offices on the Ordnance Survey plan. The block was built as an engine house about 1836, then converted to offices for the York New Waterworks Company in around 1854. They are also Grade II listed buildings and have some recent extensions. Between them and the Tower/Hill House Group is an area of private gardens.
Read every report as text, not just the decision
Pro opens the officer report behind each decision, searchable and quotable, across every council we cover.
Councillor Susan SunderlandCommittee Member, apologies
BW
Councillor Brian WatsonCommittee Member, present
Hear about the next one first
Follow West & City Centre Area Planning Sub-Committee at York and we tell you when its next papers are published, before the meeting rather than after it.
We use a cookie to keep you signed in and run your free-paper allowance, and an optional one to count visits. You can accept all, or choose. Privacy & cookies
Necessary
Keeps you signed in and runs your free-paper allowance. Always on.
Always on
Analytics
Counts visits and which pages are used. First-party only, no advertising, never shared.